On Fri, Jul 13, 2007 at 03:49:41PM -0700, James G. Sack (jim) wrote:
> Yesterday I got an email from RR announcing a no-cost increase in
> download speed from 5Mbps to 7Mbps.
> 
> It said nothing about schedule, but on trying it (after cable disconnect
> and power cycle, per email instructions), I still get the same old
> 4.8Mbps (via speedtest or speakeasy).
> 
> Called RR, and the tech was able to verify the current 5Mbps D/L rate
> via remote diagnostics.
> 
> ==> He says the email _should have_ said something like 'by July 30'.
> 
> .. So if anyone else is wondering what's up, I guess we should wait
> 'till the end of the month before griping.

Does this include Earthlink over cable?  I hope? :-)

-- 
***********************************************************************
* John Oliver                             http://www.john-oliver.net/ *
*                                                                     *
***********************************************************************


-- 
[email protected]
http://www.kernel-panic.org/cgi-bin/mailman/listinfo/kplug-list

Reply via email to