Certification type documentation such as Declarations of Conformity can be
in any EU language. User documentation relating to safe use of the product
MUST be in the language(s) of the country in which the product is being
sold, although if the product has separate installation or maintainance
Tania,
I've interpreted the EMC statement in the Annex of ICES-003 as suggested
text only.
EMCAB-3 (Issue 3 May 1998) Implementation and Interpretation of the
Interference-Causing Equipment Standard for Digital Apparatus, ICES-003,
QA #10, says that the ICES-003 regulation is met with
Hello George:
If you fail the high pot test. You should refer to your transformer
manufacturer to see if they are IEC950/EN60950 compliant or not. For
instance IEC 950 calls for Australian high pot test of 2.5 KV if you have
1.5 KV transformer, then your are more likely susceptible to failure.
In a message dated 7/1/99, George Sparacino writes:
I have a modem product that failed the hipot requirement defined in
cls 6 of 950. My understanding is that an isolation xfmr between Telco
SELV is needed and clearance from Telco gnd is to be 3mm minimum. Does
anyone have any other
Bill,
What you have said does not actually contradict my own statement (and maybe
that wasn't your intention!).
One must not confuse the requirement to draw the instructions up in one of
the languages of the EU with that of then translating the instructions into
the other languages for each
Hello Once Again .. Everyone,
I have a modem product that failed the hipot requirement defined in
cls 6 of 950. My understanding is that an isolation xfmr between Telco
SELV is needed and clearance from Telco gnd is to be 3mm minimum. Does
anyone have any other general design
George,
Do you have transient voltage surge supressors. Maybe this is why
you failed the hipot. The standard allows you to pass the Impulse
Test in lieu of hipot. Try this method.
Regarding insulation between TNV-3 and SELV/Earth the standard
allows you the following alternatives routes to
In the U.S., 19 and 23 racks are pretty much the standard (and don't
forget the Bellcore hole spacing), yes?
How about in Europe? I've heard they use 19 and 21 racks (or their
metric equivalent). Is one size typical for data applications, and the
other typical to telecom applications? How
Having seen numerous postings relating to job openings in EMC, I trust the
following is not out of line:
Electronic Design Engineer Position
Senior electrical/electronic engineer with analog design background to work
on design of KeyTek's pulsed-EMI (surge, EFT) and ESD test systems. The
9 matches
Mail list logo