Hi guys,

with a possibility to append a context to multiple tasks, I have just
set up MLO for AF system while keeping the original hierarchy of my
tasks. Here is how I did it:

1) Suppose you want to set up the AF system for your @Work context.
Create a view named "autofo...@work Last Page" that shows active tasks
for @Work OR (none) contexts. The To-Do list should contain now all
the tasks you would want to write down in the AF notebook. Check "Add
advanced" button and Add rule "ContextsText does not contain "!Page".
Save the view.

2) Adjust the height of the MLO so it shows approximately 25-35 items

3) Press F8 and create a new context named "!Page 1". Got to its
properties tab and assign a hotkey for it, e.g. Ctrl+Alt+P. Exit the
Contexts setup

4) Select a screenfull of tasks and press you Ctrl+Alt+P. You have
just filled in the first page of the AF notebook.

5) Press F8 again, remove the hotkey from he context "!Page 1", create
a new context, name it "!Page 2" and assign the same hotkey for it.

6) repeat steps 4 and 5, creating contexts "!Page 2", "!Page 3", etc,
until you have less then a screenfull of tasks left. This is the last
page of your AF notebook.

7) Create a new TO-Do list view, name it autofo...@work that shows
active tasks for contexts !Page 1 OR !Page 2 and so on. Set Group
items by Contexts and save the view. The whole system is ready to use.
Just use it as described by Mark Forster, and when the last page is
full, create a new context and fill up the new page. All new created
tasks will automatically appear in the last page view, and if you have
not finished with a task, hit Ctrl+D to duplicate it, check one as
done and remove "!Page n" context from the other.

I hope somebody else can use my approach and to benefit from a very
interesting and effective time-management system.

Kind regards
olejorik

On Jan 8, 11:49 am, LondonTrader <[email protected]> wrote:
> I'm also trying MLO for AF. I'm wondering why bother with the to-do
> view and contexts at all, when one can just zoom in on the page branch
> in the outline? Also I am not numbering the items, when I need a new
> page I just import a file with 25 items containing a period "." which
> I click on to add. Of course this is imperfect when one copies over an
> incomplete item from an earlier page!
>
> I am also using Mobiler to run the PPC version of MLO in a window, as
> the PPC version allows yellow highlighting (I have set projects to
> appear thus). This enables me to have the windows and PPC copies of
> the file open simultaneously, with one showing the latest page and the
> other showing the current page.
>
> Is all this better than paper? Probably, but it's a moot point.
>
> L
>
> PS Is there is a way to background highlight in the latest Windows
> version? I know I can do bold, italic, foreground, etc
--~--~---------~--~----~------------~-------~--~----~
You received this message because you are subscribed to the Google Groups 
"MyLifeOrganized" group.
To post to this group, send email to [email protected]
To unsubscribe from this group, send email to 
[email protected]
For more options, visit this group at 
http://groups.google.com/group/myLifeOrganized?hl=en
-~----------~----~----~----~------~----~------~--~---

Reply via email to