Good point, maybe we should trow a Pgen constraint on the swing buses in the Jacobian.
On Wed, Feb 17, 2016 at 5:30 PM, Santiago Torres <[email protected]> wrote: > Because the exceding generation is supplied by the swing bus. Normal power > flow does not check power generation limits. > El 17 feb. 2016 1:58 PM, "Bai, Wenlei" <[email protected]> escribió: > >> Dear Ray, >> >> I tried to modified load of ‘case9’ to exceed the total generation >> capacity purposely. >> >> To my surprise, power flow still converges. More specifically, the >> total generator ‘on-line capacity’ is 820MW, while the ‘actual generation’ >> is 920.8MW >> >> Why the actual generation can be larger than its capacity? >> >> >> >> Blessings, >> Wenlei >> >> >> >