I'm missing something about the CONTROLLER.  When I tried to remove the o
ld 
OSA from VSWITCH1, I got this error

set vswitch vswitch1 rdev 2708               
                 
HCPSWU2830I VSWITCH SYSTEM VSWITCH1 status is ready.       
   
HCPSWU2830I DTCVSW2 is VSWITCH controller for device 1E08.P00.
HCPSWS2799E VSWITCH change is not allowed.

q controller                     
                         
            
Controller DTCVSW2   Available: YES   VDEV Range: *         Level 540 
  Capability: IP ETHERNET VLAN_ARP GVRP    LINKAGG    ISOLATION    
   
   SYSTEM VSWITCH1   Primary          Controller: *         VDEV: 1E08
   SYSTEM VSWITCH2   Primary          Controller: *         VDEV: 1F08
Controller DTCVSW1   Available: YES   VDEV Range: *         Level 540 
  Capability: IP ETHERNET VLAN_ARP GVRP    LINKAGG    ISOLATION    
   
   SYSTEM VSWITCH1   Backup           Controller: *         VDEV: 2708

Do I need to make DTCVSW2 the controller for 2708?

Reply via email to