perhaps i'm not explaining it correctly.  i'd love to figure this out but
i'm not the sharpest tool in the shed so bear with me


ok we agree the parent or final step whatever could be "finish painting the
truck"

and i want to use strict gtd principles so my tasks do not appear on my to
do list until the first task is done

that would be the top of the tree

now i sit back and say ok what do i need to do first

first decide color so i type that

so my tree looks like this when i get done entering tasks
decide color....
     then order supplies
         then sand truck
             then repair low spots
                    then apply primer
                           then resand
except...........

the first step is on top not the bottom

so i either need to type it out this way and then using the mouse or arrows
or whatever mover the tasks around
or i need to really slow down my thought process and think and type in
reverse order which for me is much much slower and more frustrating to try
to plan that way

the tree SHOULD look like this but i cannot THINK that way.

the FIRST task i think of is actually the bottom most part of the tree but
they do not get ENTERED that way...or like i said i can but then i have to
"move" them to the correct order when i had already typed them in the
correct order. hope it's clearer but probably not

repaint truck
     apply final coat
       resand
          apply primer
             repair low spots
                sand truck
                  order supplies
                    decide color




On Thu, Sep 29, 2011 at 8:58 AM, Lisa Stroyan <[email protected]> wrote:

> I would just put the parent as, "finish truck painting project".
>
> Why would you need to reverse the test of the tree?
>
> Apply Paint to truck would be your last step, that is, until you completed
> it, and saw the incomplete parent "finish truck painting project" and
> realized, ack, I actually have to clean up the garage before this is done or
> my wife will kill me..:)
>
> that is the value of describing the entire objective with the parent, and
> is also why parent doesn't get auto completed.
>
> Lisa from mobile
> On Sep 29, 2011 5:58 AM, "daniel sekera" <[email protected]> wrote:
> > I know this is very similar to what i struggle with the most and I'm
> > stumped as to how to fix it. so i cannot come up with a good suggestion.
> > my situation would need want you want to happen as well to be the
> ultimate.
> >
> > my brain wraps around tasks to do differently i guess. i beleive so much
> in
> > the GTD next action thing but thats not how i think.
> >
> > an example: if the end result is i want a red truck the parent or project
> > is paint the truck red
> >
> > now my brain starts rattling off tasks in order
> >
> > wash the truck
> > sand the old paint
> > repair damaged areas
> > put on primer coat
> > sand primer coat
> > remove dust
> > etc to finally the main task or parent which is
> > paint the truck red
> >
> > my brain thinks in order of 1st to last
> >
> > however now to enter that in my to do list i need to flip everything. i
> > know i can input the tasks just the way i did and then drag them or move
> > them to the correct order but why should i have to
> >
> > maybe all these years later i'm missing a simple setup or check box or
> > something that will allow me to "reverse" my trees
> >
> > so yes inheriting things child to parent would work very well for me
> >
> > i want my dependency tree to go the other direction so i can add as i
> think
> >
> > On Thu, Sep 29, 2011 at 2:01 AM, gadgetgeek2 <[email protected]>
> wrote:
> >
> >> By searching through the group archive I found a couple of suggestions
> >> for the functionality that I'm looking for, which is to have the dates
> >> set in child tasks "roll up" to become the start/due dates of the
> >> parent project. Kind of the opposite of "Inherit parent dates."
> >> However, I didn't see any discussion around those posts. Is the
> >> capability already in MLO and I just haven't found it? Or is it a
> >> feature that only a few other people would find useful?
> >>
> >> Perhaps I'm going about my planning wrong and there's a better way to
> >> do it. Suggestions, anyone? To me it often makes more sense to add up
> >> the parts and see what the total is going to be rather than decide
> >> what the total should be and try to make the parts fit. Sometimes you
> >> have to do it that way, but I think it's better if you can make the
> >> schedule fit reality rather than the other way around. :-)
> >>
> >> I'm new to posting here. If I should just go to uservoice and add this
> >> as a feature request, please let me know.
> >>
> >> -Steve
> >>
> >> --
> >> You received this message because you are subscribed to the Google
> Groups
> >> "MyLifeOrganized" group.
> >> To post to this group, send email to [email protected].
> >> To unsubscribe from this group, send email to
> >> [email protected].
> >> For more options, visit this group at
> >> http://groups.google.com/group/mylifeorganized?hl=en.
> >>
> >>
> >
> > --
> > You received this message because you are subscribed to the Google Groups
> "MyLifeOrganized" group.
> > To post to this group, send email to [email protected].
> > To unsubscribe from this group, send email to
> [email protected].
> > For more options, visit this group at
> http://groups.google.com/group/mylifeorganized?hl=en.
> >
>
> --
> You received this message because you are subscribed to the Google Groups
> "MyLifeOrganized" group.
> To post to this group, send email to [email protected].
> To unsubscribe from this group, send email to
> [email protected].
> For more options, visit this group at
> http://groups.google.com/group/mylifeorganized?hl=en.
>

-- 
You received this message because you are subscribed to the Google Groups 
"MyLifeOrganized" group.
To post to this group, send email to [email protected].
To unsubscribe from this group, send email to 
[email protected].
For more options, visit this group at 
http://groups.google.com/group/mylifeorganized?hl=en.

Reply via email to