ONE slight correction the hang up is NOT GPH, but rather at the National Office, which I can't figure out.  I agree they are great guys, as I know two of them personally and know their heart is in the ministry.
 
We went back to train on the new modules & between the other instructor that went with me, we are able to teach 5 of the 15, right here in our section.  BUT with no PowerPoint, that is a little hard to do.
 
Getting up on my soap box, they should have had the instructors get the materials in early enough to get things out in our hands in March.  I know at least one of the classes I took the written materials were only finished on Monday & the PowerPoint was still being worked over on Thursday.
 
I STILL say this should have been farmed out to a outside vendor if they couldn't handle the load.  It is often as cheap to do so than to do it in house and a whole lot faster.
 
Jim Hufferd

Reply via email to