Good to see you're still making progress on the Shabbona!

That yard makes my 12th St. industrial yard look tiny.  Of course, my layout is 
tiny.  Of such is life.

Thought for the day: boB spelled backwards is Bob.  

Andre Ming



  ----- Original Message ----- 
  From: shabbona_rr 
  To: [email protected] 
  Sent: Monday, May 28, 2012 8:47 AM
  Subject: {S-Scale List} Re: Progress, continued.


  I have just uploaded a series of photos illustrating the changes I made to 
the West end of Terminal District, starting with:

  
http://groups.yahoo.com/group/S-Scale/photos/album/1775582643/pic/1322270818/view?picmode=large&mode=tn&order=ordinal&start=1&dir=asc

  The ground throw for the spring switch is an old Aristo-Craft unit that is no 
doubt older (c. 1961) than Bill Lane, and maybe a few others on the list. I 
painted the "Normal" position white with a black "S" to indicate the switch is 
a spring switch and in normal run-through position, while the red indicates it 
is reversed for an unsprung diverging move.

  More to do, but for now, it works.

  boB Nicholson  ________________________________________


  --- In [email protected], "shabbona_rr" <user141771@...> wrote:
  >
  > I'm happy to report that North 1 is now in service as a receiving track for 
inbound freight trains. Tests revealed that the spring switch works as 
intended, as does the manual override. Pretty neat, to watch a locomotive pass 
through the sprung switch points from the diverging route, then reverse 
direction and proceed up the straight route without throwing the switch.
  > 
  > Next will be a common ground feeder to the North Main, due to the length of 
the unbroken common ground rail through North 1.
  > 
  > Also, the remote ground throw mechanisms for the previously mentioned Back 
Lead and West end Pass switches that diverge from the West end of the North 
Main are still in the works. I'm not sure how soon I'll get those installed. 
I've got some other things to do before I go back to Iowa City on the 30th to 
ascertain that I qualify for the bone butcher. 
  > 
  > After that, at any time, I expect my life to take a [temporary, I hope] 
drastic turn for a few months that may put a serious damper on model railroad 
activity, or anything else, for that matter.
  > 
  > boB Nicholson  _______________________________________________
  > 
  > 
  > --- In [email protected], "shabbona_rr" <user141771@> wrote:
  > >
  > > The spring switch from the West end of North 1 to the North Main is now 
installed and operational. The point spring mechanism and the manual override 
(to manually line the switch for reverse moves through the diverging route) 
work as intended. The only thing left to do is re-install about six feet of 
North 1 and make the proper (this time!) electrical connections.
  > > 
  > > 
  > > boB Nicholson   _____________________________________________________
  > >
  >




  ------------------------------------

  Yahoo! Groups Links



Reply via email to