On Fri, Jul 13, 2007 at 03:49:41PM -0700, James G. Sack (jim) wrote: > Yesterday I got an email from RR announcing a no-cost increase in > download speed from 5Mbps to 7Mbps. > > It said nothing about schedule, but on trying it (after cable disconnect > and power cycle, per email instructions), I still get the same old > 4.8Mbps (via speedtest or speakeasy). > > Called RR, and the tech was able to verify the current 5Mbps D/L rate > via remote diagnostics. > > ==> He says the email _should have_ said something like 'by July 30'. > > .. So if anyone else is wondering what's up, I guess we should wait > 'till the end of the month before griping.
Does this include Earthlink over cable? I hope? :-) -- *********************************************************************** * John Oliver http://www.john-oliver.net/ * * * *********************************************************************** -- [email protected] http://www.kernel-panic.org/cgi-bin/mailman/listinfo/kplug-list
