Very interesting. My compliments to all those who fought hard to expose 
corruption in BBMP .  Definitely a RTI success story .


Arun Agrawal




________________________________
From: Anil kumar <[email protected]>
To: PRAJA-VOL <[email protected]>; "[email protected]" 
<[email protected]>; RTI4EMPOWERMENT <[email protected]>; 
rti4ngo <[email protected]>
Cc: antibriberycampaign <[email protected]>
Sent: Thursday, 6 August, 2009 11:04:36
Subject: [rti_india] MEETING CONVENED BY LOKAYUKTA

  
Dear All,      
 
Mr. Venkataram, President of Supraja Federation & member of  KRIA KATTE had 
obtained under RTI all the records relating to asphalting of Rama Iyengar Road 
(in Visveswarapuram ward 50 of BBMP) during the year 2005-06 and again in the 
year 2006-07 and found that the 2005-06 the designated work was not carried out 
on that particular road but used elsewhere by BBMP and in records of BBMP had 
mentioned as Rama Iyengar Road.  He had filed complaint to Lokayukta and the 
case was investigated and Lokayukta had instructed the BBMP to initaiate action 
against the concerned officials at the end of last year.
 
In November 2008 Mr. Venkataram had requested the BBMP Commissioner for an 
appointment to discuss some of the irregularties happening in the yearly 
Programme of Works(POW) and suggestion to improve the system in a transparent 
way, but the then  BBMP commissioner ignored his request.  
 
Since there was no response even after six months from the Commissioner 
BBMP for personal discussion to re-design the existing system which has been 
breeding large scale corruption in Roads, Foot Paths and Drain Works, we 
approached Lokayukta Justice N.Santosh Hegde with the attached file seeking his 
help. After glancing through our papers, he immediately assured us that he 
would call the commissioner to his office for our meeting shortly. The meeting 
took place on 5th August 2009 in the chambers of Lokayukta which was very 
cordial and meaningful. The Commissioner agreed with our suggestions besides 
conceding to, post details of all the works carried out in each ward on the 
website. What is more, the Commissioner has agreed to develop one ward in each 
zone as a Model Ward.
 
The following members were present in the meeting chaired by Justice N.Santosh 
Hegde:    
Representing BBMP- The Commissioner, Sri Bharatlal Meena, Additional 
Commissioners( South) Sri Ramakrishna and Sri Ekkeri, Chief Engineer Sri 
Srikante Gowda and  others.
From  our side, Sri S.R.Venkataram, Sri Ravindranath Guru,  Sri Ashwathnarayan, 
Sri V.R.Sheshu, and self.  The text of the suggestions are given 
under                             
             SUPRAJAA
  Federation of Associations of Visveswarapuram Ward No. 50.Residents Welfare 
Association of B.P.Wadia Road,  Womens Wing of Crescent Association of 
Mohammaden Block,  V.V.Puram Residents Welfare Association, Residents 
Association of Ramaiyengar Road,  M.M.V.Road Residents Welfare Association and  
Lalbagh West Residents Association. 301, Brigade Parkview, B.P.Wadia Road, 
Basavanagudi, Bangalore – 560 004. Phone: 26506261,  9341240751   E-mail 
srvenkatram@ yahoo.com
 
                                                                                
                              
            BRUHAT BENGALURU MAHANAGARA PALIKE. 
                 ROADS, FOOTPATHS AND DRAIN WORKS. 
  
  
The present system of recording and billing by BBMP of the above stated works 
which is in practice for decades, is far from satisfactory and has many 
loopholes leading to large scale corruption. This needs immediate attention. 
All loopholes should be plugged in, and complete transparent system should be 
introduced in public interest. With this in view Suprajaa studied in detail a 
few sample cases of Roads, Foot paths and Drain works executed by BBMP in the 
recent past and found that: 
  
 A contractor was paid Rs. 3,60,650 for a road that was not asphalted. On our 
complaint, Lokayukta passed strictures and directed BBMP to take action against 
the culprits as per rules. 
 
In another case of Drain Works, an amount of Rs. 16.48 lakhs was paid to a 
contractor where as the actual work done in accordance with the sanctioned 
estimate was only Rs. 6.55 lakhs. There were no documents to support the 
alleged work done to the extent of Rs.9.93 lakhs. This case is under 
investigation by Lokayukta. 
  
It is high time that BBMP redesigns the existing system that has been breeding 
large scale corruption.  
  
                Existing System
  
1.     History sheets of roads, footpaths and drains of Bangalore which are 
basic requirements DO NOT exist. Without Road Register, it is not possible to 
identify the works carried out and also the dates and details of works 
executed. 
  
2.  Detailed dimensional sketches are not prepared for individual works. Works 
are being carried out with JURISDICTION MAP of the Ward with no dimensions.  
 Even the names of roads are not legible.                     Annexures 1A & 
1B. 
  
3.     The present system of placing orders(Schedule – B) on contractors are 
very vague. It is a mere consolidated “quantity-cum” rate order instead of 
being the replica of the detailed sanctioned  estimates.                  
Annexure – 2. 
  
4.     Measurement Book records, which are the only source for payment of 
bills, is  anything but satisfactory. It is a BUNDLE of ILLEGIBLE SCRIBBLED 
SHEETS which can not be verified along with Technically and Administratively 
sanctioned  estimates.                                Annexures – 3A & 3B. 
  
5.     Duplicate orders exist, one as “Spillover” order and the other as “POW” 
order.  Apparently no audit system exists.    
                                                       
6.  Payments are being made on duplicate orders.    
Where is the audit  system?           Refer Annexure 5.   
  
7. Administrative Approval and Technical Sanctions by the designated  
Authorities remain only on paper since payments are made solely based on MB 
records.                                     Annexure – 6A & 6B. 
  
8.     While replacing covering slabs of Drains with new slabs, old slabs have 
never been accounted.Where have those slabs been disposed off ? Are those old 
slabs not salvaged? If salvaged, where are the details? The cost runs to lakhs 
and lakhs.     Annexure –7. 
                                                                                                        
 
  
  
                         SUGGESTIONS. 
  
1.     Maintain Road Register.  It shall contain Length and width of each  
road, footpaths and drains. Details of each and every work done on that road 
should be registered, like Work order reference, estimated cost, date of 
commencement of work, date of completion, actual cost incurred, name of 
contractor etc.  
  
2.     Prepare detailed sketches of each sanctioned work.  
  
3.     Issue detailed work order to the contractor(Schedule –B) identical to 
the Technically & Administratively sanctioned estimates along with dimensional 
sketches. 
  
     4.  Execute works strictly in accordance with the Technically & 
Administratively sanctioned estimates and work orders. Additional works if any 
which are not included in the original sanctioned estimates must have separate 
Technical &  Administrative  sanctions with dimensional sketches and a new work 
order. 
  
5        Discontinue the present system of MB recordings. All recordings shall 
be in the same manner as the item-wise sanctioned estimates, clearly mentioning 
the actual quantity of work done against each item. 
  
6.  Duplicate orders and double payments can thus be avoided by following 
our suggestions of itemes 1 to 5. 
  
7.     Classify roads based on scientific and technical parameters and divide 
into arterial roads, sub-arterial roads, residential roads, lanes etc., and 
arrive at a suitable asphalting specification to each category of road and 
avoid wasteful practices. At present no such classifications exist. 
  
8.     Drain Works: While replacing old covering slabs, old slabs must be 
accounted for, mentioning the quantity replaced in the road register stated in 
item 1 above. 
     
9.     The site supervisor should always carry a copy of the work order with 
details of the work that he executes at site, and the same should be made 
available for information to any citizen who evinces interest in knowing about 
the work. 
  
 S.R.Venkataram 