Re: [AFMUG] gig power injectors

2017-08-27 Thread Kurt Fankhauser
kyneticwifi.com> > *To:* af@afmug.com > *Sent:* Sunday, August 27, 2017 5:34 PM > *Subject:* Re: [AFMUG] gig power injectors > > They are gig. Change the patch. > > On Aug 27, 2017 5:14 PM, "CBB - Jay Fuller" <par...@cyberbroadband.net> > wrote: > >&

Re: [AFMUG] gig power injectors

2017-08-27 Thread CBB - Jay Fuller
will do :) - Original Message - From: Josh Reynolds To: af@afmug.com Sent: Sunday, August 27, 2017 5:34 PM Subject: Re: [AFMUG] gig power injectors They are gig. Change the patch. On Aug 27, 2017 5:14 PM, "CBB - Jay Fuller" <par...@cyberbroadba

Re: [AFMUG] gig power injectors

2017-08-27 Thread Josh Reynolds
gt; *To:* af@afmug.com > *Sent:* Sunday, August 27, 2017 4:59 PM > *Subject:* Re: [AFMUG] gig power injectors > > Keep the loop length in mind when using a patch cable. If it's 200 feet > from the cabinet to the AP and 150 feet from the cabinet to the AF24, then > total loop leng

Re: [AFMUG] gig power injectors

2017-08-27 Thread CBB - Jay Fuller
with only 4 wires in it... - Original Message - From: George Skorup To: af@afmug.com Sent: Sunday, August 27, 2017 4:59 PM Subject: Re: [AFMUG] gig power injectors Keep the loop length in mind when using a patch cable. If it's 200 feet from the cabinet to the AP and 150

Re: [AFMUG] gig power injectors

2017-08-27 Thread George Skorup
Keep the loop length in mind when using a patch cable. If it's 200 feet from the cabinet to the AP and 150 feet from the cabinet to the AF24, then total loop length is 350 feet which is over the 100m spec. If length isn't an issue, are you using surge suppressors? Also, one pin missing on any