On Jul 16, 2014, at 10:19 PM, "ambi ka" <[email protected]<mailto:[email protected]>> wrote:
Sir, For the question asked by simone coche, i found some answer from the forum. From that i understand that PV generator can be added as a PQ bus with negative load. Is it correct or not? You can do it either way. It will not change the solution algorithm. I like the way I suggested because the power flow output will have all the generators together in the gen struct. Also for my research i want to have data for the indian system (MV radial network) Where can i get the data? can any one help me? MATPOWER is not the correct forum to ask "where can I get data for xyz system". Please refrain from asking such questions in the future. Shri On Thursday, 17 July 2014 12:28 AM, "Abhyankar, Shrirang G." <[email protected]<mailto:[email protected]>> wrote: Simone, Add your generator in the gen data struct in the case file and set its bus type to PQ. Shri On Jul 16, 2014, at 8:31 AM, "Simone Cochi" <[email protected]<mailto:[email protected]>> wrote: Dear all, I’m completely new to the power systems simulation. I want to simulate the effect of photovoltaic generator on a MV radial network and in particular the rise of voltage profile that this generators involve. If I insert the photovoltaic generators as PV nodes, the voltage at this busses will be fixed so I can’t see the effect on voltage and I thought that I could insert them as PQ node with negative load. Do you think that this is feasible? Thanks -- Simone Sent with Airmail
