Good point, maybe we should trow a Pgen constraint on the swing buses in
the Jacobian.



On Wed, Feb 17, 2016 at 5:30 PM, Santiago Torres <[email protected]>
wrote:

> Because the exceding generation is supplied by the swing bus. Normal power
> flow does not check power generation limits.
> El 17 feb. 2016 1:58 PM, "Bai, Wenlei" <[email protected]> escribió:
>
>> Dear Ray,
>>
>> I tried to modified load of ‘case9’ to exceed the total generation
>> capacity purposely.
>>
>> To my surprise, power flow still converges.  More specifically,  the
>> total generator ‘on-line capacity’ is 820MW, while the ‘actual generation’
>> is 920.8MW
>>
>> Why the actual generation can be larger than its capacity?
>>
>>
>>
>> Blessings,
>> Wenlei
>>
>>
>>
>

Reply via email to