[
https://issues.apache.org/jira/browse/HBASE-5033?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13174489#comment-13174489
]
Phabricator commented on HBASE-5033:
------------------------------------
Liyin has commented on the revision "[jira][HBASE-5033][[89-fb]]Opening/Closing
store in parallel to reduce region open/close time".
INLINE COMMENTS
src/main/java/org/apache/hadoop/hbase/regionserver/HRegion.java:807 The
region server will retry to close the store if the previous close operation
failed. So a local thread pool makes more sense here.
src/main/java/org/apache/hadoop/hbase/HConstants.java:193 I will update to
"hbase.hstore.open.close.threads.max"
REVISION DETAIL
https://reviews.facebook.net/D933
> Opening/Closing store in parallel to reduce region open/close time
> ------------------------------------------------------------------
>
> Key: HBASE-5033
> URL: https://issues.apache.org/jira/browse/HBASE-5033
> Project: HBase
> Issue Type: Improvement
> Reporter: Liyin Tang
> Assignee: Liyin Tang
> Attachments: D933.1.patch, D933.2.patch, D933.3.patch, D933.4.patch
>
>
> Region servers are opening/closing each store and each store file for every
> store in sequential fashion, which may cause inefficiency to open/close
> regions.
> So this diff is to open/close each store in parallel in order to reduce
> region open/close time. Also it would help to reduce the cluster restart time.
> 1) Opening each store in parallel
> 2) Loading each store file for every store in parallel
> 3) Closing each store in parallel
> 4) Closing each store file for every store in parallel.
--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators:
https://issues.apache.org/jira/secure/ContactAdministrators!default.jspa
For more information on JIRA, see: http://www.atlassian.com/software/jira