If we have
> ImplicationScopeLink
> VariableNode x
> P(x)
> Q(x)
then e.g. PLN can assign this a truth value equal to
Sum_x ( max( P(x), Q(x)) ) / Sum_x P(x)
or
Sum_x ( P(x) * Q(x) ) / Sum_x P(x)
but may assign a quite different truth value for
ForAllLink
VariableNode x
ImplicationLink
P(x)
Q(x)
PLN does assign these two constructs different uncertain truth values,
so this is not just a theoretical difference...
Other uncertain logic frameworks may also assign the two constructs
different TVs, I would think...
ben
--
Ben Goertzel, PhD
http://goertzel.org
“I tell my students, when you go to these meetings, see what direction
everyone is headed, so you can go in the opposite direction. Don’t
polish the brass on the bandwagon.” – V. S. Ramachandran
--
You received this message because you are subscribed to the Google Groups
"opencog" group.
To unsubscribe from this group and stop receiving emails from it, send an email
to [email protected].
To post to this group, send email to [email protected].
Visit this group at https://groups.google.com/group/opencog.
To view this discussion on the web visit
https://groups.google.com/d/msgid/opencog/CACYTDBdtK5m7DKJQ8gdE8YV9GPx9nzyTR2PK%3DF8s%3DHZsK7UTTA%40mail.gmail.com.
For more options, visit https://groups.google.com/d/optout.