Yesterday I got an email from RR announcing a no-cost increase in
download speed from 5Mbps to 7Mbps.

It said nothing about schedule, but on trying it (after cable disconnect
and power cycle, per email instructions), I still get the same old
4.8Mbps (via speedtest or speakeasy).

Called RR, and the tech was able to verify the current 5Mbps D/L rate
via remote diagnostics.

==> He says the email _should have_ said something like 'by July 30'.

.. So if anyone else is wondering what's up, I guess we should wait
'till the end of the month before griping.

Regards,
..jim


-- 
[email protected]
http://www.kernel-panic.org/cgi-bin/mailman/listinfo/kplug-list

Reply via email to