Back when S&L banks were getting into NOW accounts, what we know as checking 
accounts, I was hired to be the manager of systems programming.  They were 
running unsupported versions of the operating system, CICS, BTAM and everything 
else.  They had a 99.9% up-time and every one slept well, all because nothing 
had changed in YEARS.
Then they had to bring in new software to do check processing and it needed 
current versions of the software and go to VTAM.
Making all those changes, and not having another machine to do it on, was a 
challenge. There were bumps in the road, but we stayed at over 95% uptime and 
clawed our way back to over 99%.
Management slept well, I didn't for about 3 months.  Oh, and then they decided 
to move the data center.

Chris Blaicher
Technical Architect
Mainframe Development
Syncsort Incorporated
2 Blue Hill Plaza #1563, Pearl River, NY 10965

P: 201-930-8234  |  M: 512-627-3803
E: [email protected]

www.syncsort.com

CONNECTING BIG IRON TO BIG DATA

-----Original Message-----
From: IBM Mainframe Discussion List [mailto:[email protected]] On Behalf 
Of David Crayford
Sent: Wednesday, April 19, 2017 10:26 AM
To: [email protected]
Subject: Re: Old hardware

How do your management sleep at night with an unsupported software?


On 19/04/2017 8:58 PM, John McKown wrote:
> That is interesting to know. But, unless the situation changes (IMO
> "for the better"), then we are stuck on our current configuration
> FOREVER. Upper management utterly hates, despises, abhors, and
> denigrates the existence of z/OS. They truly seem to be "all Windows,
> all the time!". I firmly believe that we could upgrade z/OS if and
> only if the current I.T. management is completely replaced (and the COO as 
> well).
>
> We have a number of software packages on a permanent execution
> license, but with _no_ upgrades or support included. When we upgraded
> from z/OS 1.10 to 1.12, one of them died a horrible death. It put in
> an address space termination exit which would _occasional_ abend with
> S0C4-?? . I found that happened when the address space was in some
> sort of cross memory mode. I had to create my own "patch" which
> basically detected this and made a branch to the "right place". So,
> upgrading z/OS is definitely out of the question. It could well cause
> more products to abend due to incompatibilities and we would be stuck.
>
> On Wed, Apr 19, 2017 at 12:01 AM, Timothy Sipples <[email protected]>
> wrote:
>
>> John McKown wrote:
>>> ​z9BC here. A two CP machine. Two LPARs running z/OS 1.12, but one
>>> is just my "sandbox"​.
>> FYI, since the announcement of IBM Multi-Version Measurement (MVM):
>>
>> https://www.ibm.com/common/ssi/rep_ca/3/897/ENUS217-093/ENUS217-093.P
>> DF
>>
>> you are permitted to run newer IBM products that are compatible with
>> your machine, within the same capacity(ies), at no additional
>> charge.(**) Or, in other words, there is no more Single Version
>> Charge (SVC) period. (Hurray!) MVM begins on June 1, 2017, based on
>> your May, 2017, Sub-Capacity Reporting Tool (SCRT) submission. Since
>> SVC offered a minimum of 12 months, anything newer that you start
>> running now will only consume one or two months of SVC before MVM kicks in. 
>> In other words, MVM has effectively already arrived.
>>
>> Here are some examples of software releases compatible with your z9BC
>> machine:
>>
>> z/OS Version 2.1 (not 2.2 or above)
>> DB2 Version 10 for z/OS (not 11 or above) Enterprise COBOL Version
>> 6.1 (*) CICS Transaction Server Version 5.3 (*) IBM SDK for z/OS Java
>> Technology Edition Version 8 (*) WebSphere MQ Version 9 for z/OS (*)
>>
>> (*) Latest releases as I write this.
>>
>> All of the software releases listed above are currently IBM
>> supported, as I write this. DB2 10 will reach End of Service (EoS) on 
>> September 30, 2017.
>> Since DB2 10 requires z/OS 1.10 or higher, if you're running DB2 then
>> you might already have Version 10.
>>
>> Of course I don't recommend staying on a z9BC machine, but you can
>> still move up somewhat without additional charge and without a machine 
>> upgrade.
>> Indeed possibly a lower peak processor utilization requirement, for
>> example if you put Enterprise COBOL Version 6.1 to good use.
>>
>> (**) Read the fine print since it's *possible* to do something
>> otherwise, as always.
>>
>> ------------------------------------------------------------
>> --------------------------------------------
>> Timothy Sipples
>> IT Architect Executive, Industry Solutions, IBM z Systems, AP/GCG/MEA
>> E-Mail: [email protected]
>>
>> ---------------------------------------------------------------------
>> - For IBM-MAIN subscribe / signoff / archive access instructions,
>> send email to [email protected] with the message: INFO
>> IBM-MAIN
>>
>
>

----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions, send email to 
[email protected] with the message: INFO IBM-MAIN

________________________________



ATTENTION: -----

The information contained in this message (including any files transmitted with 
this message) may contain proprietary, trade secret or other confidential 
and/or legally privileged information. Any pricing information contained in 
this message or in any files transmitted with this message is always 
confidential and cannot be shared with any third parties without prior written 
approval from Syncsort. This message is intended to be read only by the 
individual or entity to whom it is addressed or by their designee. If the 
reader of this message is not the intended recipient, you are on notice that 
any use, disclosure, copying or distribution of this message, in any form, is 
strictly prohibited. If you have received this message in error, please 
immediately notify the sender and/or Syncsort and destroy all copies of this 
message in your possession, custody or control.

----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions,
send email to [email protected] with the message: INFO IBM-MAIN

Reply via email to