thank you between you and lisa you have ended my confusion....it was all
about the view.....i've had it correct many times in the past and did not
realize the view was what was screwing me up  i never noticed my view was
all actions instead of active actions by context

one i did that..along with the complete in order..perfect!



On Thu, Sep 29, 2011 at 11:45 AM, Mike McCallister <
[email protected]> wrote:

>  Daniel,****
>
> ** **
>
> This problem has a simple solution. When I was starting out with MLO, I had
> the same issue; I don’t remember what it was I was doing, but I suspect it’s
> the same thing you do now. Instead, do this:****
>
> ** **
>
> Project name goes on top. “Finish painting the truck.”****
>
> Go to Properties tab and mark this a Project, and check “complete subtasks
> in order.”****
>
> Press Alt+Insert (or go to Task > New Subtask)****
>
> Type “Decide color.”****
>
> Press Insert (or go to Task > New Task). The new task should appear right
> below.****
>
> Type “Order supplies.” ****
>
> Repeat until the end.****
>
> ** **
>
> No backwards order!****
>
> ** **
>
> Hope this helps.****
>
> ** **
>
> Mike M****
>
> ** **
>
> *From:* [email protected] [mailto:
> [email protected]] *On Behalf Of *daniel sekera
> *Sent:* Thursday, September 29, 2011 10:14 AM
> *To:* [email protected]
> *Subject:* Re: [MLO] Child task dates roll up to project?****
>
> ** **
>
> perhaps i'm not explaining it correctly.  i'd love to figure this out but
> i'm not the sharpest tool in the shed so bear with me****
>
> ** **
>
> ** **
>
> ok we agree the parent or final step whatever could be "finish painting the
> truck"****
>
> ** **
>
> and i want to use strict gtd principles so my tasks do not appear on my to
> do list until the first task is done****
>
> ** **
>
> that would be the top of the tree****
>
> ** **
>
> now i sit back and say ok what do i need to do first****
>
> ** **
>
> first decide color so i type that****
>
> ** **
>
> so my tree looks like this when i get done entering tasks ****
>
> decide color....****
>
>      then order supplies****
>
>          then sand truck****
>
>              then repair low spots****
>
>                     then apply primer****
>
>                            then resand****
>
> except...........****
>
> ** **
>
> the first step is on top not the bottom****
>
> ** **
>
> so i either need to type it out this way and then using the mouse or arrows
> or whatever mover the tasks around ****
>
> or i need to really slow down my thought process and think and type in
> reverse order which for me is much much slower and more frustrating to try
> to plan that way****
>
> ** **
>
> the tree SHOULD look like this but i cannot THINK that way.****
>
> ** **
>
> the FIRST task i think of is actually the bottom most part of the tree but
> they do not get ENTERED that way...or like i said i can but then i have to
> "move" them to the correct order when i had already typed them in the
> correct order. hope it's clearer but probably not****
>
> ** **
>
> repaint truck****
>
>      apply final coat****
>
>        resand****
>
>           apply primer****
>
>              repair low spots****
>
>                 sand truck****
>
>                   order supplies****
>
>                     decide color****
>
> ** **
>
> ** **
>
> ** **
>
> On Thu, Sep 29, 2011 at 8:58 AM, Lisa Stroyan <[email protected]> wrote:*
> ***
>
> I would just put the parent as, "finish truck painting project". ****
>
> Why would you need to reverse the test of the tree? ****
>
> Apply Paint to truck would be your last step, that is, until you completed
> it, and saw the incomplete parent "finish truck painting project" and
> realized, ack, I actually have to clean up the garage before this is done or
> my wife will kill me..:) ****
>
> that is the value of describing the entire objective with the parent, and
> is also why parent doesn't get auto completed.****
>
> Lisa from mobile****
>
> On Sep 29, 2011 5:58 AM, "daniel sekera" <[email protected]> wrote:
> > I know this is very similar to what i struggle with the most and I'm
> > stumped as to how to fix it. so i cannot come up with a good suggestion.
> > my situation would need want you want to happen as well to be the
> ultimate.
> >
> > my brain wraps around tasks to do differently i guess. i beleive so much
> in
> > the GTD next action thing but thats not how i think.
> >
> > an example: if the end result is i want a red truck the parent or project
> > is paint the truck red
> >
> > now my brain starts rattling off tasks in order
> >
> > wash the truck
> > sand the old paint
> > repair damaged areas
> > put on primer coat
> > sand primer coat
> > remove dust
> > etc to finally the main task or parent which is
> > paint the truck red
> >
> > my brain thinks in order of 1st to last
> >
> > however now to enter that in my to do list i need to flip everything. i
> > know i can input the tasks just the way i did and then drag them or move
> > them to the correct order but why should i have to
> >
> > maybe all these years later i'm missing a simple setup or check box or
> > something that will allow me to "reverse" my trees
> >
> > so yes inheriting things child to parent would work very well for me
> >
> > i want my dependency tree to go the other direction so i can add as i
> think
> >
> > On Thu, Sep 29, 2011 at 2:01 AM, gadgetgeek2 <[email protected]>
> wrote:
> >
> >> By searching through the group archive I found a couple of suggestions
> >> for the functionality that I'm looking for, which is to have the dates
> >> set in child tasks "roll up" to become the start/due dates of the
> >> parent project. Kind of the opposite of "Inherit parent dates."
> >> However, I didn't see any discussion around those posts. Is the
> >> capability already in MLO and I just haven't found it? Or is it a
> >> feature that only a few other people would find useful?
> >>
> >> Perhaps I'm going about my planning wrong and there's a better way to
> >> do it. Suggestions, anyone? To me it often makes more sense to add up
> >> the parts and see what the total is going to be rather than decide
> >> what the total should be and try to make the parts fit. Sometimes you
> >> have to do it that way, but I think it's better if you can make the
> >> schedule fit reality rather than the other way around. :-)
> >>
> >> I'm new to posting here. If I should just go to uservoice and add this
> >> as a feature request, please let me know.
> >>
> >> -Steve
> >>
> >> --
> >> You received this message because you are subscribed to the Google
> Groups
> >> "MyLifeOrganized" group.
> >> To post to this group, send email to [email protected].
> >> To unsubscribe from this group, send email to
> >> [email protected].
> >> For more options, visit this group at
> >> http://groups.google.com/group/mylifeorganized?hl=en.
> >>
> >>
> >
> > --
> > You received this message because you are subscribed to the Google Groups
> "MyLifeOrganized" group.
> > To post to this group, send email to [email protected].
> > To unsubscribe from this group, send email to
> [email protected].
> > For more options, visit this group at
> http://groups.google.com/group/mylifeorganized?hl=en.
> > ****
>
> --
> You received this message because you are subscribed to the Google Groups
> "MyLifeOrganized" group.
> To post to this group, send email to [email protected].
> To unsubscribe from this group, send email to
> [email protected].
> For more options, visit this group at
> http://groups.google.com/group/mylifeorganized?hl=en.****
>
> ** **
>
> --
> You received this message because you are subscribed to the Google Groups
> "MyLifeOrganized" group.
> To post to this group, send email to [email protected].
> To unsubscribe from this group, send email to
> [email protected].
> For more options, visit this group at
> http://groups.google.com/group/mylifeorganized?hl=en.****
>
> --
> You received this message because you are subscribed to the Google Groups
> "MyLifeOrganized" group.
> To post to this group, send email to [email protected].
> To unsubscribe from this group, send email to
> [email protected].
> For more options, visit this group at
> http://groups.google.com/group/mylifeorganized?hl=en.
>

-- 
You received this message because you are subscribed to the Google Groups 
"MyLifeOrganized" group.
To post to this group, send email to [email protected].
To unsubscribe from this group, send email to 
[email protected].
For more options, visit this group at 
http://groups.google.com/group/mylifeorganized?hl=en.

Reply via email to