Re: [Framework-Team] PLIP Tallies

2009-01-31 Thread Andreas Zeidler
On Jan 30, 2009, at 8:47 PM, Tom Lazar wrote: FYI i have completed my two remaining reviews and have additionally reviewed #243 which was without a review. as a status update: i've completed all but one (247), but won't get around to do the last in time. i'm simply too tired to keep going.

Re: [Framework-Team] PLIP Tallies

2009-01-31 Thread Wichert Akkerman
On 1/31/09 2:18 PM, Tom Lazar wrote: i've updated my local buildout and the the site works fine now, i do get some 404 for the images in the timeline (http://localhost:8080/newsite/history_compare_with_current.png) etc, no showstopper, obviously, but if you can fix that still today i can give

Re: [Framework-Team] PLIP Tallies

2009-01-31 Thread Tom Lazar
On 30.01.2009, at 21:56, Wichert Akkerman wrote: Previously Tom Lazar wrote: FYI i have completed my two remaining reviews and have additionally reviewed #243 which was without a review. I've fixed the problems you saw with #243. i've updated my local buildout and the the site works fine no

Re: [Framework-Team] PLIP Tallies

2009-01-30 Thread Wichert Akkerman
Previously Tom Lazar wrote: > FYI i have completed my two remaining reviews and have additionally > reviewed #243 which was without a review. I've fixed the problems you saw with #243. Might I request that review comments are emailed to the PLIP author? Wichert. -- Wichert Akkerman It i

Re: [Framework-Team] PLIP Tallies

2009-01-30 Thread Martijn Pieters
On Fri, Jan 30, 2009 at 20:47, Tom Lazar wrote: > there are still outstanding reviews from raphael, witsch and mj (or have > they perhaps not updated the pliptallies page[1]?) and IMO #243 would also > warrant a UI review! Hopefully I'll have some time tomorrow to finish the RR enhancements revie

Re: [Framework-Team] PLIP Tallies

2009-01-30 Thread Tom Lazar
FYI i have completed my two remaining reviews and have additionally reviewed #243 which was without a review. there are still outstanding reviews from raphael, witsch and mj (or have they perhaps not updated the pliptallies page[1]?) and IMO #243 would also warrant a UI review! i have inc

Re: [Framework-Team] PLIP Tallies

2009-01-29 Thread Martijn Pieters
On Thu, Jan 29, 2009 at 10:49, Andreas Zeidler wrote: > i think it's time to assign those now, mostly so that nobody gets the > impression they're already done or almost... ;) with a total of 12 PLIPs we > get to review six each, so everybody needs to sign up for one more. i just > did so (for #

Re: [Framework-Team] PLIP Tallies

2009-01-29 Thread Andreas Zeidler
hi framework team, we're quickly approaching the deadline for the first round of reviews. most PLIPs have already seen at least one review, but in total we're still at only 11 out of 24 necessary bundle reviews. we're also still one UI review short. so let's push a little harder and tr

Re: [Framework-Team] PLIP Tallies

2009-01-27 Thread Andreas Zeidler
On Jan 27, 2009, at 1:35 PM, Danny Bloemendaal wrote: On 19 jan 2009, at 15:28, Tom Lazar wrote: @danny: could you mark which tickets you will review for UI impact? perhaps by making an X for those where you will and an explicit - for those which don't have any. Yes, I will. I'm already workin

Re: [Framework-Team] PLIP Tallies

2009-01-27 Thread Danny Bloemendaal
On 19 jan 2009, at 15:28, Tom Lazar wrote: thanks wichert for your reminder and andi and raphael for your quick replies. i've taken this thread as opportunity to summarize the plips and who (so far) has taken on which review. i've included andi's and raphael's and added mine. since danny won'

Re: [Framework-Team] PLIP Tallies

2009-01-19 Thread Tom Lazar
On 19.01.2009, at 16:36, Andreas Zeidler wrote: On Jan 19, 2009, at 3:58 PM, Martijn Pieters wrote: Only 2 plips do not yet have a second reviewer assigned: #237 "Minor i18n upgrades" #243 "Replace workflow history viewlet with content history viewlet" Shall we tackle these ad hoc or

Re: [Framework-Team] PLIP Tallies

2009-01-19 Thread Andreas Zeidler
On Jan 19, 2009, at 3:58 PM, Martijn Pieters wrote: Only 2 plips do not yet have a second reviewer assigned: #237"Minor i18n upgrades" #243 "Replace workflow history viewlet with content history viewlet" Shall we tackle these ad hoc or will someone take these? perhaps let's get goi

Re: [Framework-Team] PLIP Tallies

2009-01-19 Thread Martijn Pieters
On Mon, Jan 19, 2009 at 15:28, Tom Lazar wrote: > thanks wichert for your reminder and andi and raphael for your quick > replies. Indeed, thanks! > https://dev.plone.org/plone/wiki/PLIPTallies33 Great, Tom! I've added my name for: #197 "Add FeedParser as external requirement" #239 "Ada

Re: [Framework-Team] PLIP Tallies

2009-01-19 Thread Tom Lazar
thanks wichert for your reminder and andi and raphael for your quick replies. i've taken this thread as opportunity to summarize the plips and who (so far) has taken on which review. i've included andi's and raphael's and added mine. since danny won't be able to do technical evaluations a

Re: [Framework-Team] PLIP Tallies

2009-01-19 Thread Raphael Ritz
Andreas Zeidler wrote: [..] · #126: Link type should automatically redirect when accessed directly · #234: Standardizing our use of INavigationRoot · #239: Adapterise the Extensible Indexable Object Wrapper · #240: Improve locking configurability · #247: Automate ZCML Loading for

Re: [Framework-Team] PLIP Tallies

2009-01-19 Thread Andreas Zeidler
On Nov 6, 2008, at 9:44 AM, Andreas Zeidler wrote: On Oct 29, 2008, at 8:51 AM, Raphael Ritz wrote: Now on to the real work - the reviewing. How do we distribute that across the team? now that all PLIPs are submitted, i'd like to follow up on this once more... since we didn't talk about i

Re: [Framework-Team] PLIP Tallies

2008-11-06 Thread Andreas Zeidler
On Oct 29, 2008, at 8:51 AM, Raphael Ritz wrote: Now on to the real work - the reviewing. How do we distribute that across the team? since we didn't talk about it or made any changes, i'd say the same "rules" still apply: each PLIP should be reviewed in depth by at least two people. howe

Re: [Framework-Team] PLIP Tallies

2008-10-29 Thread Raphael Ritz
Steve McMahon wrote: Hi Raphael, Hi Steve, sorry for being late and once more a big thanks to you for taking this on. Here now my votes (note to others: they are not (all) on plone.org; even logging in timed out repeatedly for me - which is one of the reasons I'm late) Votes in parentheses ar

Re: [Framework-Team] PLIP Tallies

2008-10-28 Thread Andreas Zeidler
On Oct 28, 2008, at 1:38 PM, Tom Lazar wrote: i've posted the votes and their motivations at the plips, but not on the list. thanks tom! and the PLIP pages are fine — they are the canonical source of information, at least for 3.x with x <= 3. andi -- zeidler it consulting - http://zitc.

Re: [Framework-Team] PLIP Tallies

2008-10-28 Thread Andreas Zeidler
On Oct 28, 2008, at 11:39 AM, Raphael Ritz wrote: Andreas Zeidler wrote: On Oct 28, 2008, at 9:21 AM, Wichert Akkerman wrote: Previously Steve McMahon wrote: Here are my 3.3 PLIP tallies as of 5:45 2008-10-28 (UTC). These include some unambiguous votes pulled from e-mail messages to the FWT

Re: [Framework-Team] PLIP Tallies

2008-10-28 Thread Tom Lazar
steve, here's the tally of my remaining plips: 126 +1 228 +1 236 -1 238 +1 239 +1 240 +1 241 +1 242 -1 243 +1 244 -1 247 +1 i've posted the votes and their motivations at the plips, but not on the list. cheers, tom On 28.10.2008, at 11:21, Tom Lazar wrote: yes, sorry for holding things

Re: [Framework-Team] PLIP Tallies

2008-10-28 Thread Raphael Ritz
Andreas Zeidler wrote: On Oct 28, 2008, at 9:21 AM, Wichert Akkerman wrote: Previously Steve McMahon wrote: Here are my 3.3 PLIP tallies as of 5:45 2008-10-28 (UTC). These include some unambiguous votes pulled from e-mail messages to the FWT list. Can this be turned into a result? i'd say

Re: [Framework-Team] PLIP Tallies

2008-10-28 Thread Tom Lazar
yes, sorry for holding things up. i have seven plips to vote on and some office furniture to move, but i'm confident i'll get done within the next few hours while still making informed choices ;-) cheers, tom p.s. @steve: i'll send you a tally of my missing votes, so you should be able to

Re: [Framework-Team] PLIP Tallies

2008-10-28 Thread Andreas Zeidler
On Oct 28, 2008, at 9:21 AM, Wichert Akkerman wrote: Previously Steve McMahon wrote: Here are my 3.3 PLIP tallies as of 5:45 2008-10-28 (UTC). These include some unambiguous votes pulled from e-mail messages to the FWT list. Can this be turned into a result? i'd say not yet. i'm aware the

Re: [Framework-Team] PLIP Tallies

2008-10-28 Thread Andreas Zeidler
On Oct 28, 2008, at 4:40 AM, Steve McMahon wrote: Attached is the table with votes in PDF. thank you. * The votes on this were qualified based on implementation. just for the record, i think these can be turned into +1's after calvin's reply[*] andi [*] http://lists.plone.org/piperma

Re: [Framework-Team] PLIP Tallies

2008-10-28 Thread Wichert Akkerman
Previously Steve McMahon wrote: > Here are my 3.3 PLIP tallies as of 5:45 2008-10-28 (UTC). These include some > unambiguous votes pulled from e-mail messages to the FWT list. Can this be turned into a result? What I would like to have is a list of PLIPs, with for each plip the result (accept/rece