I'm missing something about the CONTROLLER. When I tried to remove the o
ld
OSA from VSWITCH1, I got this error
set vswitch vswitch1 rdev 2708
HCPSWU2830I VSWITCH SYSTEM VSWITCH1 status is ready.
HCPSWU2830I DTCVSW2 is VSWITCH controller for device 1E08.P00.
HCPSWS2799E VSWITCH change is not allowed.
q controller
Controller DTCVSW2 Available: YES VDEV Range: * Level 540
Capability: IP ETHERNET VLAN_ARP GVRP LINKAGG ISOLATION
SYSTEM VSWITCH1 Primary Controller: * VDEV: 1E08
SYSTEM VSWITCH2 Primary Controller: * VDEV: 1F08
Controller DTCVSW1 Available: YES VDEV Range: * Level 540
Capability: IP ETHERNET VLAN_ARP GVRP LINKAGG ISOLATION
SYSTEM VSWITCH1 Backup Controller: * VDEV: 2708
Do I need to make DTCVSW2 the controller for 2708?