Re: [Wikimedia-l] Quarterly reviews of high priority WMF initiatives

2015-02-16 Thread Tilman Bayer
Quarterly review minutes and/or slides of the following teams have
been posted in recent days:

Multimedia:
https://meta.wikimedia.org/wiki/WMF_Metrics_and_activities_meetings/Quarterly_reviews/Multimedia/January_2015

Legal  Community Advocacy:
https://commons.wikimedia.org/wiki/File:LCA_Q2_Slides.pdf (abridged slides only)

Fundraising and Fundraising Tech:
https://meta.wikimedia.org/wiki/WMF_Metrics_and_activities_meetings/Quarterly_reviews/Fundraising/January_2015

Communications:
https://commons.wikimedia.org/wiki/File:Communications_WMF_Quarterly_Review,_Q2_2014-15.pdf
(slides only, as a report - no actual meeting took place)


With this, documentation from all 20 quarterly review meetings that
took place about Q2 (October-December 2014) has been published.


On Wed, Dec 19, 2012 at 6:49 PM, Erik Moeller e...@wikimedia.org wrote:
 Hi folks,

 to increase accountability and create more opportunities for course
 corrections and resourcing adjustments as necessary, Sue's asked me
 and Howie Fung to set up a quarterly project evaluation process,
 starting with our highest priority initiatives. These are, according
 to Sue's narrowing focus recommendations which were approved by the
 Board [1]:

 - Visual Editor
 - Mobile (mobile contributions + Wikipedia Zero)
 - Editor Engagement (also known as the E2 and E3 teams)
 - Funds Dissemination Committe and expanded grant-making capacity

 I'm proposing the following initial schedule:

 January:
 - Editor Engagement Experiments

 February:
 - Visual Editor
 - Mobile (Contribs + Zero)

 March:
 - Editor Engagement Features (Echo, Flow projects)
 - Funds Dissemination Committee

 We’ll try doing this on the same day or adjacent to the monthly
 metrics meetings [2], since the team(s) will give a presentation on
 their recent progress, which will help set some context that would
 otherwise need to be covered in the quarterly review itself. This will
 also create open opportunities for feedback and questions.

 My goal is to do this in a manner where even though the quarterly
 review meetings themselves are internal, the outcomes are captured as
 meeting minutes and shared publicly, which is why I'm starting this
 discussion on a public list as well. I've created a wiki page here
 which we can use to discuss the concept further:

 https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews

 The internal review will, at minimum, include:

 Sue Gardner
 myself
 Howie Fung
 Team members and relevant director(s)
 Designated minute-taker

 So for example, for Visual Editor, the review team would be the Visual
 Editor / Parsoid teams, Sue, me, Howie, Terry, and a minute-taker.

 I imagine the structure of the review roughly as follows, with a
 duration of about 2 1/2 hours divided into 25-30 minute blocks:

 - Brief team intro and recap of team's activities through the quarter,
 compared with goals
 - Drill into goals and targets: Did we achieve what we said we would?
 - Review of challenges, blockers and successes
 - Discussion of proposed changes (e.g. resourcing, targets) and other
 action items
 - Buffer time, debriefing

 Once again, the primary purpose of these reviews is to create improved
 structures for internal accountability, escalation points in cases
 where serious changes are necessary, and transparency to the world.

 In addition to these priority initiatives, my recommendation would be
 to conduct quarterly reviews for any activity that requires more than
 a set amount of resources (people/dollars). These additional reviews
 may however be conducted in a more lightweight manner and internally
 to the departments. We’re slowly getting into that habit in
 engineering.

 As we pilot this process, the format of the high priority reviews can
 help inform and support reviews across the organization.

 Feedback and questions are appreciated.

 All best,
 Erik

 [1] https://wikimediafoundation.org/wiki/Vote:Narrowing_Focus
 [2] https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings
 --
 Erik Möller
 VP of Engineering and Product Development, Wikimedia Foundation

 Support Free Knowledge: https://wikimediafoundation.org/wiki/Donate

 ___
 Wikimedia-l mailing list
 Wikimedia-l@lists.wikimedia.org
 Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l



-- 
Tilman Bayer
Senior Analyst
Wikimedia Foundation
IRC (Freenode): HaeB

___
Wikimedia-l mailing list, guidelines at: 
https://meta.wikimedia.org/wiki/Mailing_lists/Guidelines
Wikimedia-l@lists.wikimedia.org
Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l, 
mailto:wikimedia-l-requ...@lists.wikimedia.org?subject=unsubscribe

Re: [Wikimedia-l] Quarterly reviews of high priority WMF initiatives

2015-02-05 Thread Tilman Bayer
Minutes and slides from four recent meetings have appeared under the
following URLs:

Analytics team:
https://meta.wikimedia.org/wiki/WMF_Metrics_and_activities_meetings/Quarterly_reviews/Analytics/January_2015

Parsoid and Services teams:
https://meta.wikimedia.org/wiki/WMF_Metrics_and_activities_meetings/Quarterly_reviews/Services/January_2015

Mobile Web and Apps teams:
https://meta.wikimedia.org/wiki/WMF_Metrics_and_activities_meetings/Quarterly_reviews/Mobile/January_2015

Product Process Improvements (update meeting):
https://meta.wikimedia.org/wiki/WMF_Metrics_and_activities_meetings/Quarterly_reviews/Product/January_2015

On Wed, Dec 19, 2012 at 6:49 PM, Erik Moeller e...@wikimedia.org wrote:
 Hi folks,

 to increase accountability and create more opportunities for course
 corrections and resourcing adjustments as necessary, Sue's asked me
 and Howie Fung to set up a quarterly project evaluation process,
 starting with our highest priority initiatives. These are, according
 to Sue's narrowing focus recommendations which were approved by the
 Board [1]:

 - Visual Editor
 - Mobile (mobile contributions + Wikipedia Zero)
 - Editor Engagement (also known as the E2 and E3 teams)
 - Funds Dissemination Committe and expanded grant-making capacity

 I'm proposing the following initial schedule:

 January:
 - Editor Engagement Experiments

 February:
 - Visual Editor
 - Mobile (Contribs + Zero)

 March:
 - Editor Engagement Features (Echo, Flow projects)
 - Funds Dissemination Committee

 We’ll try doing this on the same day or adjacent to the monthly
 metrics meetings [2], since the team(s) will give a presentation on
 their recent progress, which will help set some context that would
 otherwise need to be covered in the quarterly review itself. This will
 also create open opportunities for feedback and questions.

 My goal is to do this in a manner where even though the quarterly
 review meetings themselves are internal, the outcomes are captured as
 meeting minutes and shared publicly, which is why I'm starting this
 discussion on a public list as well. I've created a wiki page here
 which we can use to discuss the concept further:

 https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews

 The internal review will, at minimum, include:

 Sue Gardner
 myself
 Howie Fung
 Team members and relevant director(s)
 Designated minute-taker

 So for example, for Visual Editor, the review team would be the Visual
 Editor / Parsoid teams, Sue, me, Howie, Terry, and a minute-taker.

 I imagine the structure of the review roughly as follows, with a
 duration of about 2 1/2 hours divided into 25-30 minute blocks:

 - Brief team intro and recap of team's activities through the quarter,
 compared with goals
 - Drill into goals and targets: Did we achieve what we said we would?
 - Review of challenges, blockers and successes
 - Discussion of proposed changes (e.g. resourcing, targets) and other
 action items
 - Buffer time, debriefing

 Once again, the primary purpose of these reviews is to create improved
 structures for internal accountability, escalation points in cases
 where serious changes are necessary, and transparency to the world.

 In addition to these priority initiatives, my recommendation would be
 to conduct quarterly reviews for any activity that requires more than
 a set amount of resources (people/dollars). These additional reviews
 may however be conducted in a more lightweight manner and internally
 to the departments. We’re slowly getting into that habit in
 engineering.

 As we pilot this process, the format of the high priority reviews can
 help inform and support reviews across the organization.

 Feedback and questions are appreciated.

 All best,
 Erik

 [1] https://wikimediafoundation.org/wiki/Vote:Narrowing_Focus
 [2] https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings
 --
 Erik Möller
 VP of Engineering and Product Development, Wikimedia Foundation

 Support Free Knowledge: https://wikimediafoundation.org/wiki/Donate

 ___
 Wikimedia-l mailing list
 Wikimedia-l@lists.wikimedia.org
 Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l



-- 
Tilman Bayer
Senior Analyst
Wikimedia Foundation
IRC (Freenode): HaeB

___
Wikimedia-l mailing list, guidelines at: 
https://meta.wikimedia.org/wiki/Mailing_lists/Guidelines
Wikimedia-l@lists.wikimedia.org
Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l, 
mailto:wikimedia-l-requ...@lists.wikimedia.org?subject=unsubscribe

Re: [Wikimedia-l] Quarterly reviews of high priority WMF initiatives

2015-02-04 Thread Tilman Bayer
Minutes and slides from last week's quarterly review of the
Foundation's Editing (formerly VisualEditor) team await perusal at
https://meta.wikimedia.org/wiki/WMF_Metrics_and_activities_meetings/Quarterly_reviews/Editing/January_2015
.

On Wed, Dec 19, 2012 at 6:49 PM, Erik Moeller e...@wikimedia.org wrote:
 Hi folks,

 to increase accountability and create more opportunities for course
 corrections and resourcing adjustments as necessary, Sue's asked me
 and Howie Fung to set up a quarterly project evaluation process,
 starting with our highest priority initiatives. These are, according
 to Sue's narrowing focus recommendations which were approved by the
 Board [1]:

 - Visual Editor
 - Mobile (mobile contributions + Wikipedia Zero)
 - Editor Engagement (also known as the E2 and E3 teams)
 - Funds Dissemination Committe and expanded grant-making capacity

 I'm proposing the following initial schedule:

 January:
 - Editor Engagement Experiments

 February:
 - Visual Editor
 - Mobile (Contribs + Zero)

 March:
 - Editor Engagement Features (Echo, Flow projects)
 - Funds Dissemination Committee

 We’ll try doing this on the same day or adjacent to the monthly
 metrics meetings [2], since the team(s) will give a presentation on
 their recent progress, which will help set some context that would
 otherwise need to be covered in the quarterly review itself. This will
 also create open opportunities for feedback and questions.

 My goal is to do this in a manner where even though the quarterly
 review meetings themselves are internal, the outcomes are captured as
 meeting minutes and shared publicly, which is why I'm starting this
 discussion on a public list as well. I've created a wiki page here
 which we can use to discuss the concept further:

 https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews

 The internal review will, at minimum, include:

 Sue Gardner
 myself
 Howie Fung
 Team members and relevant director(s)
 Designated minute-taker

 So for example, for Visual Editor, the review team would be the Visual
 Editor / Parsoid teams, Sue, me, Howie, Terry, and a minute-taker.

 I imagine the structure of the review roughly as follows, with a
 duration of about 2 1/2 hours divided into 25-30 minute blocks:

 - Brief team intro and recap of team's activities through the quarter,
 compared with goals
 - Drill into goals and targets: Did we achieve what we said we would?
 - Review of challenges, blockers and successes
 - Discussion of proposed changes (e.g. resourcing, targets) and other
 action items
 - Buffer time, debriefing

 Once again, the primary purpose of these reviews is to create improved
 structures for internal accountability, escalation points in cases
 where serious changes are necessary, and transparency to the world.

 In addition to these priority initiatives, my recommendation would be
 to conduct quarterly reviews for any activity that requires more than
 a set amount of resources (people/dollars). These additional reviews
 may however be conducted in a more lightweight manner and internally
 to the departments. We’re slowly getting into that habit in
 engineering.

 As we pilot this process, the format of the high priority reviews can
 help inform and support reviews across the organization.

 Feedback and questions are appreciated.

 All best,
 Erik

 [1] https://wikimediafoundation.org/wiki/Vote:Narrowing_Focus
 [2] https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings
 --
 Erik Möller
 VP of Engineering and Product Development, Wikimedia Foundation

 Support Free Knowledge: https://wikimediafoundation.org/wiki/Donate

 ___
 Wikimedia-l mailing list
 Wikimedia-l@lists.wikimedia.org
 Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l



-- 
Tilman Bayer
Senior Analyst
Wikimedia Foundation
IRC (Freenode): HaeB

___
Wikimedia-l mailing list, guidelines at: 
https://meta.wikimedia.org/wiki/Mailing_lists/Guidelines
Wikimedia-l@lists.wikimedia.org
Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l, 
mailto:wikimedia-l-requ...@lists.wikimedia.org?subject=unsubscribe

Re: [Wikimedia-l] Quarterly reviews of high priority WMF initiatives

2015-02-03 Thread Tilman Bayer
Minutes and slides from last week's quarterly review meeting of the
Foundation's Collaboration team (which was formerly called the Core
features team and is working on the Flow project) have appeared here:
https://meta.wikimedia.org/wiki/WMF_Metrics_and_activities_meetings/Quarterly_reviews/Collaboration/January_2015

On Wed, Dec 19, 2012 at 6:49 PM, Erik Moeller e...@wikimedia.org wrote:
 Hi folks,

 to increase accountability and create more opportunities for course
 corrections and resourcing adjustments as necessary, Sue's asked me
 and Howie Fung to set up a quarterly project evaluation process,
 starting with our highest priority initiatives. These are, according
 to Sue's narrowing focus recommendations which were approved by the
 Board [1]:

 - Visual Editor
 - Mobile (mobile contributions + Wikipedia Zero)
 - Editor Engagement (also known as the E2 and E3 teams)
 - Funds Dissemination Committe and expanded grant-making capacity

 I'm proposing the following initial schedule:

 January:
 - Editor Engagement Experiments

 February:
 - Visual Editor
 - Mobile (Contribs + Zero)

 March:
 - Editor Engagement Features (Echo, Flow projects)
 - Funds Dissemination Committee

 We’ll try doing this on the same day or adjacent to the monthly
 metrics meetings [2], since the team(s) will give a presentation on
 their recent progress, which will help set some context that would
 otherwise need to be covered in the quarterly review itself. This will
 also create open opportunities for feedback and questions.

 My goal is to do this in a manner where even though the quarterly
 review meetings themselves are internal, the outcomes are captured as
 meeting minutes and shared publicly, which is why I'm starting this
 discussion on a public list as well. I've created a wiki page here
 which we can use to discuss the concept further:

 https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews

 The internal review will, at minimum, include:

 Sue Gardner
 myself
 Howie Fung
 Team members and relevant director(s)
 Designated minute-taker

 So for example, for Visual Editor, the review team would be the Visual
 Editor / Parsoid teams, Sue, me, Howie, Terry, and a minute-taker.

 I imagine the structure of the review roughly as follows, with a
 duration of about 2 1/2 hours divided into 25-30 minute blocks:

 - Brief team intro and recap of team's activities through the quarter,
 compared with goals
 - Drill into goals and targets: Did we achieve what we said we would?
 - Review of challenges, blockers and successes
 - Discussion of proposed changes (e.g. resourcing, targets) and other
 action items
 - Buffer time, debriefing

 Once again, the primary purpose of these reviews is to create improved
 structures for internal accountability, escalation points in cases
 where serious changes are necessary, and transparency to the world.

 In addition to these priority initiatives, my recommendation would be
 to conduct quarterly reviews for any activity that requires more than
 a set amount of resources (people/dollars). These additional reviews
 may however be conducted in a more lightweight manner and internally
 to the departments. We’re slowly getting into that habit in
 engineering.

 As we pilot this process, the format of the high priority reviews can
 help inform and support reviews across the organization.

 Feedback and questions are appreciated.

 All best,
 Erik

 [1] https://wikimediafoundation.org/wiki/Vote:Narrowing_Focus
 [2] https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings
 --
 Erik Möller
 VP of Engineering and Product Development, Wikimedia Foundation

 Support Free Knowledge: https://wikimediafoundation.org/wiki/Donate

 ___
 Wikimedia-l mailing list
 Wikimedia-l@lists.wikimedia.org
 Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l



-- 
Tilman Bayer
Senior Analyst
Wikimedia Foundation
IRC (Freenode): HaeB

___
Wikimedia-l mailing list, guidelines at: 
https://meta.wikimedia.org/wiki/Mailing_lists/Guidelines
Wikimedia-l@lists.wikimedia.org
Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l, 
mailto:wikimedia-l-requ...@lists.wikimedia.org?subject=unsubscribe

Re: [Wikimedia-l] Quarterly reviews of high priority WMF initiatives

2015-02-02 Thread Tilman Bayer
Minutes and slides from three recent quarterly review meetings held
last week are now available:

Language Engineering team:
https://meta.wikimedia.org/wiki/WMF_Metrics_and_activities_meetings/Quarterly_reviews/Language_Engineering/January_2015

MediaWiki Core team
https://meta.wikimedia.org/wiki/WMF_Metrics_and_activities_meetings/Quarterly_reviews/MediaWiki_Core/January_2015

Talent  Culture team (slides only:)
https://commons.wikimedia.org/wiki/File:WMF_Quarterly_Review-_2014-15_Q2_-_Talent_%26_Culture,_Redacted.pdf

On Wed, Dec 19, 2012 at 6:49 PM, Erik Moeller e...@wikimedia.org wrote:
 Hi folks,

 to increase accountability and create more opportunities for course
 corrections and resourcing adjustments as necessary, Sue's asked me
 and Howie Fung to set up a quarterly project evaluation process,
 starting with our highest priority initiatives. These are, according
 to Sue's narrowing focus recommendations which were approved by the
 Board [1]:

 - Visual Editor
 - Mobile (mobile contributions + Wikipedia Zero)
 - Editor Engagement (also known as the E2 and E3 teams)
 - Funds Dissemination Committe and expanded grant-making capacity

 I'm proposing the following initial schedule:

 January:
 - Editor Engagement Experiments

 February:
 - Visual Editor
 - Mobile (Contribs + Zero)

 March:
 - Editor Engagement Features (Echo, Flow projects)
 - Funds Dissemination Committee

 We’ll try doing this on the same day or adjacent to the monthly
 metrics meetings [2], since the team(s) will give a presentation on
 their recent progress, which will help set some context that would
 otherwise need to be covered in the quarterly review itself. This will
 also create open opportunities for feedback and questions.

 My goal is to do this in a manner where even though the quarterly
 review meetings themselves are internal, the outcomes are captured as
 meeting minutes and shared publicly, which is why I'm starting this
 discussion on a public list as well. I've created a wiki page here
 which we can use to discuss the concept further:

 https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews

 The internal review will, at minimum, include:

 Sue Gardner
 myself
 Howie Fung
 Team members and relevant director(s)
 Designated minute-taker

 So for example, for Visual Editor, the review team would be the Visual
 Editor / Parsoid teams, Sue, me, Howie, Terry, and a minute-taker.

 I imagine the structure of the review roughly as follows, with a
 duration of about 2 1/2 hours divided into 25-30 minute blocks:

 - Brief team intro and recap of team's activities through the quarter,
 compared with goals
 - Drill into goals and targets: Did we achieve what we said we would?
 - Review of challenges, blockers and successes
 - Discussion of proposed changes (e.g. resourcing, targets) and other
 action items
 - Buffer time, debriefing

 Once again, the primary purpose of these reviews is to create improved
 structures for internal accountability, escalation points in cases
 where serious changes are necessary, and transparency to the world.

 In addition to these priority initiatives, my recommendation would be
 to conduct quarterly reviews for any activity that requires more than
 a set amount of resources (people/dollars). These additional reviews
 may however be conducted in a more lightweight manner and internally
 to the departments. We’re slowly getting into that habit in
 engineering.

 As we pilot this process, the format of the high priority reviews can
 help inform and support reviews across the organization.

 Feedback and questions are appreciated.

 All best,
 Erik

 [1] https://wikimediafoundation.org/wiki/Vote:Narrowing_Focus
 [2] https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings
 --
 Erik Möller
 VP of Engineering and Product Development, Wikimedia Foundation

 Support Free Knowledge: https://wikimediafoundation.org/wiki/Donate

 ___
 Wikimedia-l mailing list
 Wikimedia-l@lists.wikimedia.org
 Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l



-- 
Tilman Bayer
Senior Analyst
Wikimedia Foundation
IRC (Freenode): HaeB

___
Wikimedia-l mailing list, guidelines at: 
https://meta.wikimedia.org/wiki/Mailing_lists/Guidelines
Wikimedia-l@lists.wikimedia.org
Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l, 
mailto:wikimedia-l-requ...@lists.wikimedia.org?subject=unsubscribe

Re: [Wikimedia-l] Quarterly reviews of high priority WMF initiatives

2015-01-31 Thread Tilman Bayer
Minutes and slides from four recent quarterly reviews are now available:

Team Practices Group:
https://meta.wikimedia.org/wiki/WMF_Metrics_and_activities_meetings/Quarterly_reviews/Team_Practices/January_2015

Engineering Commmunity Team:
https://meta.wikimedia.org/wiki/WMF_Metrics_and_activities_meetings/Quarterly_reviews/Engineering_Community/January_2015

Release Engineering and QA (Quality Assurance) team:
https://meta.wikimedia.org/wiki/WMF_Metrics_and_activities_meetings/Quarterly_reviews/Release_Engineering/January_2015

Mobile Partnerships (Wikipedia Zero) team:
https://meta.wikimedia.org/wiki/WMF_Metrics_and_activities_meetings/Quarterly_reviews/Wikipedia_Zero/January_2015

On Wed, Dec 19, 2012 at 6:49 PM, Erik Moeller e...@wikimedia.org wrote:
 Hi folks,

 to increase accountability and create more opportunities for course
 corrections and resourcing adjustments as necessary, Sue's asked me
 and Howie Fung to set up a quarterly project evaluation process,
 starting with our highest priority initiatives. These are, according
 to Sue's narrowing focus recommendations which were approved by the
 Board [1]:

 - Visual Editor
 - Mobile (mobile contributions + Wikipedia Zero)
 - Editor Engagement (also known as the E2 and E3 teams)
 - Funds Dissemination Committe and expanded grant-making capacity

 I'm proposing the following initial schedule:

 January:
 - Editor Engagement Experiments

 February:
 - Visual Editor
 - Mobile (Contribs + Zero)

 March:
 - Editor Engagement Features (Echo, Flow projects)
 - Funds Dissemination Committee

 We’ll try doing this on the same day or adjacent to the monthly
 metrics meetings [2], since the team(s) will give a presentation on
 their recent progress, which will help set some context that would
 otherwise need to be covered in the quarterly review itself. This will
 also create open opportunities for feedback and questions.

 My goal is to do this in a manner where even though the quarterly
 review meetings themselves are internal, the outcomes are captured as
 meeting minutes and shared publicly, which is why I'm starting this
 discussion on a public list as well. I've created a wiki page here
 which we can use to discuss the concept further:

 https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews

 The internal review will, at minimum, include:

 Sue Gardner
 myself
 Howie Fung
 Team members and relevant director(s)
 Designated minute-taker

 So for example, for Visual Editor, the review team would be the Visual
 Editor / Parsoid teams, Sue, me, Howie, Terry, and a minute-taker.

 I imagine the structure of the review roughly as follows, with a
 duration of about 2 1/2 hours divided into 25-30 minute blocks:

 - Brief team intro and recap of team's activities through the quarter,
 compared with goals
 - Drill into goals and targets: Did we achieve what we said we would?
 - Review of challenges, blockers and successes
 - Discussion of proposed changes (e.g. resourcing, targets) and other
 action items
 - Buffer time, debriefing

 Once again, the primary purpose of these reviews is to create improved
 structures for internal accountability, escalation points in cases
 where serious changes are necessary, and transparency to the world.

 In addition to these priority initiatives, my recommendation would be
 to conduct quarterly reviews for any activity that requires more than
 a set amount of resources (people/dollars). These additional reviews
 may however be conducted in a more lightweight manner and internally
 to the departments. We’re slowly getting into that habit in
 engineering.

 As we pilot this process, the format of the high priority reviews can
 help inform and support reviews across the organization.

 Feedback and questions are appreciated.

 All best,
 Erik

 [1] https://wikimediafoundation.org/wiki/Vote:Narrowing_Focus
 [2] https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings
 --
 Erik Möller
 VP of Engineering and Product Development, Wikimedia Foundation

 Support Free Knowledge: https://wikimediafoundation.org/wiki/Donate

 ___
 Wikimedia-l mailing list
 Wikimedia-l@lists.wikimedia.org
 Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l



-- 
Tilman Bayer
Senior Analyst
Wikimedia Foundation
IRC (Freenode): HaeB

___
Wikimedia-l mailing list, guidelines at: 
https://meta.wikimedia.org/wiki/Mailing_lists/Guidelines
Wikimedia-l@lists.wikimedia.org
Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l, 
mailto:wikimedia-l-requ...@lists.wikimedia.org?subject=unsubscribe

Re: [Wikimedia-l] Quarterly reviews of high priority WMF initiatives

2015-01-31 Thread Tilman Bayer
Minutes and slides from two recent quarterly review meetings of the
Foundation's Grantmaking department are now available at:

https://meta.wikimedia.org/wiki/WMF_Metrics_and_activities_meetings/Quarterly_reviews/Grantmaking/January_2015_-1
(focusing on the Experimentation  Community Health area)
and
https://meta.wikimedia.org/wiki/WMF_Metrics_and_activities_meetings/Quarterly_reviews/Grantmaking/January_2015_-2
(focusing on the Community Growth area)

On Wed, Dec 19, 2012 at 6:49 PM, Erik Moeller e...@wikimedia.org wrote:
 Hi folks,

 to increase accountability and create more opportunities for course
 corrections and resourcing adjustments as necessary, Sue's asked me
 and Howie Fung to set up a quarterly project evaluation process,
 starting with our highest priority initiatives. These are, according
 to Sue's narrowing focus recommendations which were approved by the
 Board [1]:

 - Visual Editor
 - Mobile (mobile contributions + Wikipedia Zero)
 - Editor Engagement (also known as the E2 and E3 teams)
 - Funds Dissemination Committe and expanded grant-making capacity

 I'm proposing the following initial schedule:

 January:
 - Editor Engagement Experiments

 February:
 - Visual Editor
 - Mobile (Contribs + Zero)

 March:
 - Editor Engagement Features (Echo, Flow projects)
 - Funds Dissemination Committee

 We’ll try doing this on the same day or adjacent to the monthly
 metrics meetings [2], since the team(s) will give a presentation on
 their recent progress, which will help set some context that would
 otherwise need to be covered in the quarterly review itself. This will
 also create open opportunities for feedback and questions.

 My goal is to do this in a manner where even though the quarterly
 review meetings themselves are internal, the outcomes are captured as
 meeting minutes and shared publicly, which is why I'm starting this
 discussion on a public list as well. I've created a wiki page here
 which we can use to discuss the concept further:

 https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews

 The internal review will, at minimum, include:

 Sue Gardner
 myself
 Howie Fung
 Team members and relevant director(s)
 Designated minute-taker

 So for example, for Visual Editor, the review team would be the Visual
 Editor / Parsoid teams, Sue, me, Howie, Terry, and a minute-taker.

 I imagine the structure of the review roughly as follows, with a
 duration of about 2 1/2 hours divided into 25-30 minute blocks:

 - Brief team intro and recap of team's activities through the quarter,
 compared with goals
 - Drill into goals and targets: Did we achieve what we said we would?
 - Review of challenges, blockers and successes
 - Discussion of proposed changes (e.g. resourcing, targets) and other
 action items
 - Buffer time, debriefing

 Once again, the primary purpose of these reviews is to create improved
 structures for internal accountability, escalation points in cases
 where serious changes are necessary, and transparency to the world.

 In addition to these priority initiatives, my recommendation would be
 to conduct quarterly reviews for any activity that requires more than
 a set amount of resources (people/dollars). These additional reviews
 may however be conducted in a more lightweight manner and internally
 to the departments. We’re slowly getting into that habit in
 engineering.

 As we pilot this process, the format of the high priority reviews can
 help inform and support reviews across the organization.

 Feedback and questions are appreciated.

 All best,
 Erik

 [1] https://wikimediafoundation.org/wiki/Vote:Narrowing_Focus
 [2] https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings
 --
 Erik Möller
 VP of Engineering and Product Development, Wikimedia Foundation

 Support Free Knowledge: https://wikimediafoundation.org/wiki/Donate

 ___
 Wikimedia-l mailing list
 Wikimedia-l@lists.wikimedia.org
 Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l



-- 
Tilman Bayer
Senior Analyst
Wikimedia Foundation
IRC (Freenode): HaeB

___
Wikimedia-l mailing list, guidelines at: 
https://meta.wikimedia.org/wiki/Mailing_lists/Guidelines
Wikimedia-l@lists.wikimedia.org
Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l, 
mailto:wikimedia-l-requ...@lists.wikimedia.org?subject=unsubscribe

Re: [Wikimedia-l] Quarterly reviews of high priority WMF initiatives

2015-01-23 Thread Guillaume Paumier
Hello again,

Minutes and slides from the January 2015 quarterly review of the
Foundation's Technical Operations team are now available at
https://meta.wikimedia.org/wiki/WMF_Metrics_and_activities_meetings/Quarterly_reviews/Tech_Ops/January_2015


-- 
Guillaume Paumier

___
Wikimedia-l mailing list, guidelines at: 
https://meta.wikimedia.org/wiki/Mailing_lists/Guidelines
Wikimedia-l@lists.wikimedia.org
Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l, 
mailto:wikimedia-l-requ...@lists.wikimedia.org?subject=unsubscribe

Re: [Wikimedia-l] Quarterly reviews of high priority WMF initiatives

2015-01-23 Thread Guillaume Paumier
Hello,

Minutes and slides from the January 2015 quarterly review of the
Foundation's Finance  Administration team are now available at
https://meta.wikimedia.org/wiki/WMF_Metrics_and_activities_meetings/Quarterly_reviews/Finance_%26_Administration/January_2015

-- 
Guillaume Paumier

___
Wikimedia-l mailing list, guidelines at: 
https://meta.wikimedia.org/wiki/Mailing_lists/Guidelines
Wikimedia-l@lists.wikimedia.org
Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l, 
mailto:wikimedia-l-requ...@lists.wikimedia.org?subject=unsubscribe

Re: [Wikimedia-l] Quarterly reviews of high priority WMF initiatives

2014-10-28 Thread Tilman Bayer
Minutes and slides from Thursday's quarterly review meeting of the
Foundation's Multimedia team are now available at
https://meta.wikimedia.org/wiki/WMF_Metrics_and_activities_meetings/Quarterly_reviews/Multimedia/October_2014
.

On Wed, Dec 19, 2012 at 6:49 PM, Erik Moeller e...@wikimedia.org wrote:
 Hi folks,

 to increase accountability and create more opportunities for course
 corrections and resourcing adjustments as necessary, Sue's asked me
 and Howie Fung to set up a quarterly project evaluation process,
 starting with our highest priority initiatives. These are, according
 to Sue's narrowing focus recommendations which were approved by the
 Board [1]:

 - Visual Editor
 - Mobile (mobile contributions + Wikipedia Zero)
 - Editor Engagement (also known as the E2 and E3 teams)
 - Funds Dissemination Committe and expanded grant-making capacity

 I'm proposing the following initial schedule:

 January:
 - Editor Engagement Experiments

 February:
 - Visual Editor
 - Mobile (Contribs + Zero)

 March:
 - Editor Engagement Features (Echo, Flow projects)
 - Funds Dissemination Committee

 We’ll try doing this on the same day or adjacent to the monthly
 metrics meetings [2], since the team(s) will give a presentation on
 their recent progress, which will help set some context that would
 otherwise need to be covered in the quarterly review itself. This will
 also create open opportunities for feedback and questions.

 My goal is to do this in a manner where even though the quarterly
 review meetings themselves are internal, the outcomes are captured as
 meeting minutes and shared publicly, which is why I'm starting this
 discussion on a public list as well. I've created a wiki page here
 which we can use to discuss the concept further:

 https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews

 The internal review will, at minimum, include:

 Sue Gardner
 myself
 Howie Fung
 Team members and relevant director(s)
 Designated minute-taker

 So for example, for Visual Editor, the review team would be the Visual
 Editor / Parsoid teams, Sue, me, Howie, Terry, and a minute-taker.

 I imagine the structure of the review roughly as follows, with a
 duration of about 2 1/2 hours divided into 25-30 minute blocks:

 - Brief team intro and recap of team's activities through the quarter,
 compared with goals
 - Drill into goals and targets: Did we achieve what we said we would?
 - Review of challenges, blockers and successes
 - Discussion of proposed changes (e.g. resourcing, targets) and other
 action items
 - Buffer time, debriefing

 Once again, the primary purpose of these reviews is to create improved
 structures for internal accountability, escalation points in cases
 where serious changes are necessary, and transparency to the world.

 In addition to these priority initiatives, my recommendation would be
 to conduct quarterly reviews for any activity that requires more than
 a set amount of resources (people/dollars). These additional reviews
 may however be conducted in a more lightweight manner and internally
 to the departments. We’re slowly getting into that habit in
 engineering.

 As we pilot this process, the format of the high priority reviews can
 help inform and support reviews across the organization.

 Feedback and questions are appreciated.

 All best,
 Erik

 [1] https://wikimediafoundation.org/wiki/Vote:Narrowing_Focus
 [2] https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings
 --
 Erik Möller
 VP of Engineering and Product Development, Wikimedia Foundation

 Support Free Knowledge: https://wikimediafoundation.org/wiki/Donate

 ___
 Wikimedia-l mailing list
 Wikimedia-l@lists.wikimedia.org
 Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l



-- 
Tilman Bayer
Senior Operations Analyst (Movement Communications)
Wikimedia Foundation
IRC (Freenode): HaeB

___
Wikimedia-l mailing list, guidelines at: 
https://meta.wikimedia.org/wiki/Mailing_lists/Guidelines
Wikimedia-l@lists.wikimedia.org
Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l, 
mailto:wikimedia-l-requ...@lists.wikimedia.org?subject=unsubscribe

Re: [Wikimedia-l] Quarterly reviews of high priority WMF initiatives

2014-10-22 Thread Tilman Bayer
Minutes and slides from the recent quarterly review meeting of the
Foundation's MediaWiki Core team can now be found at
https://www.mediawiki.org/wiki/Wikimedia_MediaWiki_Core_Team/Quarterly_review,_October_2014/Notes
.

On Wed, Dec 19, 2012 at 6:49 PM, Erik Moeller e...@wikimedia.org wrote:
 Hi folks,

 to increase accountability and create more opportunities for course
 corrections and resourcing adjustments as necessary, Sue's asked me
 and Howie Fung to set up a quarterly project evaluation process,
 starting with our highest priority initiatives. These are, according
 to Sue's narrowing focus recommendations which were approved by the
 Board [1]:

 - Visual Editor
 - Mobile (mobile contributions + Wikipedia Zero)
 - Editor Engagement (also known as the E2 and E3 teams)
 - Funds Dissemination Committe and expanded grant-making capacity

 I'm proposing the following initial schedule:

 January:
 - Editor Engagement Experiments

 February:
 - Visual Editor
 - Mobile (Contribs + Zero)

 March:
 - Editor Engagement Features (Echo, Flow projects)
 - Funds Dissemination Committee

 We’ll try doing this on the same day or adjacent to the monthly
 metrics meetings [2], since the team(s) will give a presentation on
 their recent progress, which will help set some context that would
 otherwise need to be covered in the quarterly review itself. This will
 also create open opportunities for feedback and questions.

 My goal is to do this in a manner where even though the quarterly
 review meetings themselves are internal, the outcomes are captured as
 meeting minutes and shared publicly, which is why I'm starting this
 discussion on a public list as well. I've created a wiki page here
 which we can use to discuss the concept further:

 https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews

 The internal review will, at minimum, include:

 Sue Gardner
 myself
 Howie Fung
 Team members and relevant director(s)
 Designated minute-taker

 So for example, for Visual Editor, the review team would be the Visual
 Editor / Parsoid teams, Sue, me, Howie, Terry, and a minute-taker.

 I imagine the structure of the review roughly as follows, with a
 duration of about 2 1/2 hours divided into 25-30 minute blocks:

 - Brief team intro and recap of team's activities through the quarter,
 compared with goals
 - Drill into goals and targets: Did we achieve what we said we would?
 - Review of challenges, blockers and successes
 - Discussion of proposed changes (e.g. resourcing, targets) and other
 action items
 - Buffer time, debriefing

 Once again, the primary purpose of these reviews is to create improved
 structures for internal accountability, escalation points in cases
 where serious changes are necessary, and transparency to the world.

 In addition to these priority initiatives, my recommendation would be
 to conduct quarterly reviews for any activity that requires more than
 a set amount of resources (people/dollars). These additional reviews
 may however be conducted in a more lightweight manner and internally
 to the departments. We’re slowly getting into that habit in
 engineering.

 As we pilot this process, the format of the high priority reviews can
 help inform and support reviews across the organization.

 Feedback and questions are appreciated.

 All best,
 Erik

 [1] https://wikimediafoundation.org/wiki/Vote:Narrowing_Focus
 [2] https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings
 --
 Erik Möller
 VP of Engineering and Product Development, Wikimedia Foundation

 Support Free Knowledge: https://wikimediafoundation.org/wiki/Donate

 ___
 Wikimedia-l mailing list
 Wikimedia-l@lists.wikimedia.org
 Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l



-- 
Tilman Bayer
Senior Operations Analyst (Movement Communications)
Wikimedia Foundation
IRC (Freenode): HaeB

___
Wikimedia-l mailing list, guidelines at: 
https://meta.wikimedia.org/wiki/Mailing_lists/Guidelines
Wikimedia-l@lists.wikimedia.org
Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l, 
mailto:wikimedia-l-requ...@lists.wikimedia.org?subject=unsubscribe

Re: [Wikimedia-l] Quarterly reviews of high priority WMF initiatives

2014-10-21 Thread Tilman Bayer
Minutes and slides from the recent quarterly review meeting of the
Foundation's Parsoid, Services and OCG (Offline content generator)
teams have appeared at
https://meta.wikimedia.org/wiki/WMF_Metrics_and_activities_meetings/Quarterly_reviews/Parsoid/October_2014
.

On Wed, Dec 19, 2012 at 6:49 PM, Erik Moeller e...@wikimedia.org wrote:
 Hi folks,

 to increase accountability and create more opportunities for course
 corrections and resourcing adjustments as necessary, Sue's asked me
 and Howie Fung to set up a quarterly project evaluation process,
 starting with our highest priority initiatives. These are, according
 to Sue's narrowing focus recommendations which were approved by the
 Board [1]:

 - Visual Editor
 - Mobile (mobile contributions + Wikipedia Zero)
 - Editor Engagement (also known as the E2 and E3 teams)
 - Funds Dissemination Committe and expanded grant-making capacity

 I'm proposing the following initial schedule:

 January:
 - Editor Engagement Experiments

 February:
 - Visual Editor
 - Mobile (Contribs + Zero)

 March:
 - Editor Engagement Features (Echo, Flow projects)
 - Funds Dissemination Committee

 We’ll try doing this on the same day or adjacent to the monthly
 metrics meetings [2], since the team(s) will give a presentation on
 their recent progress, which will help set some context that would
 otherwise need to be covered in the quarterly review itself. This will
 also create open opportunities for feedback and questions.

 My goal is to do this in a manner where even though the quarterly
 review meetings themselves are internal, the outcomes are captured as
 meeting minutes and shared publicly, which is why I'm starting this
 discussion on a public list as well. I've created a wiki page here
 which we can use to discuss the concept further:

 https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews

 The internal review will, at minimum, include:

 Sue Gardner
 myself
 Howie Fung
 Team members and relevant director(s)
 Designated minute-taker

 So for example, for Visual Editor, the review team would be the Visual
 Editor / Parsoid teams, Sue, me, Howie, Terry, and a minute-taker.

 I imagine the structure of the review roughly as follows, with a
 duration of about 2 1/2 hours divided into 25-30 minute blocks:

 - Brief team intro and recap of team's activities through the quarter,
 compared with goals
 - Drill into goals and targets: Did we achieve what we said we would?
 - Review of challenges, blockers and successes
 - Discussion of proposed changes (e.g. resourcing, targets) and other
 action items
 - Buffer time, debriefing

 Once again, the primary purpose of these reviews is to create improved
 structures for internal accountability, escalation points in cases
 where serious changes are necessary, and transparency to the world.

 In addition to these priority initiatives, my recommendation would be
 to conduct quarterly reviews for any activity that requires more than
 a set amount of resources (people/dollars). These additional reviews
 may however be conducted in a more lightweight manner and internally
 to the departments. We’re slowly getting into that habit in
 engineering.

 As we pilot this process, the format of the high priority reviews can
 help inform and support reviews across the organization.

 Feedback and questions are appreciated.

 All best,
 Erik

 [1] https://wikimediafoundation.org/wiki/Vote:Narrowing_Focus
 [2] https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings
 --
 Erik Möller
 VP of Engineering and Product Development, Wikimedia Foundation

 Support Free Knowledge: https://wikimediafoundation.org/wiki/Donate

 ___
 Wikimedia-l mailing list
 Wikimedia-l@lists.wikimedia.org
 Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l



-- 
Tilman Bayer
Senior Operations Analyst (Movement Communications)
Wikimedia Foundation
IRC (Freenode): HaeB

___
Wikimedia-l mailing list, guidelines at: 
https://meta.wikimedia.org/wiki/Mailing_lists/Guidelines
Wikimedia-l@lists.wikimedia.org
Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l, 
mailto:wikimedia-l-requ...@lists.wikimedia.org?subject=unsubscribe

Re: [Wikimedia-l] Quarterly reviews of high priority WMF initiatives

2014-10-21 Thread Tilman Bayer
Minutes and slides from last week's quarterly review meeting of the
MediaWiki Release Management team are now available at
https://meta.wikimedia.org/wiki/WMF_Metrics_and_activities_meetings/Quarterly_reviews/MediaWiki_Release/October_2014
.

On Wed, Dec 19, 2012 at 6:49 PM, Erik Moeller e...@wikimedia.org wrote:
 Hi folks,

 to increase accountability and create more opportunities for course
 corrections and resourcing adjustments as necessary, Sue's asked me
 and Howie Fung to set up a quarterly project evaluation process,
 starting with our highest priority initiatives. These are, according
 to Sue's narrowing focus recommendations which were approved by the
 Board [1]:

 - Visual Editor
 - Mobile (mobile contributions + Wikipedia Zero)
 - Editor Engagement (also known as the E2 and E3 teams)
 - Funds Dissemination Committe and expanded grant-making capacity

 I'm proposing the following initial schedule:

 January:
 - Editor Engagement Experiments

 February:
 - Visual Editor
 - Mobile (Contribs + Zero)

 March:
 - Editor Engagement Features (Echo, Flow projects)
 - Funds Dissemination Committee

 We’ll try doing this on the same day or adjacent to the monthly
 metrics meetings [2], since the team(s) will give a presentation on
 their recent progress, which will help set some context that would
 otherwise need to be covered in the quarterly review itself. This will
 also create open opportunities for feedback and questions.

 My goal is to do this in a manner where even though the quarterly
 review meetings themselves are internal, the outcomes are captured as
 meeting minutes and shared publicly, which is why I'm starting this
 discussion on a public list as well. I've created a wiki page here
 which we can use to discuss the concept further:

 https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews

 The internal review will, at minimum, include:

 Sue Gardner
 myself
 Howie Fung
 Team members and relevant director(s)
 Designated minute-taker

 So for example, for Visual Editor, the review team would be the Visual
 Editor / Parsoid teams, Sue, me, Howie, Terry, and a minute-taker.

 I imagine the structure of the review roughly as follows, with a
 duration of about 2 1/2 hours divided into 25-30 minute blocks:

 - Brief team intro and recap of team's activities through the quarter,
 compared with goals
 - Drill into goals and targets: Did we achieve what we said we would?
 - Review of challenges, blockers and successes
 - Discussion of proposed changes (e.g. resourcing, targets) and other
 action items
 - Buffer time, debriefing

 Once again, the primary purpose of these reviews is to create improved
 structures for internal accountability, escalation points in cases
 where serious changes are necessary, and transparency to the world.

 In addition to these priority initiatives, my recommendation would be
 to conduct quarterly reviews for any activity that requires more than
 a set amount of resources (people/dollars). These additional reviews
 may however be conducted in a more lightweight manner and internally
 to the departments. We’re slowly getting into that habit in
 engineering.

 As we pilot this process, the format of the high priority reviews can
 help inform and support reviews across the organization.

 Feedback and questions are appreciated.

 All best,
 Erik

 [1] https://wikimediafoundation.org/wiki/Vote:Narrowing_Focus
 [2] https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings
 --
 Erik Möller
 VP of Engineering and Product Development, Wikimedia Foundation

 Support Free Knowledge: https://wikimediafoundation.org/wiki/Donate

 ___
 Wikimedia-l mailing list
 Wikimedia-l@lists.wikimedia.org
 Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l



-- 
Tilman Bayer
Senior Operations Analyst (Movement Communications)
Wikimedia Foundation
IRC (Freenode): HaeB

___
Wikimedia-l mailing list, guidelines at: 
https://meta.wikimedia.org/wiki/Mailing_lists/Guidelines
Wikimedia-l@lists.wikimedia.org
Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l, 
mailto:wikimedia-l-requ...@lists.wikimedia.org?subject=unsubscribe

Re: [Wikimedia-l] Quarterly reviews of high priority WMF initiatives

2014-10-05 Thread Tilman Bayer
Minutes and slides from Wednesday's quarterly review meeting of the
Foundation's Core features (Flow) team are now available at
https://meta.wikimedia.org/wiki/WMF_Metrics_and_activities_meetings/Quarterly_reviews/Core_features/October_2014
.

On Wed, Dec 19, 2012 at 6:49 PM, Erik Moeller e...@wikimedia.org wrote:
 Hi folks,

 to increase accountability and create more opportunities for course
 corrections and resourcing adjustments as necessary, Sue's asked me
 and Howie Fung to set up a quarterly project evaluation process,
 starting with our highest priority initiatives. These are, according
 to Sue's narrowing focus recommendations which were approved by the
 Board [1]:

 - Visual Editor
 - Mobile (mobile contributions + Wikipedia Zero)
 - Editor Engagement (also known as the E2 and E3 teams)
 - Funds Dissemination Committe and expanded grant-making capacity

 I'm proposing the following initial schedule:

 January:
 - Editor Engagement Experiments

 February:
 - Visual Editor
 - Mobile (Contribs + Zero)

 March:
 - Editor Engagement Features (Echo, Flow projects)
 - Funds Dissemination Committee

 We’ll try doing this on the same day or adjacent to the monthly
 metrics meetings [2], since the team(s) will give a presentation on
 their recent progress, which will help set some context that would
 otherwise need to be covered in the quarterly review itself. This will
 also create open opportunities for feedback and questions.

 My goal is to do this in a manner where even though the quarterly
 review meetings themselves are internal, the outcomes are captured as
 meeting minutes and shared publicly, which is why I'm starting this
 discussion on a public list as well. I've created a wiki page here
 which we can use to discuss the concept further:

 https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews

 The internal review will, at minimum, include:

 Sue Gardner
 myself
 Howie Fung
 Team members and relevant director(s)
 Designated minute-taker

 So for example, for Visual Editor, the review team would be the Visual
 Editor / Parsoid teams, Sue, me, Howie, Terry, and a minute-taker.

 I imagine the structure of the review roughly as follows, with a
 duration of about 2 1/2 hours divided into 25-30 minute blocks:

 - Brief team intro and recap of team's activities through the quarter,
 compared with goals
 - Drill into goals and targets: Did we achieve what we said we would?
 - Review of challenges, blockers and successes
 - Discussion of proposed changes (e.g. resourcing, targets) and other
 action items
 - Buffer time, debriefing

 Once again, the primary purpose of these reviews is to create improved
 structures for internal accountability, escalation points in cases
 where serious changes are necessary, and transparency to the world.

 In addition to these priority initiatives, my recommendation would be
 to conduct quarterly reviews for any activity that requires more than
 a set amount of resources (people/dollars). These additional reviews
 may however be conducted in a more lightweight manner and internally
 to the departments. We’re slowly getting into that habit in
 engineering.

 As we pilot this process, the format of the high priority reviews can
 help inform and support reviews across the organization.

 Feedback and questions are appreciated.

 All best,
 Erik

 [1] https://wikimediafoundation.org/wiki/Vote:Narrowing_Focus
 [2] https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings
 --
 Erik Möller
 VP of Engineering and Product Development, Wikimedia Foundation

 Support Free Knowledge: https://wikimediafoundation.org/wiki/Donate

 ___
 Wikimedia-l mailing list
 Wikimedia-l@lists.wikimedia.org
 Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l



-- 
Tilman Bayer
Senior Operations Analyst (Movement Communications)
Wikimedia Foundation
IRC (Freenode): HaeB

___
Wikimedia-l mailing list, guidelines at: 
https://meta.wikimedia.org/wiki/Mailing_lists/Guidelines
Wikimedia-l@lists.wikimedia.org
Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l, 
mailto:wikimedia-l-requ...@lists.wikimedia.org?subject=unsubscribe

Re: [Wikimedia-l] Quarterly reviews of high priority WMF initiatives

2014-10-05 Thread Tilman Bayer
Minutes and slides from Wednesday's quarterly review meeting of the
Foundation's Editing (formerly VisualEditor) team can now be found at
https://meta.wikimedia.org/wiki/WMF_Metrics_and_activities_meetings/Quarterly_reviews/Editing/October_2014
.

On Wed, Dec 19, 2012 at 6:49 PM, Erik Moeller e...@wikimedia.org wrote:
 Hi folks,

 to increase accountability and create more opportunities for course
 corrections and resourcing adjustments as necessary, Sue's asked me
 and Howie Fung to set up a quarterly project evaluation process,
 starting with our highest priority initiatives. These are, according
 to Sue's narrowing focus recommendations which were approved by the
 Board [1]:

 - Visual Editor
 - Mobile (mobile contributions + Wikipedia Zero)
 - Editor Engagement (also known as the E2 and E3 teams)
 - Funds Dissemination Committe and expanded grant-making capacity

 I'm proposing the following initial schedule:

 January:
 - Editor Engagement Experiments

 February:
 - Visual Editor
 - Mobile (Contribs + Zero)

 March:
 - Editor Engagement Features (Echo, Flow projects)
 - Funds Dissemination Committee

 We’ll try doing this on the same day or adjacent to the monthly
 metrics meetings [2], since the team(s) will give a presentation on
 their recent progress, which will help set some context that would
 otherwise need to be covered in the quarterly review itself. This will
 also create open opportunities for feedback and questions.

 My goal is to do this in a manner where even though the quarterly
 review meetings themselves are internal, the outcomes are captured as
 meeting minutes and shared publicly, which is why I'm starting this
 discussion on a public list as well. I've created a wiki page here
 which we can use to discuss the concept further:

 https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews

 The internal review will, at minimum, include:

 Sue Gardner
 myself
 Howie Fung
 Team members and relevant director(s)
 Designated minute-taker

 So for example, for Visual Editor, the review team would be the Visual
 Editor / Parsoid teams, Sue, me, Howie, Terry, and a minute-taker.

 I imagine the structure of the review roughly as follows, with a
 duration of about 2 1/2 hours divided into 25-30 minute blocks:

 - Brief team intro and recap of team's activities through the quarter,
 compared with goals
 - Drill into goals and targets: Did we achieve what we said we would?
 - Review of challenges, blockers and successes
 - Discussion of proposed changes (e.g. resourcing, targets) and other
 action items
 - Buffer time, debriefing

 Once again, the primary purpose of these reviews is to create improved
 structures for internal accountability, escalation points in cases
 where serious changes are necessary, and transparency to the world.

 In addition to these priority initiatives, my recommendation would be
 to conduct quarterly reviews for any activity that requires more than
 a set amount of resources (people/dollars). These additional reviews
 may however be conducted in a more lightweight manner and internally
 to the departments. We’re slowly getting into that habit in
 engineering.

 As we pilot this process, the format of the high priority reviews can
 help inform and support reviews across the organization.

 Feedback and questions are appreciated.

 All best,
 Erik

 [1] https://wikimediafoundation.org/wiki/Vote:Narrowing_Focus
 [2] https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings
 --
 Erik Möller
 VP of Engineering and Product Development, Wikimedia Foundation

 Support Free Knowledge: https://wikimediafoundation.org/wiki/Donate

 ___
 Wikimedia-l mailing list
 Wikimedia-l@lists.wikimedia.org
 Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l



-- 
Tilman Bayer
Senior Operations Analyst (Movement Communications)
Wikimedia Foundation
IRC (Freenode): HaeB

___
Wikimedia-l mailing list, guidelines at: 
https://meta.wikimedia.org/wiki/Mailing_lists/Guidelines
Wikimedia-l@lists.wikimedia.org
Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l, 
mailto:wikimedia-l-requ...@lists.wikimedia.org?subject=unsubscribe

Re: [Wikimedia-l] Quarterly reviews of high priority WMF initiatives

2014-10-04 Thread Tilman Bayer
Minutes and slides from Monday's quarterly review meeting of the
Foundation's Grantmaking department are now available at
https://meta.wikimedia.org/wiki/WMF_Metrics_and_activities_meetings/Quarterly_reviews/Grantmaking/September_2014
.

On Wed, Dec 19, 2012 at 6:49 PM, Erik Moeller e...@wikimedia.org wrote:
 Hi folks,

 to increase accountability and create more opportunities for course
 corrections and resourcing adjustments as necessary, Sue's asked me
 and Howie Fung to set up a quarterly project evaluation process,
 starting with our highest priority initiatives. These are, according
 to Sue's narrowing focus recommendations which were approved by the
 Board [1]:

 - Visual Editor
 - Mobile (mobile contributions + Wikipedia Zero)
 - Editor Engagement (also known as the E2 and E3 teams)
 - Funds Dissemination Committe and expanded grant-making capacity

 I'm proposing the following initial schedule:

 January:
 - Editor Engagement Experiments

 February:
 - Visual Editor
 - Mobile (Contribs + Zero)

 March:
 - Editor Engagement Features (Echo, Flow projects)
 - Funds Dissemination Committee

 We’ll try doing this on the same day or adjacent to the monthly
 metrics meetings [2], since the team(s) will give a presentation on
 their recent progress, which will help set some context that would
 otherwise need to be covered in the quarterly review itself. This will
 also create open opportunities for feedback and questions.

 My goal is to do this in a manner where even though the quarterly
 review meetings themselves are internal, the outcomes are captured as
 meeting minutes and shared publicly, which is why I'm starting this
 discussion on a public list as well. I've created a wiki page here
 which we can use to discuss the concept further:

 https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews

 The internal review will, at minimum, include:

 Sue Gardner
 myself
 Howie Fung
 Team members and relevant director(s)
 Designated minute-taker

 So for example, for Visual Editor, the review team would be the Visual
 Editor / Parsoid teams, Sue, me, Howie, Terry, and a minute-taker.

 I imagine the structure of the review roughly as follows, with a
 duration of about 2 1/2 hours divided into 25-30 minute blocks:

 - Brief team intro and recap of team's activities through the quarter,
 compared with goals
 - Drill into goals and targets: Did we achieve what we said we would?
 - Review of challenges, blockers and successes
 - Discussion of proposed changes (e.g. resourcing, targets) and other
 action items
 - Buffer time, debriefing

 Once again, the primary purpose of these reviews is to create improved
 structures for internal accountability, escalation points in cases
 where serious changes are necessary, and transparency to the world.

 In addition to these priority initiatives, my recommendation would be
 to conduct quarterly reviews for any activity that requires more than
 a set amount of resources (people/dollars). These additional reviews
 may however be conducted in a more lightweight manner and internally
 to the departments. We’re slowly getting into that habit in
 engineering.

 As we pilot this process, the format of the high priority reviews can
 help inform and support reviews across the organization.

 Feedback and questions are appreciated.

 All best,
 Erik

 [1] https://wikimediafoundation.org/wiki/Vote:Narrowing_Focus
 [2] https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings
 --
 Erik Möller
 VP of Engineering and Product Development, Wikimedia Foundation

 Support Free Knowledge: https://wikimediafoundation.org/wiki/Donate

 ___
 Wikimedia-l mailing list
 Wikimedia-l@lists.wikimedia.org
 Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l



-- 
Tilman Bayer
Senior Operations Analyst (Movement Communications)
Wikimedia Foundation
IRC (Freenode): HaeB

___
Wikimedia-l mailing list, guidelines at: 
https://meta.wikimedia.org/wiki/Mailing_lists/Guidelines
Wikimedia-l@lists.wikimedia.org
Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l, 
mailto:wikimedia-l-requ...@lists.wikimedia.org?subject=unsubscribe

Re: [Wikimedia-l] Quarterly reviews of high priority WMF initiatives

2014-10-02 Thread Tilman Bayer
Minutes and slides from Monday's quarterly review meeting of the
Foundation's Wikipedia Zero (Mobile Partnerships) team team are now
available at 
https://meta.wikimedia.org/wiki/WMF_Metrics_and_activities_meetings/Quarterly_reviews/Wikipedia_Zero/September_2014
.

On Wed, Dec 19, 2012 at 6:49 PM, Erik Moeller e...@wikimedia.org wrote:
 Hi folks,

 to increase accountability and create more opportunities for course
 corrections and resourcing adjustments as necessary, Sue's asked me
 and Howie Fung to set up a quarterly project evaluation process,
 starting with our highest priority initiatives. These are, according
 to Sue's narrowing focus recommendations which were approved by the
 Board [1]:

 - Visual Editor
 - Mobile (mobile contributions + Wikipedia Zero)
 - Editor Engagement (also known as the E2 and E3 teams)
 - Funds Dissemination Committe and expanded grant-making capacity

 I'm proposing the following initial schedule:

 January:
 - Editor Engagement Experiments

 February:
 - Visual Editor
 - Mobile (Contribs + Zero)

 March:
 - Editor Engagement Features (Echo, Flow projects)
 - Funds Dissemination Committee

 We’ll try doing this on the same day or adjacent to the monthly
 metrics meetings [2], since the team(s) will give a presentation on
 their recent progress, which will help set some context that would
 otherwise need to be covered in the quarterly review itself. This will
 also create open opportunities for feedback and questions.

 My goal is to do this in a manner where even though the quarterly
 review meetings themselves are internal, the outcomes are captured as
 meeting minutes and shared publicly, which is why I'm starting this
 discussion on a public list as well. I've created a wiki page here
 which we can use to discuss the concept further:

 https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews

 The internal review will, at minimum, include:

 Sue Gardner
 myself
 Howie Fung
 Team members and relevant director(s)
 Designated minute-taker

 So for example, for Visual Editor, the review team would be the Visual
 Editor / Parsoid teams, Sue, me, Howie, Terry, and a minute-taker.

 I imagine the structure of the review roughly as follows, with a
 duration of about 2 1/2 hours divided into 25-30 minute blocks:

 - Brief team intro and recap of team's activities through the quarter,
 compared with goals
 - Drill into goals and targets: Did we achieve what we said we would?
 - Review of challenges, blockers and successes
 - Discussion of proposed changes (e.g. resourcing, targets) and other
 action items
 - Buffer time, debriefing

 Once again, the primary purpose of these reviews is to create improved
 structures for internal accountability, escalation points in cases
 where serious changes are necessary, and transparency to the world.

 In addition to these priority initiatives, my recommendation would be
 to conduct quarterly reviews for any activity that requires more than
 a set amount of resources (people/dollars). These additional reviews
 may however be conducted in a more lightweight manner and internally
 to the departments. We’re slowly getting into that habit in
 engineering.

 As we pilot this process, the format of the high priority reviews can
 help inform and support reviews across the organization.

 Feedback and questions are appreciated.

 All best,
 Erik

 [1] https://wikimediafoundation.org/wiki/Vote:Narrowing_Focus
 [2] https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings
 --
 Erik Möller
 VP of Engineering and Product Development, Wikimedia Foundation

 Support Free Knowledge: https://wikimediafoundation.org/wiki/Donate

 ___
 Wikimedia-l mailing list
 Wikimedia-l@lists.wikimedia.org
 Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l



-- 
Tilman Bayer
Senior Operations Analyst (Movement Communications)
Wikimedia Foundation
IRC (Freenode): HaeB

___
Wikimedia-l mailing list, guidelines at: 
https://meta.wikimedia.org/wiki/Mailing_lists/Guidelines
Wikimedia-l@lists.wikimedia.org
Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l, 
mailto:wikimedia-l-requ...@lists.wikimedia.org?subject=unsubscribe

Re: [Wikimedia-l] Quarterly reviews of high priority WMF initiatives

2014-09-30 Thread Tilman Bayer
Minutes and slides from last week's quarterly review meeting of the
Foundation's Analytics team are now available at
https://meta.wikimedia.org/wiki/WMF_Metrics_and_activities_meetings/Quarterly_reviews/Analytics/September_2014
.

On Wed, Dec 19, 2012 at 6:49 PM, Erik Moeller e...@wikimedia.org wrote:
 Hi folks,

 to increase accountability and create more opportunities for course
 corrections and resourcing adjustments as necessary, Sue's asked me
 and Howie Fung to set up a quarterly project evaluation process,
 starting with our highest priority initiatives. These are, according
 to Sue's narrowing focus recommendations which were approved by the
 Board [1]:

 - Visual Editor
 - Mobile (mobile contributions + Wikipedia Zero)
 - Editor Engagement (also known as the E2 and E3 teams)
 - Funds Dissemination Committe and expanded grant-making capacity

 I'm proposing the following initial schedule:

 January:
 - Editor Engagement Experiments

 February:
 - Visual Editor
 - Mobile (Contribs + Zero)

 March:
 - Editor Engagement Features (Echo, Flow projects)
 - Funds Dissemination Committee

 We’ll try doing this on the same day or adjacent to the monthly
 metrics meetings [2], since the team(s) will give a presentation on
 their recent progress, which will help set some context that would
 otherwise need to be covered in the quarterly review itself. This will
 also create open opportunities for feedback and questions.

 My goal is to do this in a manner where even though the quarterly
 review meetings themselves are internal, the outcomes are captured as
 meeting minutes and shared publicly, which is why I'm starting this
 discussion on a public list as well. I've created a wiki page here
 which we can use to discuss the concept further:

 https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews

 The internal review will, at minimum, include:

 Sue Gardner
 myself
 Howie Fung
 Team members and relevant director(s)
 Designated minute-taker

 So for example, for Visual Editor, the review team would be the Visual
 Editor / Parsoid teams, Sue, me, Howie, Terry, and a minute-taker.

 I imagine the structure of the review roughly as follows, with a
 duration of about 2 1/2 hours divided into 25-30 minute blocks:

 - Brief team intro and recap of team's activities through the quarter,
 compared with goals
 - Drill into goals and targets: Did we achieve what we said we would?
 - Review of challenges, blockers and successes
 - Discussion of proposed changes (e.g. resourcing, targets) and other
 action items
 - Buffer time, debriefing

 Once again, the primary purpose of these reviews is to create improved
 structures for internal accountability, escalation points in cases
 where serious changes are necessary, and transparency to the world.

 In addition to these priority initiatives, my recommendation would be
 to conduct quarterly reviews for any activity that requires more than
 a set amount of resources (people/dollars). These additional reviews
 may however be conducted in a more lightweight manner and internally
 to the departments. We’re slowly getting into that habit in
 engineering.

 As we pilot this process, the format of the high priority reviews can
 help inform and support reviews across the organization.

 Feedback and questions are appreciated.

 All best,
 Erik

 [1] https://wikimediafoundation.org/wiki/Vote:Narrowing_Focus
 [2] https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings
 --
 Erik Möller
 VP of Engineering and Product Development, Wikimedia Foundation

 Support Free Knowledge: https://wikimediafoundation.org/wiki/Donate

 ___
 Wikimedia-l mailing list
 Wikimedia-l@lists.wikimedia.org
 Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l



-- 
Tilman Bayer
Senior Operations Analyst (Movement Communications)
Wikimedia Foundation
IRC (Freenode): HaeB

___
Wikimedia-l mailing list, guidelines at: 
https://meta.wikimedia.org/wiki/Mailing_lists/Guidelines
Wikimedia-l@lists.wikimedia.org
Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l, 
mailto:wikimedia-l-requ...@lists.wikimedia.org?subject=unsubscribe

Re: [Wikimedia-l] Quarterly reviews of high priority WMF initiatives

2014-09-30 Thread Tilman Bayer
Minutes and slides from last week's quarterly review meeting of the
Foundation's Mobile Contributions team are now available at
https://meta.wikimedia.org/wiki/WMF_Metrics_and_activities_meetings/Quarterly_reviews/Mobile_contributions/September_2014
.

On Wed, Dec 19, 2012 at 6:49 PM, Erik Moeller e...@wikimedia.org wrote:
 Hi folks,

 to increase accountability and create more opportunities for course
 corrections and resourcing adjustments as necessary, Sue's asked me
 and Howie Fung to set up a quarterly project evaluation process,
 starting with our highest priority initiatives. These are, according
 to Sue's narrowing focus recommendations which were approved by the
 Board [1]:

 - Visual Editor
 - Mobile (mobile contributions + Wikipedia Zero)
 - Editor Engagement (also known as the E2 and E3 teams)
 - Funds Dissemination Committe and expanded grant-making capacity

 I'm proposing the following initial schedule:

 January:
 - Editor Engagement Experiments

 February:
 - Visual Editor
 - Mobile (Contribs + Zero)

 March:
 - Editor Engagement Features (Echo, Flow projects)
 - Funds Dissemination Committee

 We’ll try doing this on the same day or adjacent to the monthly
 metrics meetings [2], since the team(s) will give a presentation on
 their recent progress, which will help set some context that would
 otherwise need to be covered in the quarterly review itself. This will
 also create open opportunities for feedback and questions.

 My goal is to do this in a manner where even though the quarterly
 review meetings themselves are internal, the outcomes are captured as
 meeting minutes and shared publicly, which is why I'm starting this
 discussion on a public list as well. I've created a wiki page here
 which we can use to discuss the concept further:

 https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews

 The internal review will, at minimum, include:

 Sue Gardner
 myself
 Howie Fung
 Team members and relevant director(s)
 Designated minute-taker

 So for example, for Visual Editor, the review team would be the Visual
 Editor / Parsoid teams, Sue, me, Howie, Terry, and a minute-taker.

 I imagine the structure of the review roughly as follows, with a
 duration of about 2 1/2 hours divided into 25-30 minute blocks:

 - Brief team intro and recap of team's activities through the quarter,
 compared with goals
 - Drill into goals and targets: Did we achieve what we said we would?
 - Review of challenges, blockers and successes
 - Discussion of proposed changes (e.g. resourcing, targets) and other
 action items
 - Buffer time, debriefing

 Once again, the primary purpose of these reviews is to create improved
 structures for internal accountability, escalation points in cases
 where serious changes are necessary, and transparency to the world.

 In addition to these priority initiatives, my recommendation would be
 to conduct quarterly reviews for any activity that requires more than
 a set amount of resources (people/dollars). These additional reviews
 may however be conducted in a more lightweight manner and internally
 to the departments. We’re slowly getting into that habit in
 engineering.

 As we pilot this process, the format of the high priority reviews can
 help inform and support reviews across the organization.

 Feedback and questions are appreciated.

 All best,
 Erik

 [1] https://wikimediafoundation.org/wiki/Vote:Narrowing_Focus
 [2] https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings
 --
 Erik Möller
 VP of Engineering and Product Development, Wikimedia Foundation

 Support Free Knowledge: https://wikimediafoundation.org/wiki/Donate

 ___
 Wikimedia-l mailing list
 Wikimedia-l@lists.wikimedia.org
 Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l



-- 
Tilman Bayer
Senior Operations Analyst (Movement Communications)
Wikimedia Foundation
IRC (Freenode): HaeB

___
Wikimedia-l mailing list, guidelines at: 
https://meta.wikimedia.org/wiki/Mailing_lists/Guidelines
Wikimedia-l@lists.wikimedia.org
Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l, 
mailto:wikimedia-l-requ...@lists.wikimedia.org?subject=unsubscribe

Re: [Wikimedia-l] Quarterly reviews of high priority WMF initiatives

2014-09-30 Thread Tilman Bayer
Minutes and slides from last week's mid-year review meeting of the
Foundation's Wikipedia Education Program team are now available at
https://meta.wikimedia.org/wiki/WMF_Metrics_and_activities_meetings/Quarterly_reviews/Wikipedia_Education_Program/September_2014
.

On Wed, Dec 19, 2012 at 6:49 PM, Erik Moeller e...@wikimedia.org wrote:
 Hi folks,

 to increase accountability and create more opportunities for course
 corrections and resourcing adjustments as necessary, Sue's asked me
 and Howie Fung to set up a quarterly project evaluation process,
 starting with our highest priority initiatives. These are, according
 to Sue's narrowing focus recommendations which were approved by the
 Board [1]:

 - Visual Editor
 - Mobile (mobile contributions + Wikipedia Zero)
 - Editor Engagement (also known as the E2 and E3 teams)
 - Funds Dissemination Committe and expanded grant-making capacity

 I'm proposing the following initial schedule:

 January:
 - Editor Engagement Experiments

 February:
 - Visual Editor
 - Mobile (Contribs + Zero)

 March:
 - Editor Engagement Features (Echo, Flow projects)
 - Funds Dissemination Committee

 We’ll try doing this on the same day or adjacent to the monthly
 metrics meetings [2], since the team(s) will give a presentation on
 their recent progress, which will help set some context that would
 otherwise need to be covered in the quarterly review itself. This will
 also create open opportunities for feedback and questions.

 My goal is to do this in a manner where even though the quarterly
 review meetings themselves are internal, the outcomes are captured as
 meeting minutes and shared publicly, which is why I'm starting this
 discussion on a public list as well. I've created a wiki page here
 which we can use to discuss the concept further:

 https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews

 The internal review will, at minimum, include:

 Sue Gardner
 myself
 Howie Fung
 Team members and relevant director(s)
 Designated minute-taker

 So for example, for Visual Editor, the review team would be the Visual
 Editor / Parsoid teams, Sue, me, Howie, Terry, and a minute-taker.

 I imagine the structure of the review roughly as follows, with a
 duration of about 2 1/2 hours divided into 25-30 minute blocks:

 - Brief team intro and recap of team's activities through the quarter,
 compared with goals
 - Drill into goals and targets: Did we achieve what we said we would?
 - Review of challenges, blockers and successes
 - Discussion of proposed changes (e.g. resourcing, targets) and other
 action items
 - Buffer time, debriefing

 Once again, the primary purpose of these reviews is to create improved
 structures for internal accountability, escalation points in cases
 where serious changes are necessary, and transparency to the world.

 In addition to these priority initiatives, my recommendation would be
 to conduct quarterly reviews for any activity that requires more than
 a set amount of resources (people/dollars). These additional reviews
 may however be conducted in a more lightweight manner and internally
 to the departments. We’re slowly getting into that habit in
 engineering.

 As we pilot this process, the format of the high priority reviews can
 help inform and support reviews across the organization.

 Feedback and questions are appreciated.

 All best,
 Erik

 [1] https://wikimediafoundation.org/wiki/Vote:Narrowing_Focus
 [2] https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings
 --
 Erik Möller
 VP of Engineering and Product Development, Wikimedia Foundation

 Support Free Knowledge: https://wikimediafoundation.org/wiki/Donate

 ___
 Wikimedia-l mailing list
 Wikimedia-l@lists.wikimedia.org
 Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l



-- 
Tilman Bayer
Senior Operations Analyst (Movement Communications)
Wikimedia Foundation
IRC (Freenode): HaeB

___
Wikimedia-l mailing list, guidelines at: 
https://meta.wikimedia.org/wiki/Mailing_lists/Guidelines
Wikimedia-l@lists.wikimedia.org
Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l, 
mailto:wikimedia-l-requ...@lists.wikimedia.org?subject=unsubscribe

Re: [Wikimedia-l] Quarterly reviews of high priority WMF initiatives

2014-09-20 Thread Tilman Bayer
Minutes and slides from Wednesday's quarterly review meeting of the
Foundation's Growth team are now available at
https://meta.wikimedia.org/wiki/WMF_Metrics_and_activities_meetings/Quarterly_reviews/Growth/September_2014
.

On Wed, Dec 19, 2012 at 6:49 PM, Erik Moeller e...@wikimedia.org wrote:
 Hi folks,

 to increase accountability and create more opportunities for course
 corrections and resourcing adjustments as necessary, Sue's asked me
 and Howie Fung to set up a quarterly project evaluation process,
 starting with our highest priority initiatives. These are, according
 to Sue's narrowing focus recommendations which were approved by the
 Board [1]:

 - Visual Editor
 - Mobile (mobile contributions + Wikipedia Zero)
 - Editor Engagement (also known as the E2 and E3 teams)
 - Funds Dissemination Committe and expanded grant-making capacity

 I'm proposing the following initial schedule:

 January:
 - Editor Engagement Experiments

 February:
 - Visual Editor
 - Mobile (Contribs + Zero)

 March:
 - Editor Engagement Features (Echo, Flow projects)
 - Funds Dissemination Committee

 We’ll try doing this on the same day or adjacent to the monthly
 metrics meetings [2], since the team(s) will give a presentation on
 their recent progress, which will help set some context that would
 otherwise need to be covered in the quarterly review itself. This will
 also create open opportunities for feedback and questions.

 My goal is to do this in a manner where even though the quarterly
 review meetings themselves are internal, the outcomes are captured as
 meeting minutes and shared publicly, which is why I'm starting this
 discussion on a public list as well. I've created a wiki page here
 which we can use to discuss the concept further:

 https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews

 The internal review will, at minimum, include:

 Sue Gardner
 myself
 Howie Fung
 Team members and relevant director(s)
 Designated minute-taker

 So for example, for Visual Editor, the review team would be the Visual
 Editor / Parsoid teams, Sue, me, Howie, Terry, and a minute-taker.

 I imagine the structure of the review roughly as follows, with a
 duration of about 2 1/2 hours divided into 25-30 minute blocks:

 - Brief team intro and recap of team's activities through the quarter,
 compared with goals
 - Drill into goals and targets: Did we achieve what we said we would?
 - Review of challenges, blockers and successes
 - Discussion of proposed changes (e.g. resourcing, targets) and other
 action items
 - Buffer time, debriefing

 Once again, the primary purpose of these reviews is to create improved
 structures for internal accountability, escalation points in cases
 where serious changes are necessary, and transparency to the world.

 In addition to these priority initiatives, my recommendation would be
 to conduct quarterly reviews for any activity that requires more than
 a set amount of resources (people/dollars). These additional reviews
 may however be conducted in a more lightweight manner and internally
 to the departments. We’re slowly getting into that habit in
 engineering.

 As we pilot this process, the format of the high priority reviews can
 help inform and support reviews across the organization.

 Feedback and questions are appreciated.

 All best,
 Erik

 [1] https://wikimediafoundation.org/wiki/Vote:Narrowing_Focus
 [2] https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings
 --
 Erik Möller
 VP of Engineering and Product Development, Wikimedia Foundation

 Support Free Knowledge: https://wikimediafoundation.org/wiki/Donate

 ___
 Wikimedia-l mailing list
 Wikimedia-l@lists.wikimedia.org
 Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l



-- 
Tilman Bayer
Senior Operations Analyst (Movement Communications)
Wikimedia Foundation
IRC (Freenode): HaeB

___
Wikimedia-l mailing list, guidelines at: 
https://meta.wikimedia.org/wiki/Mailing_lists/Guidelines
Wikimedia-l@lists.wikimedia.org
Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l, 
mailto:wikimedia-l-requ...@lists.wikimedia.org?subject=unsubscribe

Re: [Wikimedia-l] Quarterly reviews of high priority WMF initiatives

2014-09-16 Thread Tilman Bayer
Minutes and slides from the recent quarterly review of the
Foundation's Language Engineering team are available at
https://meta.wikimedia.org/wiki/WMF_Metrics_and_activities_meetings/Quarterly_reviews/Language_Engineering/September_2014
.

On Wed, Dec 19, 2012 at 6:49 PM, Erik Moeller e...@wikimedia.org wrote:

 Hi folks,

 to increase accountability and create more opportunities for course
 corrections and resourcing adjustments as necessary, Sue's asked me
 and Howie Fung to set up a quarterly project evaluation process,
 starting with our highest priority initiatives. These are, according
 to Sue's narrowing focus recommendations which were approved by the
 Board [1]:

 - Visual Editor
 - Mobile (mobile contributions + Wikipedia Zero)
 - Editor Engagement (also known as the E2 and E3 teams)
 - Funds Dissemination Committe and expanded grant-making capacity

 I'm proposing the following initial schedule:

 January:
 - Editor Engagement Experiments

 February:
 - Visual Editor
 - Mobile (Contribs + Zero)

 March:
 - Editor Engagement Features (Echo, Flow projects)
 - Funds Dissemination Committee

 We’ll try doing this on the same day or adjacent to the monthly
 metrics meetings [2], since the team(s) will give a presentation on
 their recent progress, which will help set some context that would
 otherwise need to be covered in the quarterly review itself. This will
 also create open opportunities for feedback and questions.

 My goal is to do this in a manner where even though the quarterly
 review meetings themselves are internal, the outcomes are captured as
 meeting minutes and shared publicly, which is why I'm starting this
 discussion on a public list as well. I've created a wiki page here
 which we can use to discuss the concept further:

 https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews

 The internal review will, at minimum, include:

 Sue Gardner
 myself
 Howie Fung
 Team members and relevant director(s)
 Designated minute-taker

 So for example, for Visual Editor, the review team would be the Visual
 Editor / Parsoid teams, Sue, me, Howie, Terry, and a minute-taker.

 I imagine the structure of the review roughly as follows, with a
 duration of about 2 1/2 hours divided into 25-30 minute blocks:

 - Brief team intro and recap of team's activities through the quarter,
 compared with goals
 - Drill into goals and targets: Did we achieve what we said we would?
 - Review of challenges, blockers and successes
 - Discussion of proposed changes (e.g. resourcing, targets) and other
 action items
 - Buffer time, debriefing

 Once again, the primary purpose of these reviews is to create improved
 structures for internal accountability, escalation points in cases
 where serious changes are necessary, and transparency to the world.

 In addition to these priority initiatives, my recommendation would be
 to conduct quarterly reviews for any activity that requires more than
 a set amount of resources (people/dollars). These additional reviews
 may however be conducted in a more lightweight manner and internally
 to the departments. We’re slowly getting into that habit in
 engineering.

 As we pilot this process, the format of the high priority reviews can
 help inform and support reviews across the organization.

 Feedback and questions are appreciated.

 All best,
 Erik

 [1] https://wikimediafoundation.org/wiki/Vote:Narrowing_Focus
 [2] https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings
 --
 Erik Möller
 VP of Engineering and Product Development, Wikimedia Foundation

 Support Free Knowledge: https://wikimediafoundation.org/wiki/Donate

 ___
 Wikimedia-l mailing list
 Wikimedia-l@lists.wikimedia.org
 Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l




-- 
Tilman Bayer
Senior Operations Analyst (Movement Communications)
Wikimedia Foundation
IRC (Freenode): HaeB

___
Wikimedia-l mailing list, guidelines at: 
https://meta.wikimedia.org/wiki/Mailing_lists/Guidelines
Wikimedia-l@lists.wikimedia.org
Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l, 
mailto:wikimedia-l-requ...@lists.wikimedia.org?subject=unsubscribe

Re: [Wikimedia-l] Quarterly reviews of high priority WMF initiatives

2014-09-11 Thread Tilman Bayer
Minutes and slides from last week's quarterly review of the
Foundation's Release Engineering and QA team are now available at
https://meta.wikimedia.org/wiki/WMF_Metrics_and_activities_meetings/Quarterly_reviews/Release_Engineering/September_2014
.

On Wed, Dec 19, 2012 at 6:49 PM, Erik Moeller e...@wikimedia.org wrote:
 Hi folks,

 to increase accountability and create more opportunities for course
 corrections and resourcing adjustments as necessary, Sue's asked me
 and Howie Fung to set up a quarterly project evaluation process,
 starting with our highest priority initiatives. These are, according
 to Sue's narrowing focus recommendations which were approved by the
 Board [1]:

 - Visual Editor
 - Mobile (mobile contributions + Wikipedia Zero)
 - Editor Engagement (also known as the E2 and E3 teams)
 - Funds Dissemination Committe and expanded grant-making capacity

 I'm proposing the following initial schedule:

 January:
 - Editor Engagement Experiments

 February:
 - Visual Editor
 - Mobile (Contribs + Zero)

 March:
 - Editor Engagement Features (Echo, Flow projects)
 - Funds Dissemination Committee

 We’ll try doing this on the same day or adjacent to the monthly
 metrics meetings [2], since the team(s) will give a presentation on
 their recent progress, which will help set some context that would
 otherwise need to be covered in the quarterly review itself. This will
 also create open opportunities for feedback and questions.

 My goal is to do this in a manner where even though the quarterly
 review meetings themselves are internal, the outcomes are captured as
 meeting minutes and shared publicly, which is why I'm starting this
 discussion on a public list as well. I've created a wiki page here
 which we can use to discuss the concept further:

 https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews

 The internal review will, at minimum, include:

 Sue Gardner
 myself
 Howie Fung
 Team members and relevant director(s)
 Designated minute-taker

 So for example, for Visual Editor, the review team would be the Visual
 Editor / Parsoid teams, Sue, me, Howie, Terry, and a minute-taker.

 I imagine the structure of the review roughly as follows, with a
 duration of about 2 1/2 hours divided into 25-30 minute blocks:

 - Brief team intro and recap of team's activities through the quarter,
 compared with goals
 - Drill into goals and targets: Did we achieve what we said we would?
 - Review of challenges, blockers and successes
 - Discussion of proposed changes (e.g. resourcing, targets) and other
 action items
 - Buffer time, debriefing

 Once again, the primary purpose of these reviews is to create improved
 structures for internal accountability, escalation points in cases
 where serious changes are necessary, and transparency to the world.

 In addition to these priority initiatives, my recommendation would be
 to conduct quarterly reviews for any activity that requires more than
 a set amount of resources (people/dollars). These additional reviews
 may however be conducted in a more lightweight manner and internally
 to the departments. We’re slowly getting into that habit in
 engineering.

 As we pilot this process, the format of the high priority reviews can
 help inform and support reviews across the organization.

 Feedback and questions are appreciated.

 All best,
 Erik

 [1] https://wikimediafoundation.org/wiki/Vote:Narrowing_Focus
 [2] https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings
 --
 Erik Möller
 VP of Engineering and Product Development, Wikimedia Foundation

 Support Free Knowledge: https://wikimediafoundation.org/wiki/Donate

 ___
 Wikimedia-l mailing list
 Wikimedia-l@lists.wikimedia.org
 Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l



-- 
Tilman Bayer
Senior Operations Analyst (Movement Communications)
Wikimedia Foundation
IRC (Freenode): HaeB

___
Wikimedia-l mailing list, guidelines at: 
https://meta.wikimedia.org/wiki/Mailing_lists/Guidelines
Wikimedia-l@lists.wikimedia.org
Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l, 
mailto:wikimedia-l-requ...@lists.wikimedia.org?subject=unsubscribe

Re: [Wikimedia-l] Quarterly reviews of high priority WMF initiatives

2014-07-18 Thread Tilman Bayer
Minutes and slides from Wednesday's quarterly review of the
Foundation's MediaWiki Core team are now available at
https://www.mediawiki.org/wiki/Wikimedia_MediaWiki_Core_Team/Quarterly_review,_July_2014/Notes

(agenda/overview page:
https://www.mediawiki.org/wiki/Wikimedia_MediaWiki_Core_Team/Quarterly_review,_July_2014
)

On Wed, Dec 19, 2012 at 6:49 PM, Erik Moeller e...@wikimedia.org wrote:
 Hi folks,

 to increase accountability and create more opportunities for course
 corrections and resourcing adjustments as necessary, Sue's asked me
 and Howie Fung to set up a quarterly project evaluation process,
 starting with our highest priority initiatives. These are, according
 to Sue's narrowing focus recommendations which were approved by the
 Board [1]:

 - Visual Editor
 - Mobile (mobile contributions + Wikipedia Zero)
 - Editor Engagement (also known as the E2 and E3 teams)
 - Funds Dissemination Committe and expanded grant-making capacity

 I'm proposing the following initial schedule:

 January:
 - Editor Engagement Experiments

 February:
 - Visual Editor
 - Mobile (Contribs + Zero)

 March:
 - Editor Engagement Features (Echo, Flow projects)
 - Funds Dissemination Committee

 We’ll try doing this on the same day or adjacent to the monthly
 metrics meetings [2], since the team(s) will give a presentation on
 their recent progress, which will help set some context that would
 otherwise need to be covered in the quarterly review itself. This will
 also create open opportunities for feedback and questions.

 My goal is to do this in a manner where even though the quarterly
 review meetings themselves are internal, the outcomes are captured as
 meeting minutes and shared publicly, which is why I'm starting this
 discussion on a public list as well. I've created a wiki page here
 which we can use to discuss the concept further:

 https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews

 The internal review will, at minimum, include:

 Sue Gardner
 myself
 Howie Fung
 Team members and relevant director(s)
 Designated minute-taker

 So for example, for Visual Editor, the review team would be the Visual
 Editor / Parsoid teams, Sue, me, Howie, Terry, and a minute-taker.

 I imagine the structure of the review roughly as follows, with a
 duration of about 2 1/2 hours divided into 25-30 minute blocks:

 - Brief team intro and recap of team's activities through the quarter,
 compared with goals
 - Drill into goals and targets: Did we achieve what we said we would?
 - Review of challenges, blockers and successes
 - Discussion of proposed changes (e.g. resourcing, targets) and other
 action items
 - Buffer time, debriefing

 Once again, the primary purpose of these reviews is to create improved
 structures for internal accountability, escalation points in cases
 where serious changes are necessary, and transparency to the world.

 In addition to these priority initiatives, my recommendation would be
 to conduct quarterly reviews for any activity that requires more than
 a set amount of resources (people/dollars). These additional reviews
 may however be conducted in a more lightweight manner and internally
 to the departments. We’re slowly getting into that habit in
 engineering.

 As we pilot this process, the format of the high priority reviews can
 help inform and support reviews across the organization.

 Feedback and questions are appreciated.

 All best,
 Erik

 [1] https://wikimediafoundation.org/wiki/Vote:Narrowing_Focus
 [2] https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings
 --
 Erik Möller
 VP of Engineering and Product Development, Wikimedia Foundation

 Support Free Knowledge: https://wikimediafoundation.org/wiki/Donate

 ___
 Wikimedia-l mailing list
 Wikimedia-l@lists.wikimedia.org
 Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l



-- 
Tilman Bayer
Senior Operations Analyst (Movement Communications)
Wikimedia Foundation
IRC (Freenode): HaeB

___
Wikimedia-l mailing list, guidelines at: 
https://meta.wikimedia.org/wiki/Mailing_lists/Guidelines
Wikimedia-l@lists.wikimedia.org
Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l, 
mailto:wikimedia-l-requ...@lists.wikimedia.org?subject=unsubscribe

Re: [Wikimedia-l] Quarterly reviews of high priority WMF initiatives

2014-07-12 Thread Tilman Bayer
Minutes and slides from Wednesday's quarterly review of the Foundation's
Core features team (focusing on the work on Flow) are now available at
https://meta.wikimedia.org/wiki/WMF_Metrics_and_activities_meetings/Quarterly_reviews/Core_features/July_2014
.


On Wed, Dec 19, 2012 at 6:49 PM, Erik Moeller e...@wikimedia.org wrote:

 Hi folks,

 to increase accountability and create more opportunities for course
 corrections and resourcing adjustments as necessary, Sue's asked me
 and Howie Fung to set up a quarterly project evaluation process,
 starting with our highest priority initiatives. These are, according
 to Sue's narrowing focus recommendations which were approved by the
 Board [1]:

 - Visual Editor
 - Mobile (mobile contributions + Wikipedia Zero)
 - Editor Engagement (also known as the E2 and E3 teams)
 - Funds Dissemination Committe and expanded grant-making capacity

 I'm proposing the following initial schedule:

 January:
 - Editor Engagement Experiments

 February:
 - Visual Editor
 - Mobile (Contribs + Zero)

 March:
 - Editor Engagement Features (Echo, Flow projects)
 - Funds Dissemination Committee

 We’ll try doing this on the same day or adjacent to the monthly
 metrics meetings [2], since the team(s) will give a presentation on
 their recent progress, which will help set some context that would
 otherwise need to be covered in the quarterly review itself. This will
 also create open opportunities for feedback and questions.

 My goal is to do this in a manner where even though the quarterly
 review meetings themselves are internal, the outcomes are captured as
 meeting minutes and shared publicly, which is why I'm starting this
 discussion on a public list as well. I've created a wiki page here
 which we can use to discuss the concept further:


 https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews

 The internal review will, at minimum, include:

 Sue Gardner
 myself
 Howie Fung
 Team members and relevant director(s)
 Designated minute-taker

 So for example, for Visual Editor, the review team would be the Visual
 Editor / Parsoid teams, Sue, me, Howie, Terry, and a minute-taker.

 I imagine the structure of the review roughly as follows, with a
 duration of about 2 1/2 hours divided into 25-30 minute blocks:

 - Brief team intro and recap of team's activities through the quarter,
 compared with goals
 - Drill into goals and targets: Did we achieve what we said we would?
 - Review of challenges, blockers and successes
 - Discussion of proposed changes (e.g. resourcing, targets) and other
 action items
 - Buffer time, debriefing

 Once again, the primary purpose of these reviews is to create improved
 structures for internal accountability, escalation points in cases
 where serious changes are necessary, and transparency to the world.

 In addition to these priority initiatives, my recommendation would be
 to conduct quarterly reviews for any activity that requires more than
 a set amount of resources (people/dollars). These additional reviews
 may however be conducted in a more lightweight manner and internally
 to the departments. We’re slowly getting into that habit in
 engineering.

 As we pilot this process, the format of the high priority reviews can
 help inform and support reviews across the organization.

 Feedback and questions are appreciated.

 All best,
 Erik

 [1] https://wikimediafoundation.org/wiki/Vote:Narrowing_Focus
 [2] https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings
 --
 Erik Möller
 VP of Engineering and Product Development, Wikimedia Foundation

 Support Free Knowledge: https://wikimediafoundation.org/wiki/Donate

 ___
 Wikimedia-l mailing list
 Wikimedia-l@lists.wikimedia.org
 Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l




-- 
Tilman Bayer
Senior Operations Analyst (Movement Communications)
Wikimedia Foundation
IRC (Freenode): HaeB
___
Wikimedia-l mailing list, guidelines at: 
https://meta.wikimedia.org/wiki/Mailing_lists/Guidelines
Wikimedia-l@lists.wikimedia.org
Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l, 
mailto:wikimedia-l-requ...@lists.wikimedia.org?subject=unsubscribe

Re: [Wikimedia-l] Quarterly reviews of high priority WMF initiatives

2014-07-11 Thread Tilman Bayer
Minutes and slides from Wednesday's quarterly review of the Foundation's
Wikipedia Zero (Mobile Partnerships) team are now available at
https://meta.wikimedia.org/wiki/WMF_Metrics_and_activities_meetings/Quarterly_reviews/Wikipedia_Zero/July_2014
 .


On Wed, Dec 19, 2012 at 6:49 PM, Erik Moeller e...@wikimedia.org wrote:

 Hi folks,

 to increase accountability and create more opportunities for course
 corrections and resourcing adjustments as necessary, Sue's asked me
 and Howie Fung to set up a quarterly project evaluation process,
 starting with our highest priority initiatives. These are, according
 to Sue's narrowing focus recommendations which were approved by the
 Board [1]:

 - Visual Editor
 - Mobile (mobile contributions + Wikipedia Zero)
 - Editor Engagement (also known as the E2 and E3 teams)
 - Funds Dissemination Committe and expanded grant-making capacity

 I'm proposing the following initial schedule:

 January:
 - Editor Engagement Experiments

 February:
 - Visual Editor
 - Mobile (Contribs + Zero)

 March:
 - Editor Engagement Features (Echo, Flow projects)
 - Funds Dissemination Committee

 We’ll try doing this on the same day or adjacent to the monthly
 metrics meetings [2], since the team(s) will give a presentation on
 their recent progress, which will help set some context that would
 otherwise need to be covered in the quarterly review itself. This will
 also create open opportunities for feedback and questions.

 My goal is to do this in a manner where even though the quarterly
 review meetings themselves are internal, the outcomes are captured as
 meeting minutes and shared publicly, which is why I'm starting this
 discussion on a public list as well. I've created a wiki page here
 which we can use to discuss the concept further:


 https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews

 The internal review will, at minimum, include:

 Sue Gardner
 myself
 Howie Fung
 Team members and relevant director(s)
 Designated minute-taker

 So for example, for Visual Editor, the review team would be the Visual
 Editor / Parsoid teams, Sue, me, Howie, Terry, and a minute-taker.

 I imagine the structure of the review roughly as follows, with a
 duration of about 2 1/2 hours divided into 25-30 minute blocks:

 - Brief team intro and recap of team's activities through the quarter,
 compared with goals
 - Drill into goals and targets: Did we achieve what we said we would?
 - Review of challenges, blockers and successes
 - Discussion of proposed changes (e.g. resourcing, targets) and other
 action items
 - Buffer time, debriefing

 Once again, the primary purpose of these reviews is to create improved
 structures for internal accountability, escalation points in cases
 where serious changes are necessary, and transparency to the world.

 In addition to these priority initiatives, my recommendation would be
 to conduct quarterly reviews for any activity that requires more than
 a set amount of resources (people/dollars). These additional reviews
 may however be conducted in a more lightweight manner and internally
 to the departments. We’re slowly getting into that habit in
 engineering.

 As we pilot this process, the format of the high priority reviews can
 help inform and support reviews across the organization.

 Feedback and questions are appreciated.

 All best,
 Erik

 [1] https://wikimediafoundation.org/wiki/Vote:Narrowing_Focus
 [2] https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings
 --
 Erik Möller
 VP of Engineering and Product Development, Wikimedia Foundation

 Support Free Knowledge: https://wikimediafoundation.org/wiki/Donate

 ___
 Wikimedia-l mailing list
 Wikimedia-l@lists.wikimedia.org
 Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l




-- 
Tilman Bayer
Senior Operations Analyst (Movement Communications)
Wikimedia Foundation
IRC (Freenode): HaeB
___
Wikimedia-l mailing list, guidelines at: 
https://meta.wikimedia.org/wiki/Mailing_lists/Guidelines
Wikimedia-l@lists.wikimedia.org
Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l, 
mailto:wikimedia-l-requ...@lists.wikimedia.org?subject=unsubscribe

Re: [Wikimedia-l] Quarterly reviews of high priority WMF initiatives

2014-06-27 Thread Tilman Bayer
Minutes and slides from Monday's quarterly review of the Foundation's
Analytics team are now available at
https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews/Analytics/June_2014
.

On Wed, Dec 19, 2012 at 6:49 PM, Erik Moeller e...@wikimedia.org wrote:
 Hi folks,

 to increase accountability and create more opportunities for course
 corrections and resourcing adjustments as necessary, Sue's asked me
 and Howie Fung to set up a quarterly project evaluation process,
 starting with our highest priority initiatives. These are, according
 to Sue's narrowing focus recommendations which were approved by the
 Board [1]:

 - Visual Editor
 - Mobile (mobile contributions + Wikipedia Zero)
 - Editor Engagement (also known as the E2 and E3 teams)
 - Funds Dissemination Committe and expanded grant-making capacity

 I'm proposing the following initial schedule:

 January:
 - Editor Engagement Experiments

 February:
 - Visual Editor
 - Mobile (Contribs + Zero)

 March:
 - Editor Engagement Features (Echo, Flow projects)
 - Funds Dissemination Committee

 We’ll try doing this on the same day or adjacent to the monthly
 metrics meetings [2], since the team(s) will give a presentation on
 their recent progress, which will help set some context that would
 otherwise need to be covered in the quarterly review itself. This will
 also create open opportunities for feedback and questions.

 My goal is to do this in a manner where even though the quarterly
 review meetings themselves are internal, the outcomes are captured as
 meeting minutes and shared publicly, which is why I'm starting this
 discussion on a public list as well. I've created a wiki page here
 which we can use to discuss the concept further:

 https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews

 The internal review will, at minimum, include:

 Sue Gardner
 myself
 Howie Fung
 Team members and relevant director(s)
 Designated minute-taker

 So for example, for Visual Editor, the review team would be the Visual
 Editor / Parsoid teams, Sue, me, Howie, Terry, and a minute-taker.

 I imagine the structure of the review roughly as follows, with a
 duration of about 2 1/2 hours divided into 25-30 minute blocks:

 - Brief team intro and recap of team's activities through the quarter,
 compared with goals
 - Drill into goals and targets: Did we achieve what we said we would?
 - Review of challenges, blockers and successes
 - Discussion of proposed changes (e.g. resourcing, targets) and other
 action items
 - Buffer time, debriefing

 Once again, the primary purpose of these reviews is to create improved
 structures for internal accountability, escalation points in cases
 where serious changes are necessary, and transparency to the world.

 In addition to these priority initiatives, my recommendation would be
 to conduct quarterly reviews for any activity that requires more than
 a set amount of resources (people/dollars). These additional reviews
 may however be conducted in a more lightweight manner and internally
 to the departments. We’re slowly getting into that habit in
 engineering.

 As we pilot this process, the format of the high priority reviews can
 help inform and support reviews across the organization.

 Feedback and questions are appreciated.

 All best,
 Erik

 [1] https://wikimediafoundation.org/wiki/Vote:Narrowing_Focus
 [2] https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings
 --
 Erik Möller
 VP of Engineering and Product Development, Wikimedia Foundation

 Support Free Knowledge: https://wikimediafoundation.org/wiki/Donate

 ___
 Wikimedia-l mailing list
 Wikimedia-l@lists.wikimedia.org
 Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l



-- 
Tilman Bayer
Senior Operations Analyst (Movement Communications)
Wikimedia Foundation
IRC (Freenode): HaeB

___
Wikimedia-l mailing list, guidelines at: 
https://meta.wikimedia.org/wiki/Mailing_lists/Guidelines
Wikimedia-l@lists.wikimedia.org
Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l, 
mailto:wikimedia-l-requ...@lists.wikimedia.org?subject=unsubscribe

Re: [Wikimedia-l] Quarterly reviews of high priority WMF initiatives

2014-06-25 Thread Tilman Bayer
Minutes and slides from last Friday's quarterly review of the
Foundation's Parsoid team are now available at
https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews/Parsoid/June_2014
.

On Wed, Dec 19, 2012 at 6:49 PM, Erik Moeller e...@wikimedia.org wrote:
 Hi folks,

 to increase accountability and create more opportunities for course
 corrections and resourcing adjustments as necessary, Sue's asked me
 and Howie Fung to set up a quarterly project evaluation process,
 starting with our highest priority initiatives. These are, according
 to Sue's narrowing focus recommendations which were approved by the
 Board [1]:

 - Visual Editor
 - Mobile (mobile contributions + Wikipedia Zero)
 - Editor Engagement (also known as the E2 and E3 teams)
 - Funds Dissemination Committe and expanded grant-making capacity

 I'm proposing the following initial schedule:

 January:
 - Editor Engagement Experiments

 February:
 - Visual Editor
 - Mobile (Contribs + Zero)

 March:
 - Editor Engagement Features (Echo, Flow projects)
 - Funds Dissemination Committee

 We’ll try doing this on the same day or adjacent to the monthly
 metrics meetings [2], since the team(s) will give a presentation on
 their recent progress, which will help set some context that would
 otherwise need to be covered in the quarterly review itself. This will
 also create open opportunities for feedback and questions.

 My goal is to do this in a manner where even though the quarterly
 review meetings themselves are internal, the outcomes are captured as
 meeting minutes and shared publicly, which is why I'm starting this
 discussion on a public list as well. I've created a wiki page here
 which we can use to discuss the concept further:

 https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews

 The internal review will, at minimum, include:

 Sue Gardner
 myself
 Howie Fung
 Team members and relevant director(s)
 Designated minute-taker

 So for example, for Visual Editor, the review team would be the Visual
 Editor / Parsoid teams, Sue, me, Howie, Terry, and a minute-taker.

 I imagine the structure of the review roughly as follows, with a
 duration of about 2 1/2 hours divided into 25-30 minute blocks:

 - Brief team intro and recap of team's activities through the quarter,
 compared with goals
 - Drill into goals and targets: Did we achieve what we said we would?
 - Review of challenges, blockers and successes
 - Discussion of proposed changes (e.g. resourcing, targets) and other
 action items
 - Buffer time, debriefing

 Once again, the primary purpose of these reviews is to create improved
 structures for internal accountability, escalation points in cases
 where serious changes are necessary, and transparency to the world.

 In addition to these priority initiatives, my recommendation would be
 to conduct quarterly reviews for any activity that requires more than
 a set amount of resources (people/dollars). These additional reviews
 may however be conducted in a more lightweight manner and internally
 to the departments. We’re slowly getting into that habit in
 engineering.

 As we pilot this process, the format of the high priority reviews can
 help inform and support reviews across the organization.

 Feedback and questions are appreciated.

 All best,
 Erik

 [1] https://wikimediafoundation.org/wiki/Vote:Narrowing_Focus
 [2] https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings
 --
 Erik Möller
 VP of Engineering and Product Development, Wikimedia Foundation

 Support Free Knowledge: https://wikimediafoundation.org/wiki/Donate

 ___
 Wikimedia-l mailing list
 Wikimedia-l@lists.wikimedia.org
 Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l



-- 
Tilman Bayer
Senior Operations Analyst (Movement Communications)
Wikimedia Foundation
IRC (Freenode): HaeB

___
Wikimedia-l mailing list, guidelines at: 
https://meta.wikimedia.org/wiki/Mailing_lists/Guidelines
Wikimedia-l@lists.wikimedia.org
Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l, 
mailto:wikimedia-l-requ...@lists.wikimedia.org?subject=unsubscribe

Re: [Wikimedia-l] Quarterly reviews of high priority WMF initiatives

2014-06-14 Thread Tilman Bayer
Minutes and slides from Wednesday's quarterly review meeting of the
Foundation's Growth (formerly E3) team are now available at
https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews/Growth/June_2014
.

On Wed, Dec 19, 2012 at 6:49 PM, Erik Moeller e...@wikimedia.org wrote:
 Hi folks,

 to increase accountability and create more opportunities for course
 corrections and resourcing adjustments as necessary, Sue's asked me
 and Howie Fung to set up a quarterly project evaluation process,
 starting with our highest priority initiatives. These are, according
 to Sue's narrowing focus recommendations which were approved by the
 Board [1]:

 - Visual Editor
 - Mobile (mobile contributions + Wikipedia Zero)
 - Editor Engagement (also known as the E2 and E3 teams)
 - Funds Dissemination Committe and expanded grant-making capacity

 I'm proposing the following initial schedule:

 January:
 - Editor Engagement Experiments

 February:
 - Visual Editor
 - Mobile (Contribs + Zero)

 March:
 - Editor Engagement Features (Echo, Flow projects)
 - Funds Dissemination Committee

 We’ll try doing this on the same day or adjacent to the monthly
 metrics meetings [2], since the team(s) will give a presentation on
 their recent progress, which will help set some context that would
 otherwise need to be covered in the quarterly review itself. This will
 also create open opportunities for feedback and questions.

 My goal is to do this in a manner where even though the quarterly
 review meetings themselves are internal, the outcomes are captured as
 meeting minutes and shared publicly, which is why I'm starting this
 discussion on a public list as well. I've created a wiki page here
 which we can use to discuss the concept further:

 https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews

 The internal review will, at minimum, include:

 Sue Gardner
 myself
 Howie Fung
 Team members and relevant director(s)
 Designated minute-taker

 So for example, for Visual Editor, the review team would be the Visual
 Editor / Parsoid teams, Sue, me, Howie, Terry, and a minute-taker.

 I imagine the structure of the review roughly as follows, with a
 duration of about 2 1/2 hours divided into 25-30 minute blocks:

 - Brief team intro and recap of team's activities through the quarter,
 compared with goals
 - Drill into goals and targets: Did we achieve what we said we would?
 - Review of challenges, blockers and successes
 - Discussion of proposed changes (e.g. resourcing, targets) and other
 action items
 - Buffer time, debriefing

 Once again, the primary purpose of these reviews is to create improved
 structures for internal accountability, escalation points in cases
 where serious changes are necessary, and transparency to the world.

 In addition to these priority initiatives, my recommendation would be
 to conduct quarterly reviews for any activity that requires more than
 a set amount of resources (people/dollars). These additional reviews
 may however be conducted in a more lightweight manner and internally
 to the departments. We’re slowly getting into that habit in
 engineering.

 As we pilot this process, the format of the high priority reviews can
 help inform and support reviews across the organization.

 Feedback and questions are appreciated.

 All best,
 Erik

 [1] https://wikimediafoundation.org/wiki/Vote:Narrowing_Focus
 [2] https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings
 --
 Erik Möller
 VP of Engineering and Product Development, Wikimedia Foundation

 Support Free Knowledge: https://wikimediafoundation.org/wiki/Donate

 ___
 Wikimedia-l mailing list
 Wikimedia-l@lists.wikimedia.org
 Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l



-- 
Tilman Bayer
Senior Operations Analyst (Movement Communications)
Wikimedia Foundation
IRC (Freenode): HaeB

___
Wikimedia-l mailing list, guidelines at: 
https://meta.wikimedia.org/wiki/Mailing_lists/Guidelines
Wikimedia-l@lists.wikimedia.org
Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l, 
mailto:wikimedia-l-requ...@lists.wikimedia.org?subject=unsubscribe

Re: [Wikimedia-l] Quarterly reviews of high priority WMF initiatives

2014-06-04 Thread Bence Damokos
Thanks for sharing, Tilman!
(These are really useful pages, and nice to see them continue to be
maintained).

Best regards,
Bence


On Tue, Jun 3, 2014 at 11:39 PM, Tilman Bayer tba...@wikimedia.org wrote:

 Minutes and slides from last week's quarterly review of the
 Foundation's Mobile Contributions team are now available at

 https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews/Mobile_contributions/May_2014
 .

 On Wed, Dec 19, 2012 at 6:49 PM, Erik Moeller e...@wikimedia.org wrote:
  Hi folks,
 
  to increase accountability and create more opportunities for course
  corrections and resourcing adjustments as necessary, Sue's asked me
  and Howie Fung to set up a quarterly project evaluation process,
  starting with our highest priority initiatives. These are, according
  to Sue's narrowing focus recommendations which were approved by the
  Board [1]:
 
  - Visual Editor
  - Mobile (mobile contributions + Wikipedia Zero)
  - Editor Engagement (also known as the E2 and E3 teams)
  - Funds Dissemination Committe and expanded grant-making capacity
 
  I'm proposing the following initial schedule:
 
  January:
  - Editor Engagement Experiments
 
  February:
  - Visual Editor
  - Mobile (Contribs + Zero)
 
  March:
  - Editor Engagement Features (Echo, Flow projects)
  - Funds Dissemination Committee
 
  We’ll try doing this on the same day or adjacent to the monthly
  metrics meetings [2], since the team(s) will give a presentation on
  their recent progress, which will help set some context that would
  otherwise need to be covered in the quarterly review itself. This will
  also create open opportunities for feedback and questions.
 
  My goal is to do this in a manner where even though the quarterly
  review meetings themselves are internal, the outcomes are captured as
  meeting minutes and shared publicly, which is why I'm starting this
  discussion on a public list as well. I've created a wiki page here
  which we can use to discuss the concept further:
 
 
 https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews
 
  The internal review will, at minimum, include:
 
  Sue Gardner
  myself
  Howie Fung
  Team members and relevant director(s)
  Designated minute-taker
 
  So for example, for Visual Editor, the review team would be the Visual
  Editor / Parsoid teams, Sue, me, Howie, Terry, and a minute-taker.
 
  I imagine the structure of the review roughly as follows, with a
  duration of about 2 1/2 hours divided into 25-30 minute blocks:
 
  - Brief team intro and recap of team's activities through the quarter,
  compared with goals
  - Drill into goals and targets: Did we achieve what we said we would?
  - Review of challenges, blockers and successes
  - Discussion of proposed changes (e.g. resourcing, targets) and other
  action items
  - Buffer time, debriefing
 
  Once again, the primary purpose of these reviews is to create improved
  structures for internal accountability, escalation points in cases
  where serious changes are necessary, and transparency to the world.
 
  In addition to these priority initiatives, my recommendation would be
  to conduct quarterly reviews for any activity that requires more than
  a set amount of resources (people/dollars). These additional reviews
  may however be conducted in a more lightweight manner and internally
  to the departments. We’re slowly getting into that habit in
  engineering.
 
  As we pilot this process, the format of the high priority reviews can
  help inform and support reviews across the organization.
 
  Feedback and questions are appreciated.
 
  All best,
  Erik
 
  [1] https://wikimediafoundation.org/wiki/Vote:Narrowing_Focus
  [2] https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings
  --
  Erik Möller
  VP of Engineering and Product Development, Wikimedia Foundation
 
  Support Free Knowledge: https://wikimediafoundation.org/wiki/Donate
 
  ___
  Wikimedia-l mailing list
  Wikimedia-l@lists.wikimedia.org
  Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l



 --
 Tilman Bayer
 Senior Operations Analyst (Movement Communications)
 Wikimedia Foundation
 IRC (Freenode): HaeB

 ___
 Wikimedia-l mailing list, guidelines at:
 https://meta.wikimedia.org/wiki/Mailing_lists/Guidelines
 Wikimedia-l@lists.wikimedia.org
 Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l,
 mailto:wikimedia-l-requ...@lists.wikimedia.org?subject=unsubscribe

___
Wikimedia-l mailing list, guidelines at: 
https://meta.wikimedia.org/wiki/Mailing_lists/Guidelines
Wikimedia-l@lists.wikimedia.org
Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l, 
mailto:wikimedia-l-requ...@lists.wikimedia.org?subject=unsubscribe

Re: [Wikimedia-l] Quarterly reviews of high priority WMF initiatives

2014-06-04 Thread Samuel Klein
+1.  These are an amazing resource for understanding what's happening.
Thanks to Tilman and the teams who put these together.

Is there any thought of making metrics updates more machine-readable,
exposing data/metrics/timelines?  Right now the excellent data is
flattened into slides, and then further flattened into a single pdf.

On Wed, Jun 4, 2014 at 7:53 AM, Bence Damokos bdamo...@gmail.com wrote:
 Thanks for sharing, Tilman!
 (These are really useful pages, and nice to see them continue to be
 maintained).

 Best regards,
 Bence


 On Tue, Jun 3, 2014 at 11:39 PM, Tilman Bayer tba...@wikimedia.org wrote:

 Minutes and slides from last week's quarterly review of the
 Foundation's Mobile Contributions team are now available at

 https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews/Mobile_contributions/May_2014
 .

 On Wed, Dec 19, 2012 at 6:49 PM, Erik Moeller e...@wikimedia.org wrote:
  Hi folks,
 
  to increase accountability and create more opportunities for course
  corrections and resourcing adjustments as necessary, Sue's asked me
  and Howie Fung to set up a quarterly project evaluation process,
  starting with our highest priority initiatives. These are, according
  to Sue's narrowing focus recommendations which were approved by the
  Board [1]:
 
  - Visual Editor
  - Mobile (mobile contributions + Wikipedia Zero)
  - Editor Engagement (also known as the E2 and E3 teams)
  - Funds Dissemination Committe and expanded grant-making capacity
 
  I'm proposing the following initial schedule:
 
  January:
  - Editor Engagement Experiments
 
  February:
  - Visual Editor
  - Mobile (Contribs + Zero)
 
  March:
  - Editor Engagement Features (Echo, Flow projects)
  - Funds Dissemination Committee
 
  We’ll try doing this on the same day or adjacent to the monthly
  metrics meetings [2], since the team(s) will give a presentation on
  their recent progress, which will help set some context that would
  otherwise need to be covered in the quarterly review itself. This will
  also create open opportunities for feedback and questions.
 
  My goal is to do this in a manner where even though the quarterly
  review meetings themselves are internal, the outcomes are captured as
  meeting minutes and shared publicly, which is why I'm starting this
  discussion on a public list as well. I've created a wiki page here
  which we can use to discuss the concept further:
 
 
 https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews
 
  The internal review will, at minimum, include:
 
  Sue Gardner
  myself
  Howie Fung
  Team members and relevant director(s)
  Designated minute-taker
 
  So for example, for Visual Editor, the review team would be the Visual
  Editor / Parsoid teams, Sue, me, Howie, Terry, and a minute-taker.
 
  I imagine the structure of the review roughly as follows, with a
  duration of about 2 1/2 hours divided into 25-30 minute blocks:
 
  - Brief team intro and recap of team's activities through the quarter,
  compared with goals
  - Drill into goals and targets: Did we achieve what we said we would?
  - Review of challenges, blockers and successes
  - Discussion of proposed changes (e.g. resourcing, targets) and other
  action items
  - Buffer time, debriefing
 
  Once again, the primary purpose of these reviews is to create improved
  structures for internal accountability, escalation points in cases
  where serious changes are necessary, and transparency to the world.
 
  In addition to these priority initiatives, my recommendation would be
  to conduct quarterly reviews for any activity that requires more than
  a set amount of resources (people/dollars). These additional reviews
  may however be conducted in a more lightweight manner and internally
  to the departments. We’re slowly getting into that habit in
  engineering.
 
  As we pilot this process, the format of the high priority reviews can
  help inform and support reviews across the organization.
 
  Feedback and questions are appreciated.
 
  All best,
  Erik
 
  [1] https://wikimediafoundation.org/wiki/Vote:Narrowing_Focus
  [2] https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings
  --
  Erik Möller
  VP of Engineering and Product Development, Wikimedia Foundation
 
  Support Free Knowledge: https://wikimediafoundation.org/wiki/Donate
 
  ___
  Wikimedia-l mailing list
  Wikimedia-l@lists.wikimedia.org
  Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l



 --
 Tilman Bayer
 Senior Operations Analyst (Movement Communications)
 Wikimedia Foundation
 IRC (Freenode): HaeB

 ___
 Wikimedia-l mailing list, guidelines at:
 https://meta.wikimedia.org/wiki/Mailing_lists/Guidelines
 Wikimedia-l@lists.wikimedia.org
 Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l,
 mailto:wikimedia-l-requ...@lists.wikimedia.org?subject=unsubscribe

 

Re: [Wikimedia-l] Quarterly reviews of high priority WMF initiatives

2014-06-04 Thread Steven Walling
On Wed, Jun 4, 2014 at 8:37 AM, Samuel Klein meta...@gmail.com wrote:

 Is there any thought of making metrics updates more machine-readable,
 exposing data/metrics/timelines?  Right now the excellent data is
 flattened into slides, and then further flattened into a single pdf.


If anyone is seeking more data on the project-wide or feature-related
metrics we typically discuss, there are several tools available. Other than
the Report Card [1] and stats.wikimedia.org, probably the best resource is
our extensive list of dashboards on Meta.[2] Those provide a lot of
structured data over time. The format for the Reviews are slides since the
primary intended audience of the Quarterly Reviews is still
internal-facing.

Steven

1. http://reportcard.wmflabs.org/
2. https://meta.wikimedia.org/wiki/Research:Data/Dashboards
___
Wikimedia-l mailing list, guidelines at: 
https://meta.wikimedia.org/wiki/Mailing_lists/Guidelines
Wikimedia-l@lists.wikimedia.org
Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l, 
mailto:wikimedia-l-requ...@lists.wikimedia.org?subject=unsubscribe

Re: [Wikimedia-l] Quarterly reviews of high priority WMF initiatives

2014-06-03 Thread Tilman Bayer
Minutes and slides from last week's quarterly review of the
Foundation's Mobile Contributions team are now available at
https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews/Mobile_contributions/May_2014
.

On Wed, Dec 19, 2012 at 6:49 PM, Erik Moeller e...@wikimedia.org wrote:
 Hi folks,

 to increase accountability and create more opportunities for course
 corrections and resourcing adjustments as necessary, Sue's asked me
 and Howie Fung to set up a quarterly project evaluation process,
 starting with our highest priority initiatives. These are, according
 to Sue's narrowing focus recommendations which were approved by the
 Board [1]:

 - Visual Editor
 - Mobile (mobile contributions + Wikipedia Zero)
 - Editor Engagement (also known as the E2 and E3 teams)
 - Funds Dissemination Committe and expanded grant-making capacity

 I'm proposing the following initial schedule:

 January:
 - Editor Engagement Experiments

 February:
 - Visual Editor
 - Mobile (Contribs + Zero)

 March:
 - Editor Engagement Features (Echo, Flow projects)
 - Funds Dissemination Committee

 We’ll try doing this on the same day or adjacent to the monthly
 metrics meetings [2], since the team(s) will give a presentation on
 their recent progress, which will help set some context that would
 otherwise need to be covered in the quarterly review itself. This will
 also create open opportunities for feedback and questions.

 My goal is to do this in a manner where even though the quarterly
 review meetings themselves are internal, the outcomes are captured as
 meeting minutes and shared publicly, which is why I'm starting this
 discussion on a public list as well. I've created a wiki page here
 which we can use to discuss the concept further:

 https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews

 The internal review will, at minimum, include:

 Sue Gardner
 myself
 Howie Fung
 Team members and relevant director(s)
 Designated minute-taker

 So for example, for Visual Editor, the review team would be the Visual
 Editor / Parsoid teams, Sue, me, Howie, Terry, and a minute-taker.

 I imagine the structure of the review roughly as follows, with a
 duration of about 2 1/2 hours divided into 25-30 minute blocks:

 - Brief team intro and recap of team's activities through the quarter,
 compared with goals
 - Drill into goals and targets: Did we achieve what we said we would?
 - Review of challenges, blockers and successes
 - Discussion of proposed changes (e.g. resourcing, targets) and other
 action items
 - Buffer time, debriefing

 Once again, the primary purpose of these reviews is to create improved
 structures for internal accountability, escalation points in cases
 where serious changes are necessary, and transparency to the world.

 In addition to these priority initiatives, my recommendation would be
 to conduct quarterly reviews for any activity that requires more than
 a set amount of resources (people/dollars). These additional reviews
 may however be conducted in a more lightweight manner and internally
 to the departments. We’re slowly getting into that habit in
 engineering.

 As we pilot this process, the format of the high priority reviews can
 help inform and support reviews across the organization.

 Feedback and questions are appreciated.

 All best,
 Erik

 [1] https://wikimediafoundation.org/wiki/Vote:Narrowing_Focus
 [2] https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings
 --
 Erik Möller
 VP of Engineering and Product Development, Wikimedia Foundation

 Support Free Knowledge: https://wikimediafoundation.org/wiki/Donate

 ___
 Wikimedia-l mailing list
 Wikimedia-l@lists.wikimedia.org
 Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l



-- 
Tilman Bayer
Senior Operations Analyst (Movement Communications)
Wikimedia Foundation
IRC (Freenode): HaeB

___
Wikimedia-l mailing list, guidelines at: 
https://meta.wikimedia.org/wiki/Mailing_lists/Guidelines
Wikimedia-l@lists.wikimedia.org
Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l, 
mailto:wikimedia-l-requ...@lists.wikimedia.org?subject=unsubscribe

Re: [Wikimedia-l] Quarterly reviews of high priority WMF initiatives

2014-04-05 Thread Tilman Bayer
Minutes and slides from Wednesday's quarterly review meeting of the
Foundation's Grantmaking department are now available at
https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews/Grantmaking/April_2014
.

On Wed, Dec 19, 2012 at 6:49 PM, Erik Moeller e...@wikimedia.org wrote:
 Hi folks,

 to increase accountability and create more opportunities for course
 corrections and resourcing adjustments as necessary, Sue's asked me
 and Howie Fung to set up a quarterly project evaluation process,
 starting with our highest priority initiatives. These are, according
 to Sue's narrowing focus recommendations which were approved by the
 Board [1]:

 - Visual Editor
 - Mobile (mobile contributions + Wikipedia Zero)
 - Editor Engagement (also known as the E2 and E3 teams)
 - Funds Dissemination Committe and expanded grant-making capacity

 I'm proposing the following initial schedule:

 January:
 - Editor Engagement Experiments

 February:
 - Visual Editor
 - Mobile (Contribs + Zero)

 March:
 - Editor Engagement Features (Echo, Flow projects)
 - Funds Dissemination Committee

 We'll try doing this on the same day or adjacent to the monthly
 metrics meetings [2], since the team(s) will give a presentation on
 their recent progress, which will help set some context that would
 otherwise need to be covered in the quarterly review itself. This will
 also create open opportunities for feedback and questions.

 My goal is to do this in a manner where even though the quarterly
 review meetings themselves are internal, the outcomes are captured as
 meeting minutes and shared publicly, which is why I'm starting this
 discussion on a public list as well. I've created a wiki page here
 which we can use to discuss the concept further:

 https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews

 The internal review will, at minimum, include:

 Sue Gardner
 myself
 Howie Fung
 Team members and relevant director(s)
 Designated minute-taker

 So for example, for Visual Editor, the review team would be the Visual
 Editor / Parsoid teams, Sue, me, Howie, Terry, and a minute-taker.

 I imagine the structure of the review roughly as follows, with a
 duration of about 2 1/2 hours divided into 25-30 minute blocks:

 - Brief team intro and recap of team's activities through the quarter,
 compared with goals
 - Drill into goals and targets: Did we achieve what we said we would?
 - Review of challenges, blockers and successes
 - Discussion of proposed changes (e.g. resourcing, targets) and other
 action items
 - Buffer time, debriefing

 Once again, the primary purpose of these reviews is to create improved
 structures for internal accountability, escalation points in cases
 where serious changes are necessary, and transparency to the world.

 In addition to these priority initiatives, my recommendation would be
 to conduct quarterly reviews for any activity that requires more than
 a set amount of resources (people/dollars). These additional reviews
 may however be conducted in a more lightweight manner and internally
 to the departments. We're slowly getting into that habit in
 engineering.

 As we pilot this process, the format of the high priority reviews can
 help inform and support reviews across the organization.

 Feedback and questions are appreciated.

 All best,
 Erik

 [1] https://wikimediafoundation.org/wiki/Vote:Narrowing_Focus
 [2] https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings
 --
 Erik Möller
 VP of Engineering and Product Development, Wikimedia Foundation

 Support Free Knowledge: https://wikimediafoundation.org/wiki/Donate

 ___
 Wikimedia-l mailing list
 Wikimedia-l@lists.wikimedia.org
 Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l



-- 
Tilman Bayer
Senior Operations Analyst (Movement Communications)
Wikimedia Foundation
IRC (Freenode): HaeB

___
Wikimedia-l mailing list
Wikimedia-l@lists.wikimedia.org
Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l, 
mailto:wikimedia-l-requ...@lists.wikimedia.org?subject=unsubscribe

Re: [Wikimedia-l] Quarterly reviews of high priority WMF initiatives

2014-04-04 Thread Tilman Bayer
Minutes and slides from Monday's quarterly review meeting of the
Foundation's Analytics team are now available at
https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews/Analytics/March_2014
.

On Wed, Dec 19, 2012 at 6:49 PM, Erik Moeller e...@wikimedia.org wrote:
 Hi folks,

 to increase accountability and create more opportunities for course
 corrections and resourcing adjustments as necessary, Sue's asked me
 and Howie Fung to set up a quarterly project evaluation process,
 starting with our highest priority initiatives. These are, according
 to Sue's narrowing focus recommendations which were approved by the
 Board [1]:

 - Visual Editor
 - Mobile (mobile contributions + Wikipedia Zero)
 - Editor Engagement (also known as the E2 and E3 teams)
 - Funds Dissemination Committe and expanded grant-making capacity

 I'm proposing the following initial schedule:

 January:
 - Editor Engagement Experiments

 February:
 - Visual Editor
 - Mobile (Contribs + Zero)

 March:
 - Editor Engagement Features (Echo, Flow projects)
 - Funds Dissemination Committee

 We'll try doing this on the same day or adjacent to the monthly
 metrics meetings [2], since the team(s) will give a presentation on
 their recent progress, which will help set some context that would
 otherwise need to be covered in the quarterly review itself. This will
 also create open opportunities for feedback and questions.

 My goal is to do this in a manner where even though the quarterly
 review meetings themselves are internal, the outcomes are captured as
 meeting minutes and shared publicly, which is why I'm starting this
 discussion on a public list as well. I've created a wiki page here
 which we can use to discuss the concept further:

 https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews

 The internal review will, at minimum, include:

 Sue Gardner
 myself
 Howie Fung
 Team members and relevant director(s)
 Designated minute-taker

 So for example, for Visual Editor, the review team would be the Visual
 Editor / Parsoid teams, Sue, me, Howie, Terry, and a minute-taker.

 I imagine the structure of the review roughly as follows, with a
 duration of about 2 1/2 hours divided into 25-30 minute blocks:

 - Brief team intro and recap of team's activities through the quarter,
 compared with goals
 - Drill into goals and targets: Did we achieve what we said we would?
 - Review of challenges, blockers and successes
 - Discussion of proposed changes (e.g. resourcing, targets) and other
 action items
 - Buffer time, debriefing

 Once again, the primary purpose of these reviews is to create improved
 structures for internal accountability, escalation points in cases
 where serious changes are necessary, and transparency to the world.

 In addition to these priority initiatives, my recommendation would be
 to conduct quarterly reviews for any activity that requires more than
 a set amount of resources (people/dollars). These additional reviews
 may however be conducted in a more lightweight manner and internally
 to the departments. We're slowly getting into that habit in
 engineering.

 As we pilot this process, the format of the high priority reviews can
 help inform and support reviews across the organization.

 Feedback and questions are appreciated.

 All best,
 Erik

 [1] https://wikimediafoundation.org/wiki/Vote:Narrowing_Focus
 [2] https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings
 --
 Erik Möller
 VP of Engineering and Product Development, Wikimedia Foundation

 Support Free Knowledge: https://wikimediafoundation.org/wiki/Donate

 ___
 Wikimedia-l mailing list
 Wikimedia-l@lists.wikimedia.org
 Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l



-- 
Tilman Bayer
Senior Operations Analyst (Movement Communications)
Wikimedia Foundation
IRC (Freenode): HaeB

___
Wikimedia-l mailing list
Wikimedia-l@lists.wikimedia.org
Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l, 
mailto:wikimedia-l-requ...@lists.wikimedia.org?subject=unsubscribe

Re: [Wikimedia-l] Quarterly reviews of high priority WMF initiatives

2014-04-01 Thread Tilman Bayer
The minutes and slides from Friday's quarterly review meeting of the
Parsoid team are now available at
https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews/Parsoid/March_2014
.

On Fri, Mar 28, 2014 at 9:09 PM, Tilman Bayer tba...@wikimedia.org wrote:
 Minutes and slides from Wednesday's quarterly review of the
 Foundation's VisualEditor team are now available at
 https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews/VisualEditor/March_2014

 (A separate but related quarterly review meeting of the Parsoid team
 took place today, those minutes should be up on Monday.)

 On Wed, Dec 19, 2012 at 6:49 PM, Erik Moeller e...@wikimedia.org wrote:
 Hi folks,

 to increase accountability and create more opportunities for course
 corrections and resourcing adjustments as necessary, Sue's asked me
 and Howie Fung to set up a quarterly project evaluation process,
 starting with our highest priority initiatives. These are, according
 to Sue's narrowing focus recommendations which were approved by the
 Board [1]:

 - Visual Editor
 - Mobile (mobile contributions + Wikipedia Zero)
 - Editor Engagement (also known as the E2 and E3 teams)
 - Funds Dissemination Committe and expanded grant-making capacity

 I'm proposing the following initial schedule:

 January:
 - Editor Engagement Experiments

 February:
 - Visual Editor
 - Mobile (Contribs + Zero)

 March:
 - Editor Engagement Features (Echo, Flow projects)
 - Funds Dissemination Committee

 We'll try doing this on the same day or adjacent to the monthly
 metrics meetings [2], since the team(s) will give a presentation on
 their recent progress, which will help set some context that would
 otherwise need to be covered in the quarterly review itself. This will
 also create open opportunities for feedback and questions.

 My goal is to do this in a manner where even though the quarterly
 review meetings themselves are internal, the outcomes are captured as
 meeting minutes and shared publicly, which is why I'm starting this
 discussion on a public list as well. I've created a wiki page here
 which we can use to discuss the concept further:

 https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews

 The internal review will, at minimum, include:

 Sue Gardner
 myself
 Howie Fung
 Team members and relevant director(s)
 Designated minute-taker

 So for example, for Visual Editor, the review team would be the Visual
 Editor / Parsoid teams, Sue, me, Howie, Terry, and a minute-taker.

 I imagine the structure of the review roughly as follows, with a
 duration of about 2 1/2 hours divided into 25-30 minute blocks:

 - Brief team intro and recap of team's activities through the quarter,
 compared with goals
 - Drill into goals and targets: Did we achieve what we said we would?
 - Review of challenges, blockers and successes
 - Discussion of proposed changes (e.g. resourcing, targets) and other
 action items
 - Buffer time, debriefing

 Once again, the primary purpose of these reviews is to create improved
 structures for internal accountability, escalation points in cases
 where serious changes are necessary, and transparency to the world.

 In addition to these priority initiatives, my recommendation would be
 to conduct quarterly reviews for any activity that requires more than
 a set amount of resources (people/dollars). These additional reviews
 may however be conducted in a more lightweight manner and internally
 to the departments. We're slowly getting into that habit in
 engineering.

 As we pilot this process, the format of the high priority reviews can
 help inform and support reviews across the organization.

 Feedback and questions are appreciated.

 All best,
 Erik

 [1] https://wikimediafoundation.org/wiki/Vote:Narrowing_Focus
 [2] https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings
 --
 Erik Möller
 VP of Engineering and Product Development, Wikimedia Foundation

 Support Free Knowledge: https://wikimediafoundation.org/wiki/Donate

 ___
 Wikimedia-l mailing list
 Wikimedia-l@lists.wikimedia.org
 Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l



 --
 Tilman Bayer
 Senior Operations Analyst (Movement Communications)
 Wikimedia Foundation
 IRC (Freenode): HaeB



-- 
Tilman Bayer
Senior Operations Analyst (Movement Communications)
Wikimedia Foundation
IRC (Freenode): HaeB

___
Wikimedia-l mailing list
Wikimedia-l@lists.wikimedia.org
Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l, 
mailto:wikimedia-l-requ...@lists.wikimedia.org?subject=unsubscribe

Re: [Wikimedia-l] Quarterly reviews of high priority WMF initiatives

2014-03-28 Thread Tilman Bayer
Minutes and slides from Wednesday's quarterly review of the
Foundation's VisualEditor team are now available at
https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews/VisualEditor/March_2014

(A separate but related quarterly review meeting of the Parsoid team
took place today, those minutes should be up on Monday.)

On Wed, Dec 19, 2012 at 6:49 PM, Erik Moeller e...@wikimedia.org wrote:
 Hi folks,

 to increase accountability and create more opportunities for course
 corrections and resourcing adjustments as necessary, Sue's asked me
 and Howie Fung to set up a quarterly project evaluation process,
 starting with our highest priority initiatives. These are, according
 to Sue's narrowing focus recommendations which were approved by the
 Board [1]:

 - Visual Editor
 - Mobile (mobile contributions + Wikipedia Zero)
 - Editor Engagement (also known as the E2 and E3 teams)
 - Funds Dissemination Committe and expanded grant-making capacity

 I'm proposing the following initial schedule:

 January:
 - Editor Engagement Experiments

 February:
 - Visual Editor
 - Mobile (Contribs + Zero)

 March:
 - Editor Engagement Features (Echo, Flow projects)
 - Funds Dissemination Committee

 We'll try doing this on the same day or adjacent to the monthly
 metrics meetings [2], since the team(s) will give a presentation on
 their recent progress, which will help set some context that would
 otherwise need to be covered in the quarterly review itself. This will
 also create open opportunities for feedback and questions.

 My goal is to do this in a manner where even though the quarterly
 review meetings themselves are internal, the outcomes are captured as
 meeting minutes and shared publicly, which is why I'm starting this
 discussion on a public list as well. I've created a wiki page here
 which we can use to discuss the concept further:

 https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews

 The internal review will, at minimum, include:

 Sue Gardner
 myself
 Howie Fung
 Team members and relevant director(s)
 Designated minute-taker

 So for example, for Visual Editor, the review team would be the Visual
 Editor / Parsoid teams, Sue, me, Howie, Terry, and a minute-taker.

 I imagine the structure of the review roughly as follows, with a
 duration of about 2 1/2 hours divided into 25-30 minute blocks:

 - Brief team intro and recap of team's activities through the quarter,
 compared with goals
 - Drill into goals and targets: Did we achieve what we said we would?
 - Review of challenges, blockers and successes
 - Discussion of proposed changes (e.g. resourcing, targets) and other
 action items
 - Buffer time, debriefing

 Once again, the primary purpose of these reviews is to create improved
 structures for internal accountability, escalation points in cases
 where serious changes are necessary, and transparency to the world.

 In addition to these priority initiatives, my recommendation would be
 to conduct quarterly reviews for any activity that requires more than
 a set amount of resources (people/dollars). These additional reviews
 may however be conducted in a more lightweight manner and internally
 to the departments. We're slowly getting into that habit in
 engineering.

 As we pilot this process, the format of the high priority reviews can
 help inform and support reviews across the organization.

 Feedback and questions are appreciated.

 All best,
 Erik

 [1] https://wikimediafoundation.org/wiki/Vote:Narrowing_Focus
 [2] https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings
 --
 Erik Möller
 VP of Engineering and Product Development, Wikimedia Foundation

 Support Free Knowledge: https://wikimediafoundation.org/wiki/Donate

 ___
 Wikimedia-l mailing list
 Wikimedia-l@lists.wikimedia.org
 Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l



-- 
Tilman Bayer
Senior Operations Analyst (Movement Communications)
Wikimedia Foundation
IRC (Freenode): HaeB

___
Wikimedia-l mailing list
Wikimedia-l@lists.wikimedia.org
Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l, 
mailto:wikimedia-l-requ...@lists.wikimedia.org?subject=unsubscribe

Re: [Wikimedia-l] Quarterly reviews of high priority WMF initiatives

2014-03-07 Thread Tilman Bayer
Minutes and slides from Wednesday's quarterly review of the
Foundation's Wikipedia Zero team are now available at
https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews/Wikipedia_Zero/March_2014
.

On Wed, Dec 19, 2012 at 6:49 PM, Erik Moeller e...@wikimedia.org wrote:
 Hi folks,

 to increase accountability and create more opportunities for course
 corrections and resourcing adjustments as necessary, Sue's asked me
 and Howie Fung to set up a quarterly project evaluation process,
 starting with our highest priority initiatives. These are, according
 to Sue's narrowing focus recommendations which were approved by the
 Board [1]:

 - Visual Editor
 - Mobile (mobile contributions + Wikipedia Zero)
 - Editor Engagement (also known as the E2 and E3 teams)
 - Funds Dissemination Committe and expanded grant-making capacity

 I'm proposing the following initial schedule:

 January:
 - Editor Engagement Experiments

 February:
 - Visual Editor
 - Mobile (Contribs + Zero)

 March:
 - Editor Engagement Features (Echo, Flow projects)
 - Funds Dissemination Committee

 We'll try doing this on the same day or adjacent to the monthly
 metrics meetings [2], since the team(s) will give a presentation on
 their recent progress, which will help set some context that would
 otherwise need to be covered in the quarterly review itself. This will
 also create open opportunities for feedback and questions.

 My goal is to do this in a manner where even though the quarterly
 review meetings themselves are internal, the outcomes are captured as
 meeting minutes and shared publicly, which is why I'm starting this
 discussion on a public list as well. I've created a wiki page here
 which we can use to discuss the concept further:

 https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews

 The internal review will, at minimum, include:

 Sue Gardner
 myself
 Howie Fung
 Team members and relevant director(s)
 Designated minute-taker

 So for example, for Visual Editor, the review team would be the Visual
 Editor / Parsoid teams, Sue, me, Howie, Terry, and a minute-taker.

 I imagine the structure of the review roughly as follows, with a
 duration of about 2 1/2 hours divided into 25-30 minute blocks:

 - Brief team intro and recap of team's activities through the quarter,
 compared with goals
 - Drill into goals and targets: Did we achieve what we said we would?
 - Review of challenges, blockers and successes
 - Discussion of proposed changes (e.g. resourcing, targets) and other
 action items
 - Buffer time, debriefing

 Once again, the primary purpose of these reviews is to create improved
 structures for internal accountability, escalation points in cases
 where serious changes are necessary, and transparency to the world.

 In addition to these priority initiatives, my recommendation would be
 to conduct quarterly reviews for any activity that requires more than
 a set amount of resources (people/dollars). These additional reviews
 may however be conducted in a more lightweight manner and internally
 to the departments. We're slowly getting into that habit in
 engineering.

 As we pilot this process, the format of the high priority reviews can
 help inform and support reviews across the organization.

 Feedback and questions are appreciated.

 All best,
 Erik

 [1] https://wikimediafoundation.org/wiki/Vote:Narrowing_Focus
 [2] https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings
 --
 Erik Möller
 VP of Engineering and Product Development, Wikimedia Foundation

 Support Free Knowledge: https://wikimediafoundation.org/wiki/Donate

 ___
 Wikimedia-l mailing list
 Wikimedia-l@lists.wikimedia.org
 Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l



-- 
Tilman Bayer
Senior Operations Analyst (Movement Communications)
Wikimedia Foundation
IRC (Freenode): HaeB

___
Wikimedia-l mailing list
Wikimedia-l@lists.wikimedia.org
Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l, 
mailto:wikimedia-l-requ...@lists.wikimedia.org?subject=unsubscribe

Re: [Wikimedia-l] Quarterly reviews of high priority WMF initiatives

2014-03-07 Thread Samuel Klein
These quarterly reviews continue to be really interesting and useful.
 Thank you.  SJ

On Mon, Mar 3, 2014 at 9:31 PM, Tilman Bayer tba...@wikimedia.org wrote:
 Minutes and slides from Friday's quarterly review of the Foundation's
 Growth team are now available at

 https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews/Growth/February_2014

___
Wikimedia-l mailing list
Wikimedia-l@lists.wikimedia.org
Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l, 
mailto:wikimedia-l-requ...@lists.wikimedia.org?subject=unsubscribe

Re: [Wikimedia-l] Quarterly reviews of high priority WMF initiatives

2014-03-03 Thread Tilman Bayer
Minutes and slides from Friday's quarterly review of the Foundation's
Growth team are now available at

https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews/Growth/February_2014
.

On Wed, Dec 19, 2012 at 6:49 PM, Erik Moeller e...@wikimedia.org wrote:
 Hi folks,

 to increase accountability and create more opportunities for course
 corrections and resourcing adjustments as necessary, Sue's asked me
 and Howie Fung to set up a quarterly project evaluation process,
 starting with our highest priority initiatives. These are, according
 to Sue's narrowing focus recommendations which were approved by the
 Board [1]:

 - Visual Editor
 - Mobile (mobile contributions + Wikipedia Zero)
 - Editor Engagement (also known as the E2 and E3 teams)
 - Funds Dissemination Committe and expanded grant-making capacity

 I'm proposing the following initial schedule:

 January:
 - Editor Engagement Experiments

 February:
 - Visual Editor
 - Mobile (Contribs + Zero)

 March:
 - Editor Engagement Features (Echo, Flow projects)
 - Funds Dissemination Committee

 We'll try doing this on the same day or adjacent to the monthly
 metrics meetings [2], since the team(s) will give a presentation on
 their recent progress, which will help set some context that would
 otherwise need to be covered in the quarterly review itself. This will
 also create open opportunities for feedback and questions.

 My goal is to do this in a manner where even though the quarterly
 review meetings themselves are internal, the outcomes are captured as
 meeting minutes and shared publicly, which is why I'm starting this
 discussion on a public list as well. I've created a wiki page here
 which we can use to discuss the concept further:

 https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews

 The internal review will, at minimum, include:

 Sue Gardner
 myself
 Howie Fung
 Team members and relevant director(s)
 Designated minute-taker

 So for example, for Visual Editor, the review team would be the Visual
 Editor / Parsoid teams, Sue, me, Howie, Terry, and a minute-taker.

 I imagine the structure of the review roughly as follows, with a
 duration of about 2 1/2 hours divided into 25-30 minute blocks:

 - Brief team intro and recap of team's activities through the quarter,
 compared with goals
 - Drill into goals and targets: Did we achieve what we said we would?
 - Review of challenges, blockers and successes
 - Discussion of proposed changes (e.g. resourcing, targets) and other
 action items
 - Buffer time, debriefing

 Once again, the primary purpose of these reviews is to create improved
 structures for internal accountability, escalation points in cases
 where serious changes are necessary, and transparency to the world.

 In addition to these priority initiatives, my recommendation would be
 to conduct quarterly reviews for any activity that requires more than
 a set amount of resources (people/dollars). These additional reviews
 may however be conducted in a more lightweight manner and internally
 to the departments. We're slowly getting into that habit in
 engineering.

 As we pilot this process, the format of the high priority reviews can
 help inform and support reviews across the organization.

 Feedback and questions are appreciated.

 All best,
 Erik

 [1] https://wikimediafoundation.org/wiki/Vote:Narrowing_Focus
 [2] https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings
 --
 Erik Möller
 VP of Engineering and Product Development, Wikimedia Foundation

 Support Free Knowledge: https://wikimediafoundation.org/wiki/Donate

 ___
 Wikimedia-l mailing list
 Wikimedia-l@lists.wikimedia.org
 Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l



-- 
Tilman Bayer
Senior Operations Analyst (Movement Communications)
Wikimedia Foundation
IRC (Freenode): HaeB

___
Wikimedia-l mailing list
Wikimedia-l@lists.wikimedia.org
Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l, 
mailto:wikimedia-l-requ...@lists.wikimedia.org?subject=unsubscribe

Re: [Wikimedia-l] Quarterly reviews of high priority WMF initiatives

2014-02-27 Thread Tilman Bayer
Minutes and slides from this week's quarterly review of the
Foundation's Core features team are now available at
https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews/Core_features/February_2014

On Wed, Dec 19, 2012 at 6:49 PM, Erik Moeller e...@wikimedia.org wrote:
 Hi folks,

 to increase accountability and create more opportunities for course
 corrections and resourcing adjustments as necessary, Sue's asked me
 and Howie Fung to set up a quarterly project evaluation process,
 starting with our highest priority initiatives. These are, according
 to Sue's narrowing focus recommendations which were approved by the
 Board [1]:

 - Visual Editor
 - Mobile (mobile contributions + Wikipedia Zero)
 - Editor Engagement (also known as the E2 and E3 teams)
 - Funds Dissemination Committe and expanded grant-making capacity

 I'm proposing the following initial schedule:

 January:
 - Editor Engagement Experiments

 February:
 - Visual Editor
 - Mobile (Contribs + Zero)

 March:
 - Editor Engagement Features (Echo, Flow projects)
 - Funds Dissemination Committee

 We'll try doing this on the same day or adjacent to the monthly
 metrics meetings [2], since the team(s) will give a presentation on
 their recent progress, which will help set some context that would
 otherwise need to be covered in the quarterly review itself. This will
 also create open opportunities for feedback and questions.

 My goal is to do this in a manner where even though the quarterly
 review meetings themselves are internal, the outcomes are captured as
 meeting minutes and shared publicly, which is why I'm starting this
 discussion on a public list as well. I've created a wiki page here
 which we can use to discuss the concept further:

 https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews

 The internal review will, at minimum, include:

 Sue Gardner
 myself
 Howie Fung
 Team members and relevant director(s)
 Designated minute-taker

 So for example, for Visual Editor, the review team would be the Visual
 Editor / Parsoid teams, Sue, me, Howie, Terry, and a minute-taker.

 I imagine the structure of the review roughly as follows, with a
 duration of about 2 1/2 hours divided into 25-30 minute blocks:

 - Brief team intro and recap of team's activities through the quarter,
 compared with goals
 - Drill into goals and targets: Did we achieve what we said we would?
 - Review of challenges, blockers and successes
 - Discussion of proposed changes (e.g. resourcing, targets) and other
 action items
 - Buffer time, debriefing

 Once again, the primary purpose of these reviews is to create improved
 structures for internal accountability, escalation points in cases
 where serious changes are necessary, and transparency to the world.

 In addition to these priority initiatives, my recommendation would be
 to conduct quarterly reviews for any activity that requires more than
 a set amount of resources (people/dollars). These additional reviews
 may however be conducted in a more lightweight manner and internally
 to the departments. We're slowly getting into that habit in
 engineering.

 As we pilot this process, the format of the high priority reviews can
 help inform and support reviews across the organization.

 Feedback and questions are appreciated.

 All best,
 Erik

 [1] https://wikimediafoundation.org/wiki/Vote:Narrowing_Focus
 [2] https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings
 --
 Erik Möller
 VP of Engineering and Product Development, Wikimedia Foundation

 Support Free Knowledge: https://wikimediafoundation.org/wiki/Donate

 ___
 Wikimedia-l mailing list
 Wikimedia-l@lists.wikimedia.org
 Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l



-- 
Tilman Bayer
Senior Operations Analyst (Movement Communications)
Wikimedia Foundation
IRC (Freenode): HaeB

___
Wikimedia-l mailing list
Wikimedia-l@lists.wikimedia.org
Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l, 
mailto:wikimedia-l-requ...@lists.wikimedia.org?subject=unsubscribe

Re: [Wikimedia-l] Quarterly reviews of high priority WMF initiatives

2014-02-21 Thread Tilman Bayer
Minutes and slides from Wednesday's quarterly review of the
Foundation's Mobile Contributions team are now available at
https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews/Mobile_contributions/February_2014

On Wed, Dec 19, 2012 at 6:49 PM, Erik Moeller e...@wikimedia.org wrote:
 Hi folks,

 to increase accountability and create more opportunities for course
 corrections and resourcing adjustments as necessary, Sue's asked me
 and Howie Fung to set up a quarterly project evaluation process,
 starting with our highest priority initiatives. These are, according
 to Sue's narrowing focus recommendations which were approved by the
 Board [1]:

 - Visual Editor
 - Mobile (mobile contributions + Wikipedia Zero)
 - Editor Engagement (also known as the E2 and E3 teams)
 - Funds Dissemination Committe and expanded grant-making capacity

 I'm proposing the following initial schedule:

 January:
 - Editor Engagement Experiments

 February:
 - Visual Editor
 - Mobile (Contribs + Zero)

 March:
 - Editor Engagement Features (Echo, Flow projects)
 - Funds Dissemination Committee

 We'll try doing this on the same day or adjacent to the monthly
 metrics meetings [2], since the team(s) will give a presentation on
 their recent progress, which will help set some context that would
 otherwise need to be covered in the quarterly review itself. This will
 also create open opportunities for feedback and questions.

 My goal is to do this in a manner where even though the quarterly
 review meetings themselves are internal, the outcomes are captured as
 meeting minutes and shared publicly, which is why I'm starting this
 discussion on a public list as well. I've created a wiki page here
 which we can use to discuss the concept further:

 https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews

 The internal review will, at minimum, include:

 Sue Gardner
 myself
 Howie Fung
 Team members and relevant director(s)
 Designated minute-taker

 So for example, for Visual Editor, the review team would be the Visual
 Editor / Parsoid teams, Sue, me, Howie, Terry, and a minute-taker.

 I imagine the structure of the review roughly as follows, with a
 duration of about 2 1/2 hours divided into 25-30 minute blocks:

 - Brief team intro and recap of team's activities through the quarter,
 compared with goals
 - Drill into goals and targets: Did we achieve what we said we would?
 - Review of challenges, blockers and successes
 - Discussion of proposed changes (e.g. resourcing, targets) and other
 action items
 - Buffer time, debriefing

 Once again, the primary purpose of these reviews is to create improved
 structures for internal accountability, escalation points in cases
 where serious changes are necessary, and transparency to the world.

 In addition to these priority initiatives, my recommendation would be
 to conduct quarterly reviews for any activity that requires more than
 a set amount of resources (people/dollars). These additional reviews
 may however be conducted in a more lightweight manner and internally
 to the departments. We're slowly getting into that habit in
 engineering.

 As we pilot this process, the format of the high priority reviews can
 help inform and support reviews across the organization.

 Feedback and questions are appreciated.

 All best,
 Erik

 [1] https://wikimediafoundation.org/wiki/Vote:Narrowing_Focus
 [2] https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings
 --
 Erik Möller
 VP of Engineering and Product Development, Wikimedia Foundation

 Support Free Knowledge: https://wikimediafoundation.org/wiki/Donate

 ___
 Wikimedia-l mailing list
 Wikimedia-l@lists.wikimedia.org
 Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l



-- 
Tilman Bayer
Senior Operations Analyst (Movement Communications)
Wikimedia Foundation
IRC (Freenode): HaeB

___
Wikimedia-l mailing list
Wikimedia-l@lists.wikimedia.org
Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l, 
mailto:wikimedia-l-requ...@lists.wikimedia.org?subject=unsubscribe

Re: [Wikimedia-l] Quarterly reviews of high priority WMF initiatives

2013-12-06 Thread Tilman Bayer
Minutes, slides and graphs from Wednesday's quarterly review of the
Foundation's Growth (formerly Editor Engagement Experiments) team are
now available at
https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews/Growth/December_2013

On Wed, Dec 19, 2012 at 6:49 PM, Erik Moeller e...@wikimedia.org wrote:
 Hi folks,

 to increase accountability and create more opportunities for course
 corrections and resourcing adjustments as necessary, Sue's asked me
 and Howie Fung to set up a quarterly project evaluation process,
 starting with our highest priority initiatives. These are, according
 to Sue's narrowing focus recommendations which were approved by the
 Board [1]:

 - Visual Editor
 - Mobile (mobile contributions + Wikipedia Zero)
 - Editor Engagement (also known as the E2 and E3 teams)
 - Funds Dissemination Committe and expanded grant-making capacity

...


 My goal is to do this in a manner where even though the quarterly
 review meetings themselves are internal, the outcomes are captured as
 meeting minutes and shared publicly, which is why I'm starting this
 discussion on a public list as well. I've created a wiki page here
 which we can use to discuss the concept further:

 https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews

 The internal review will, at minimum, include:

 Sue Gardner
 myself
 Howie Fung
 Team members and relevant director(s)
 Designated minute-taker

 So for example, for Visual Editor, the review team would be the Visual
 Editor / Parsoid teams, Sue, me, Howie, Terry, and a minute-taker.

 I imagine the structure of the review roughly as follows, with a
 duration of about 2 1/2 hours divided into 25-30 minute blocks:

 - Brief team intro and recap of team's activities through the quarter,
 compared with goals
 - Drill into goals and targets: Did we achieve what we said we would?
 - Review of challenges, blockers and successes
 - Discussion of proposed changes (e.g. resourcing, targets) and other
 action items
 - Buffer time, debriefing

 Once again, the primary purpose of these reviews is to create improved
 structures for internal accountability, escalation points in cases
 where serious changes are necessary, and transparency to the world.

 In addition to these priority initiatives, my recommendation would be
 to conduct quarterly reviews for any activity that requires more than
 a set amount of resources (people/dollars). These additional reviews
 may however be conducted in a more lightweight manner and internally
 to the departments. We’re slowly getting into that habit in
 engineering.

 As we pilot this process, the format of the high priority reviews can
 help inform and support reviews across the organization.

 Feedback and questions are appreciated.

 All best,
 Erik

 [1] https://wikimediafoundation.org/wiki/Vote:Narrowing_Focus
 [2] https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings
 --
 Erik Möller
 VP of Engineering and Product Development, Wikimedia Foundation

 Support Free Knowledge: https://wikimediafoundation.org/wiki/Donate

 ___
 Wikimedia-l mailing list
 Wikimedia-l@lists.wikimedia.org
 Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l



-- 
Tilman Bayer
Senior Operations Analyst (Movement Communications)
Wikimedia Foundation
IRC (Freenode): HaeB

___
Wikimedia-l mailing list
Wikimedia-l@lists.wikimedia.org
Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l, 
mailto:wikimedia-l-requ...@lists.wikimedia.org?subject=unsubscribe

Re: [Wikimedia-l] Quarterly reviews of high priority WMF initiatives

2013-12-04 Thread Tilman Bayer
Minutes and slides from Tuesday's quarterly review of the Foundation's
Multimedia team are now available at
https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews/Multimedia/December_2013
.


On Wed, Dec 19, 2012 at 6:49 PM, Erik Moeller e...@wikimedia.org wrote:

 Hi folks,

 to increase accountability and create more opportunities for course
 corrections and resourcing adjustments as necessary, Sue's asked me
 and Howie Fung to set up a quarterly project evaluation process,
 starting with our highest priority initiatives. These are, according
 to Sue's narrowing focus recommendations which were approved by the
 Board [1]:

 - Visual Editor
 - Mobile (mobile contributions + Wikipedia Zero)
 - Editor Engagement (also known as the E2 and E3 teams)
 - Funds Dissemination Committe and expanded grant-making capacity


...

 My goal is to do this in a manner where even though the quarterly
 review meetings themselves are internal, the outcomes are captured as
 meeting minutes and shared publicly, which is why I'm starting this
 discussion on a public list as well. I've created a wiki page here
 which we can use to discuss the concept further:

 https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews

 The internal review will, at minimum, include:

 Sue Gardner
 myself
 Howie Fung
 Team members and relevant director(s)
 Designated minute-taker

 So for example, for Visual Editor, the review team would be the Visual
 Editor / Parsoid teams, Sue, me, Howie, Terry, and a minute-taker.

 I imagine the structure of the review roughly as follows, with a
 duration of about 2 1/2 hours divided into 25-30 minute blocks:

 - Brief team intro and recap of team's activities through the quarter,
 compared with goals
 - Drill into goals and targets: Did we achieve what we said we would?
 - Review of challenges, blockers and successes
 - Discussion of proposed changes (e.g. resourcing, targets) and other
 action items
 - Buffer time, debriefing

 Once again, the primary purpose of these reviews is to create improved
 structures for internal accountability, escalation points in cases
 where serious changes are necessary, and transparency to the world.

 In addition to these priority initiatives, my recommendation would be
 to conduct quarterly reviews for any activity that requires more than
 a set amount of resources (people/dollars). These additional reviews
 may however be conducted in a more lightweight manner and internally
 to the departments. We’re slowly getting into that habit in
 engineering.

 As we pilot this process, the format of the high priority reviews can
 help inform and support reviews across the organization.

 Feedback and questions are appreciated.

 All best,
 Erik

 [1] https://wikimediafoundation.org/wiki/Vote:Narrowing_Focus
 [2] https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings
 --
 Erik Möller
 VP of Engineering and Product Development, Wikimedia Foundation





-- 
Tilman Bayer
Senior Operations Analyst (Movement Communications)
Wikimedia Foundation
IRC (Freenode): HaeB

___
Wikimedia-l mailing list
Wikimedia-l@lists.wikimedia.org
Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l, 
mailto:wikimedia-l-requ...@lists.wikimedia.org?subject=unsubscribe

Re: [Wikimedia-l] Quarterly reviews of high priority WMF initiatives

2013-12-02 Thread Tilman Bayer
Minutes and slides from the quarterly review of the Foundation's
Grantmaking and Program Evaluation teams are now available at

https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews/Grantmaking_and_Program_Evaluation/October_2013

On Wed, Dec 19, 2012 at 6:49 PM, Erik Moeller e...@wikimedia.org wrote:
 Hi folks,

 to increase accountability and create more opportunities for course
 corrections and resourcing adjustments as necessary, Sue's asked me
 and Howie Fung to set up a quarterly project evaluation process,
 starting with our highest priority initiatives. These are, according
 to Sue's narrowing focus recommendations which were approved by the
 Board [1]:

 - Visual Editor
 - Mobile (mobile contributions + Wikipedia Zero)
 - Editor Engagement (also known as the E2 and E3 teams)
 - Funds Dissemination Committe and expanded grant-making capacity

 I'm proposing the following initial schedule:

 January:
 - Editor Engagement Experiments

 February:
 - Visual Editor
 - Mobile (Contribs + Zero)

 March:
 - Editor Engagement Features (Echo, Flow projects)
 - Funds Dissemination Committee

 We’ll try doing this on the same day or adjacent to the monthly
 metrics meetings [2], since the team(s) will give a presentation on
 their recent progress, which will help set some context that would
 otherwise need to be covered in the quarterly review itself. This will
 also create open opportunities for feedback and questions.

 My goal is to do this in a manner where even though the quarterly
 review meetings themselves are internal, the outcomes are captured as
 meeting minutes and shared publicly, which is why I'm starting this
 discussion on a public list as well. I've created a wiki page here
 which we can use to discuss the concept further:

 https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews

 The internal review will, at minimum, include:

 Sue Gardner
 myself
 Howie Fung
 Team members and relevant director(s)
 Designated minute-taker

 So for example, for Visual Editor, the review team would be the Visual
 Editor / Parsoid teams, Sue, me, Howie, Terry, and a minute-taker.

 I imagine the structure of the review roughly as follows, with a
 duration of about 2 1/2 hours divided into 25-30 minute blocks:

 - Brief team intro and recap of team's activities through the quarter,
 compared with goals
 - Drill into goals and targets: Did we achieve what we said we would?
 - Review of challenges, blockers and successes
 - Discussion of proposed changes (e.g. resourcing, targets) and other
 action items
 - Buffer time, debriefing

 Once again, the primary purpose of these reviews is to create improved
 structures for internal accountability, escalation points in cases
 where serious changes are necessary, and transparency to the world.

 In addition to these priority initiatives, my recommendation would be
 to conduct quarterly reviews for any activity that requires more than
 a set amount of resources (people/dollars). These additional reviews
 may however be conducted in a more lightweight manner and internally
 to the departments. We’re slowly getting into that habit in
 engineering.

 As we pilot this process, the format of the high priority reviews can
 help inform and support reviews across the organization.

 Feedback and questions are appreciated.

 All best,
 Erik

 [1] https://wikimediafoundation.org/wiki/Vote:Narrowing_Focus
 [2] https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings
 --
 Erik Möller
 VP of Engineering and Product Development, Wikimedia Foundation

 Support Free Knowledge: https://wikimediafoundation.org/wiki/Donate

 ___
 Wikimedia-l mailing list
 Wikimedia-l@lists.wikimedia.org
 Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l



-- 
Tilman Bayer
Senior Operations Analyst (Movement Communications)
Wikimedia Foundation
IRC (Freenode): HaeB

___
Wikimedia-l mailing list
Wikimedia-l@lists.wikimedia.org
Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l, 
mailto:wikimedia-l-requ...@lists.wikimedia.org?subject=unsubscribe

Re: [Wikimedia-l] Quarterly reviews of high priority WMF initiatives

2013-11-11 Thread Tilman Bayer
Minutes and slides from the third quarterly review of the Foundation's
VisualEditor and Parsoid teams are now available at
https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews/VisualEditor-Parsoid/November_2013

On Wed, Dec 19, 2012 at 6:49 PM, Erik Moeller e...@wikimedia.org wrote:
 Hi folks,

 to increase accountability and create more opportunities for course
 corrections and resourcing adjustments as necessary, Sue's asked me
 and Howie Fung to set up a quarterly project evaluation process,
 starting with our highest priority initiatives. These are, according
 to Sue's narrowing focus recommendations which were approved by the
 Board [1]:

 - Visual Editor
 - Mobile (mobile contributions + Wikipedia Zero)
 - Editor Engagement (also known as the E2 and E3 teams)
 - Funds Dissemination Committe and expanded grant-making capacity

 I'm proposing the following initial schedule:

 January:
 - Editor Engagement Experiments

 February:
 - Visual Editor
 - Mobile (Contribs + Zero)

 March:
 - Editor Engagement Features (Echo, Flow projects)
 - Funds Dissemination Committee

 We’ll try doing this on the same day or adjacent to the monthly
 metrics meetings [2], since the team(s) will give a presentation on
 their recent progress, which will help set some context that would
 otherwise need to be covered in the quarterly review itself. This will
 also create open opportunities for feedback and questions.

 My goal is to do this in a manner where even though the quarterly
 review meetings themselves are internal, the outcomes are captured as
 meeting minutes and shared publicly, which is why I'm starting this
 discussion on a public list as well. I've created a wiki page here
 which we can use to discuss the concept further:

 https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews

 The internal review will, at minimum, include:

 Sue Gardner
 myself
 Howie Fung
 Team members and relevant director(s)
 Designated minute-taker

 So for example, for Visual Editor, the review team would be the Visual
 Editor / Parsoid teams, Sue, me, Howie, Terry, and a minute-taker.

 I imagine the structure of the review roughly as follows, with a
 duration of about 2 1/2 hours divided into 25-30 minute blocks:

 - Brief team intro and recap of team's activities through the quarter,
 compared with goals
 - Drill into goals and targets: Did we achieve what we said we would?
 - Review of challenges, blockers and successes
 - Discussion of proposed changes (e.g. resourcing, targets) and other
 action items
 - Buffer time, debriefing

 Once again, the primary purpose of these reviews is to create improved
 structures for internal accountability, escalation points in cases
 where serious changes are necessary, and transparency to the world.

 In addition to these priority initiatives, my recommendation would be
 to conduct quarterly reviews for any activity that requires more than
 a set amount of resources (people/dollars). These additional reviews
 may however be conducted in a more lightweight manner and internally
 to the departments. We’re slowly getting into that habit in
 engineering.

 As we pilot this process, the format of the high priority reviews can
 help inform and support reviews across the organization.

 Feedback and questions are appreciated.

 All best,
 Erik

 [1] https://wikimediafoundation.org/wiki/Vote:Narrowing_Focus
 [2] https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings
 --
 Erik Möller
 VP of Engineering and Product Development, Wikimedia Foundation

 Support Free Knowledge: https://wikimediafoundation.org/wiki/Donate

 ___
 Wikimedia-l mailing list
 Wikimedia-l@lists.wikimedia.org
 Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l



-- 
Tilman Bayer
Senior Operations Analyst (Movement Communications)
Wikimedia Foundation
IRC (Freenode): HaeB

___
Wikimedia-l mailing list
Wikimedia-l@lists.wikimedia.org
Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l, 
mailto:wikimedia-l-requ...@lists.wikimedia.org?subject=unsubscribe

Re: [Wikimedia-l] Quarterly reviews of high priority WMF initiatives

2013-11-07 Thread Tilman Bayer
Minutes and slides from the third quarterly review of the Foundation's
Mobile Contributions team are now available at
https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews/Mobile_contributions/October_2013

On Wed, Dec 19, 2012 at 6:49 PM, Erik Moeller e...@wikimedia.org wrote:
 Hi folks,

 to increase accountability and create more opportunities for course
 corrections and resourcing adjustments as necessary, Sue's asked me
 and Howie Fung to set up a quarterly project evaluation process,
 starting with our highest priority initiatives. These are, according
 to Sue's narrowing focus recommendations which were approved by the
 Board [1]:

 - Visual Editor
 - Mobile (mobile contributions + Wikipedia Zero)
 - Editor Engagement (also known as the E2 and E3 teams)
 - Funds Dissemination Committe and expanded grant-making capacity

 I'm proposing the following initial schedule:

 January:
 - Editor Engagement Experiments

 February:
 - Visual Editor
 - Mobile (Contribs + Zero)

 March:
 - Editor Engagement Features (Echo, Flow projects)
 - Funds Dissemination Committee

 We’ll try doing this on the same day or adjacent to the monthly
 metrics meetings [2], since the team(s) will give a presentation on
 their recent progress, which will help set some context that would
 otherwise need to be covered in the quarterly review itself. This will
 also create open opportunities for feedback and questions.

 My goal is to do this in a manner where even though the quarterly
 review meetings themselves are internal, the outcomes are captured as
 meeting minutes and shared publicly, which is why I'm starting this
 discussion on a public list as well. I've created a wiki page here
 which we can use to discuss the concept further:

 https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews

 The internal review will, at minimum, include:

 Sue Gardner
 myself
 Howie Fung
 Team members and relevant director(s)
 Designated minute-taker

 So for example, for Visual Editor, the review team would be the Visual
 Editor / Parsoid teams, Sue, me, Howie, Terry, and a minute-taker.

 I imagine the structure of the review roughly as follows, with a
 duration of about 2 1/2 hours divided into 25-30 minute blocks:

 - Brief team intro and recap of team's activities through the quarter,
 compared with goals
 - Drill into goals and targets: Did we achieve what we said we would?
 - Review of challenges, blockers and successes
 - Discussion of proposed changes (e.g. resourcing, targets) and other
 action items
 - Buffer time, debriefing

 Once again, the primary purpose of these reviews is to create improved
 structures for internal accountability, escalation points in cases
 where serious changes are necessary, and transparency to the world.

 In addition to these priority initiatives, my recommendation would be
 to conduct quarterly reviews for any activity that requires more than
 a set amount of resources (people/dollars). These additional reviews
 may however be conducted in a more lightweight manner and internally
 to the departments. We’re slowly getting into that habit in
 engineering.

 As we pilot this process, the format of the high priority reviews can
 help inform and support reviews across the organization.

 Feedback and questions are appreciated.

 All best,
 Erik

 [1] https://wikimediafoundation.org/wiki/Vote:Narrowing_Focus
 [2] https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings
 --
 Erik Möller
 VP of Engineering and Product Development, Wikimedia Foundation

 Support Free Knowledge: https://wikimediafoundation.org/wiki/Donate

 ___
 Wikimedia-l mailing list
 Wikimedia-l@lists.wikimedia.org
 Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l



-- 
Tilman Bayer
Senior Operations Analyst (Movement Communications)
Wikimedia Foundation
IRC (Freenode): HaeB

___
Wikimedia-l mailing list
Wikimedia-l@lists.wikimedia.org
Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l, 
mailto:wikimedia-l-requ...@lists.wikimedia.org?subject=unsubscribe

Re: [Wikimedia-l] Quarterly reviews of high priority WMF initiatives

2013-09-10 Thread Tilman Bayer
Minutes and slides from the third quarterly review of the Foundation's
Editor engagement experiments (E3) team are now available at
https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews/Editor_engagement_experiments/September_2013
.

On Wed, Dec 19, 2012 at 6:49 PM, Erik Moeller e...@wikimedia.org wrote:
 Hi folks,

 to increase accountability and create more opportunities for course
 corrections and resourcing adjustments as necessary, Sue's asked me
 and Howie Fung to set up a quarterly project evaluation process,
 starting with our highest priority initiatives. These are, according
 to Sue's narrowing focus recommendations which were approved by the
 Board [1]:

 - Visual Editor
 - Mobile (mobile contributions + Wikipedia Zero)
 - Editor Engagement (also known as the E2 and E3 teams)
 - Funds Dissemination Committe and expanded grant-making capacity

 I'm proposing the following initial schedule:

 January:
 - Editor Engagement Experiments

 February:
 - Visual Editor
 - Mobile (Contribs + Zero)

 March:
 - Editor Engagement Features (Echo, Flow projects)
 - Funds Dissemination Committee

 We’ll try doing this on the same day or adjacent to the monthly
 metrics meetings [2], since the team(s) will give a presentation on
 their recent progress, which will help set some context that would
 otherwise need to be covered in the quarterly review itself. This will
 also create open opportunities for feedback and questions.

 My goal is to do this in a manner where even though the quarterly
 review meetings themselves are internal, the outcomes are captured as
 meeting minutes and shared publicly, which is why I'm starting this
 discussion on a public list as well. I've created a wiki page here
 which we can use to discuss the concept further:

 https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews

 The internal review will, at minimum, include:

 Sue Gardner
 myself
 Howie Fung
 Team members and relevant director(s)
 Designated minute-taker

 So for example, for Visual Editor, the review team would be the Visual
 Editor / Parsoid teams, Sue, me, Howie, Terry, and a minute-taker.

 I imagine the structure of the review roughly as follows, with a
 duration of about 2 1/2 hours divided into 25-30 minute blocks:

 - Brief team intro and recap of team's activities through the quarter,
 compared with goals
 - Drill into goals and targets: Did we achieve what we said we would?
 - Review of challenges, blockers and successes
 - Discussion of proposed changes (e.g. resourcing, targets) and other
 action items
 - Buffer time, debriefing

 Once again, the primary purpose of these reviews is to create improved
 structures for internal accountability, escalation points in cases
 where serious changes are necessary, and transparency to the world.

 In addition to these priority initiatives, my recommendation would be
 to conduct quarterly reviews for any activity that requires more than
 a set amount of resources (people/dollars). These additional reviews
 may however be conducted in a more lightweight manner and internally
 to the departments. We’re slowly getting into that habit in
 engineering.

 As we pilot this process, the format of the high priority reviews can
 help inform and support reviews across the organization.

 Feedback and questions are appreciated.

 All best,
 Erik

 [1] https://wikimediafoundation.org/wiki/Vote:Narrowing_Focus
 [2] https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings
 --
 Erik Möller
 VP of Engineering and Product Development, Wikimedia Foundation

 Support Free Knowledge: https://wikimediafoundation.org/wiki/Donate

 ___
 Wikimedia-l mailing list
 Wikimedia-l@lists.wikimedia.org
 Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l



-- 
Tilman Bayer
Senior Operations Analyst (Movement Communications)
Wikimedia Foundation

___
Wikimedia-l mailing list
Wikimedia-l@lists.wikimedia.org
Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l, 
mailto:wikimedia-l-requ...@lists.wikimedia.org?subject=unsubscribe

Re: [Wikimedia-l] Quarterly reviews of high priority WMF initiatives

2013-07-22 Thread Tilman Bayer
Minutes and slides from the second quarterly review meeting of the
VisualEditor and Parsoid team are now available at
https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews/VisualEditor-Parsoid/July_2013

On Wed, Dec 19, 2012 at 6:49 PM, Erik Moeller e...@wikimedia.org wrote:
 Hi folks,

 to increase accountability and create more opportunities for course
 corrections and resourcing adjustments as necessary, Sue's asked me
 and Howie Fung to set up a quarterly project evaluation process,
 starting with our highest priority initiatives. These are, according
 to Sue's narrowing focus recommendations which were approved by the
 Board [1]:

 - Visual Editor
 - Mobile (mobile contributions + Wikipedia Zero)
 - Editor Engagement (also known as the E2 and E3 teams)
 - Funds Dissemination Committe and expanded grant-making capacity

 I'm proposing the following initial schedule:

 January:
 - Editor Engagement Experiments

 February:
 - Visual Editor
 - Mobile (Contribs + Zero)

 March:
 - Editor Engagement Features (Echo, Flow projects)
 - Funds Dissemination Committee

 We’ll try doing this on the same day or adjacent to the monthly
 metrics meetings [2], since the team(s) will give a presentation on
 their recent progress, which will help set some context that would
 otherwise need to be covered in the quarterly review itself. This will
 also create open opportunities for feedback and questions.

 My goal is to do this in a manner where even though the quarterly
 review meetings themselves are internal, the outcomes are captured as
 meeting minutes and shared publicly, which is why I'm starting this
 discussion on a public list as well. I've created a wiki page here
 which we can use to discuss the concept further:

 https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews

 The internal review will, at minimum, include:

 Sue Gardner
 myself
 Howie Fung
 Team members and relevant director(s)
 Designated minute-taker

 So for example, for Visual Editor, the review team would be the Visual
 Editor / Parsoid teams, Sue, me, Howie, Terry, and a minute-taker.

 I imagine the structure of the review roughly as follows, with a
 duration of about 2 1/2 hours divided into 25-30 minute blocks:

 - Brief team intro and recap of team's activities through the quarter,
 compared with goals
 - Drill into goals and targets: Did we achieve what we said we would?
 - Review of challenges, blockers and successes
 - Discussion of proposed changes (e.g. resourcing, targets) and other
 action items
 - Buffer time, debriefing

 Once again, the primary purpose of these reviews is to create improved
 structures for internal accountability, escalation points in cases
 where serious changes are necessary, and transparency to the world.

 In addition to these priority initiatives, my recommendation would be
 to conduct quarterly reviews for any activity that requires more than
 a set amount of resources (people/dollars). These additional reviews
 may however be conducted in a more lightweight manner and internally
 to the departments. We’re slowly getting into that habit in
 engineering.

 As we pilot this process, the format of the high priority reviews can
 help inform and support reviews across the organization.

 Feedback and questions are appreciated.

 All best,
 Erik

 [1] https://wikimediafoundation.org/wiki/Vote:Narrowing_Focus
 [2] https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings
 --
 Erik Möller
 VP of Engineering and Product Development, Wikimedia Foundation

 Support Free Knowledge: https://wikimediafoundation.org/wiki/Donate

 ___
 Wikimedia-l mailing list
 Wikimedia-l@lists.wikimedia.org
 Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l



-- 
Tilman Bayer
Senior Operations Analyst (Movement Communications)
Wikimedia Foundation
IRC (Freenode): HaeB

___
Wikimedia-l mailing list
Wikimedia-l@lists.wikimedia.org
Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l, 
mailto:wikimedia-l-requ...@lists.wikimedia.org?subject=unsubscribe

Re: [Wikimedia-l] Quarterly reviews of high priority WMF initiatives

2013-07-03 Thread Tilman Bayer
Minutes and slides from the second quarterly review meeting of the
Wikipedia Zero team are now available at
https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews/Wikipedia_Zero/June_2013
.

On Wed, Dec 19, 2012 at 6:49 PM, Erik Moeller e...@wikimedia.org wrote:
 Hi folks,

 to increase accountability and create more opportunities for course
 corrections and resourcing adjustments as necessary, Sue's asked me
 and Howie Fung to set up a quarterly project evaluation process,
 starting with our highest priority initiatives. These are, according
 to Sue's narrowing focus recommendations which were approved by the
 Board [1]:

 - Visual Editor
 - Mobile (mobile contributions + Wikipedia Zero)
 - Editor Engagement (also known as the E2 and E3 teams)
 - Funds Dissemination Committe and expanded grant-making capacity

 I'm proposing the following initial schedule:

 January:
 - Editor Engagement Experiments

 February:
 - Visual Editor
 - Mobile (Contribs + Zero)

 March:
 - Editor Engagement Features (Echo, Flow projects)
 - Funds Dissemination Committee

 We’ll try doing this on the same day or adjacent to the monthly
 metrics meetings [2], since the team(s) will give a presentation on
 their recent progress, which will help set some context that would
 otherwise need to be covered in the quarterly review itself. This will
 also create open opportunities for feedback and questions.

 My goal is to do this in a manner where even though the quarterly
 review meetings themselves are internal, the outcomes are captured as
 meeting minutes and shared publicly, which is why I'm starting this
 discussion on a public list as well. I've created a wiki page here
 which we can use to discuss the concept further:

 https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews

 The internal review will, at minimum, include:

 Sue Gardner
 myself
 Howie Fung
 Team members and relevant director(s)
 Designated minute-taker

 So for example, for Visual Editor, the review team would be the Visual
 Editor / Parsoid teams, Sue, me, Howie, Terry, and a minute-taker.

 I imagine the structure of the review roughly as follows, with a
 duration of about 2 1/2 hours divided into 25-30 minute blocks:

 - Brief team intro and recap of team's activities through the quarter,
 compared with goals
 - Drill into goals and targets: Did we achieve what we said we would?
 - Review of challenges, blockers and successes
 - Discussion of proposed changes (e.g. resourcing, targets) and other
 action items
 - Buffer time, debriefing

 Once again, the primary purpose of these reviews is to create improved
 structures for internal accountability, escalation points in cases
 where serious changes are necessary, and transparency to the world.

 In addition to these priority initiatives, my recommendation would be
 to conduct quarterly reviews for any activity that requires more than
 a set amount of resources (people/dollars). These additional reviews
 may however be conducted in a more lightweight manner and internally
 to the departments. We’re slowly getting into that habit in
 engineering.

 As we pilot this process, the format of the high priority reviews can
 help inform and support reviews across the organization.

 Feedback and questions are appreciated.

 All best,
 Erik

 [1] https://wikimediafoundation.org/wiki/Vote:Narrowing_Focus
 [2] https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings
 --
 Erik Möller
 VP of Engineering and Product Development, Wikimedia Foundation

 Support Free Knowledge: https://wikimediafoundation.org/wiki/Donate

 ___
 Wikimedia-l mailing list
 Wikimedia-l@lists.wikimedia.org
 Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l



-- 
Tilman Bayer
Senior Operations Analyst (Movement Communications)
Wikimedia Foundation
IRC (Freenode): HaeB

___
Wikimedia-l mailing list
Wikimedia-l@lists.wikimedia.org
Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l, 
mailto:wikimedia-l-requ...@lists.wikimedia.org?subject=unsubscribe

Re: [Wikimedia-l] Quarterly reviews of high priority WMF initiatives

2013-07-03 Thread Haitham Shammaa
 Also, did Grants have a review recently?

Minutes of the Grantmaking quarterly review are avaliable at :

https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews/Grantmaking,_2013-05-15


*--*
*Haitham Shammaa*
*Wikimedia Foundation*

*Imagine a world in which every single human being can freely share in the
sum of all knowledge. *
*Click the edit button now, and help us make it a reality!*


From: Tilman Bayer tba...@wikimedia.org
 Date: Wed, Jul 3, 2013 at 12:42 AM
 Subject: Re: [Wikimedia-l] Quarterly reviews of high priority WMF
 initiatives
 To: Wikimedia Mailing List wikimedia-l@lists.wikimedia.org


 Minutes and slides from the second quarterly review meeting of the
 Wikipedia Zero team are now available at

 https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews/Wikipedia_Zero/June_2013
 .


 On Wed, Dec 19, 2012 at 6:49 PM, Erik Moeller e...@wikimedia.org wrote:
  Hi folks,
 
  to increase accountability and create more opportunities for course
  corrections and resourcing adjustments as necessary, Sue's asked me
  and Howie Fung to set up a quarterly project evaluation process,
  starting with our highest priority initiatives. These are, according
  to Sue's narrowing focus recommendations which were approved by the
  Board [1]:
 
  - Visual Editor
  - Mobile (mobile contributions + Wikipedia Zero)
  - Editor Engagement (also known as the E2 and E3 teams)
  - Funds Dissemination Committe and expanded grant-making capacity
 
  I'm proposing the following initial schedule:
 
  January:
  - Editor Engagement Experiments
 
  February:
  - Visual Editor
  - Mobile (Contribs + Zero)
 
  March:
  - Editor Engagement Features (Echo, Flow projects)
  - Funds Dissemination Committee
 
  We’ll try doing this on the same day or adjacent to the monthly
  metrics meetings [2], since the team(s) will give a presentation on
  their recent progress, which will help set some context that would
  otherwise need to be covered in the quarterly review itself. This will
  also create open opportunities for feedback and questions.
 
  My goal is to do this in a manner where even though the quarterly
  review meetings themselves are internal, the outcomes are captured as
  meeting minutes and shared publicly, which is why I'm starting this
  discussion on a public list as well. I've created a wiki page here
  which we can use to discuss the concept further:
 
 
 https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews
 
  The internal review will, at minimum, include:
 
  Sue Gardner
  myself
  Howie Fung
  Team members and relevant director(s)
  Designated minute-taker
 
  So for example, for Visual Editor, the review team would be the Visual
  Editor / Parsoid teams, Sue, me, Howie, Terry, and a minute-taker.
 
  I imagine the structure of the review roughly as follows, with a
  duration of about 2 1/2 hours divided into 25-30 minute blocks:
 
  - Brief team intro and recap of team's activities through the quarter,
  compared with goals
  - Drill into goals and targets: Did we achieve what we said we would?
  - Review of challenges, blockers and successes
  - Discussion of proposed changes (e.g. resourcing, targets) and other
  action items
  - Buffer time, debriefing
 
  Once again, the primary purpose of these reviews is to create improved
  structures for internal accountability, escalation points in cases
  where serious changes are necessary, and transparency to the world.
 
  In addition to these priority initiatives, my recommendation would be
  to conduct quarterly reviews for any activity that requires more than
  a set amount of resources (people/dollars). These additional reviews
  may however be conducted in a more lightweight manner and internally
  to the departments. We’re slowly getting into that habit in
  engineering.
 
  As we pilot this process, the format of the high priority reviews can
  help inform and support reviews across the organization.
 
  Feedback and questions are appreciated.
 
  All best,
  Erik
 
  [1] https://wikimediafoundation.org/wiki/Vote:Narrowing_Focus
  [2] https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings
  --
  Erik Möller
  VP of Engineering and Product Development, Wikimedia Foundation
 
  Support Free Knowledge: https://wikimediafoundation.org/wiki/Donate
 
  ___
  Wikimedia-l mailing list
  Wikimedia-l@lists.wikimedia.org
  Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l



 --
 Tilman Bayer
 Senior Operations Analyst (Movement Communications)
 Wikimedia Foundation
 IRC (Freenode): HaeB

 ___
 Wikimedia-l mailing list
 Wikimedia-l@lists.wikimedia.org
 Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l,
 mailto:wikimedia-l-requ...@lists.wikimedia.org?subject=unsubscribe


___
Wikimedia-l mailing list

Re: [Wikimedia-l] Quarterly reviews of high priority WMF initiatives

2013-05-27 Thread Tilman Bayer
On Sat, May 25, 2013 at 1:41 PM, ENWP Pine deyntest...@hotmail.com wrote:
 Tilman,

 Is there a schedule for these reviews on Meta?
None that I know of. (I'm sure you already found the link to the
parent page - 
https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews
- which has a list of past reviews.)

 Also, did Grants have a review recently?
Yes; I understand the minutes of the Grants team's quarterly review
will be posted shortly.

 Thanks,

 Pine

 ___
 Wikimedia-l mailing list
 Wikimedia-l@lists.wikimedia.org
 Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l



-- 
Tilman Bayer
Senior Operations Analyst (Movement Communications)
Wikimedia Foundation
IRC (Freenode): HaeB

___
Wikimedia-l mailing list
Wikimedia-l@lists.wikimedia.org
Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l


Re: [Wikimedia-l] Quarterly reviews of high priority WMF initiatives

2013-05-25 Thread ENWP Pine
Tilman,

Is there a schedule for these reviews on Meta? Also, did Grants have a review 
recently? 

Thanks,

Pine
  
___
Wikimedia-l mailing list
Wikimedia-l@lists.wikimedia.org
Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l


Re: [Wikimedia-l] Quarterly reviews of high priority WMF initiatives

2013-05-23 Thread Tilman Bayer
Minutes, pre-prepared notes and slides from the mid-year review
meeting of the Wikipedia Education Program team have now been posted
in a similar format at
https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews/Wikipedia_Education_Program/May_2013

On Wed, Dec 19, 2012 at 6:49 PM, Erik Moeller e...@wikimedia.org wrote:
 Hi folks,

 to increase accountability and create more opportunities for course
 corrections and resourcing adjustments as necessary, Sue's asked me
 and Howie Fung to set up a quarterly project evaluation process,
 starting with our highest priority initiatives. These are, according
 to Sue's narrowing focus recommendations which were approved by the
 Board [1]:

 - Visual Editor
 - Mobile (mobile contributions + Wikipedia Zero)
 - Editor Engagement (also known as the E2 and E3 teams)
 - Funds Dissemination Committe and expanded grant-making capacity

 I'm proposing the following initial schedule:

 January:
 - Editor Engagement Experiments

 February:
 - Visual Editor
 - Mobile (Contribs + Zero)

 March:
 - Editor Engagement Features (Echo, Flow projects)
 - Funds Dissemination Committee

 We’ll try doing this on the same day or adjacent to the monthly
 metrics meetings [2], since the team(s) will give a presentation on
 their recent progress, which will help set some context that would
 otherwise need to be covered in the quarterly review itself. This will
 also create open opportunities for feedback and questions.

 My goal is to do this in a manner where even though the quarterly
 review meetings themselves are internal, the outcomes are captured as
 meeting minutes and shared publicly, which is why I'm starting this
 discussion on a public list as well. I've created a wiki page here
 which we can use to discuss the concept further:

 https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews

 The internal review will, at minimum, include:

 Sue Gardner
 myself
 Howie Fung
 Team members and relevant director(s)
 Designated minute-taker

 So for example, for Visual Editor, the review team would be the Visual
 Editor / Parsoid teams, Sue, me, Howie, Terry, and a minute-taker.

 I imagine the structure of the review roughly as follows, with a
 duration of about 2 1/2 hours divided into 25-30 minute blocks:

 - Brief team intro and recap of team's activities through the quarter,
 compared with goals
 - Drill into goals and targets: Did we achieve what we said we would?
 - Review of challenges, blockers and successes
 - Discussion of proposed changes (e.g. resourcing, targets) and other
 action items
 - Buffer time, debriefing

 Once again, the primary purpose of these reviews is to create improved
 structures for internal accountability, escalation points in cases
 where serious changes are necessary, and transparency to the world.

 In addition to these priority initiatives, my recommendation would be
 to conduct quarterly reviews for any activity that requires more than
 a set amount of resources (people/dollars). These additional reviews
 may however be conducted in a more lightweight manner and internally
 to the departments. We’re slowly getting into that habit in
 engineering.

 As we pilot this process, the format of the high priority reviews can
 help inform and support reviews across the organization.

 Feedback and questions are appreciated.

 All best,
 Erik

 [1] https://wikimediafoundation.org/wiki/Vote:Narrowing_Focus
 [2] https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings
 --
 Erik Möller
 VP of Engineering and Product Development, Wikimedia Foundation

 Support Free Knowledge: https://wikimediafoundation.org/wiki/Donate

 ___
 Wikimedia-l mailing list
 Wikimedia-l@lists.wikimedia.org
 Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l



-- 
Tilman Bayer
Senior Operations Analyst (Movement Communications)
Wikimedia Foundation
IRC (Freenode): HaeB

___
Wikimedia-l mailing list
Wikimedia-l@lists.wikimedia.org
Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l


Re: [Wikimedia-l] Quarterly reviews of high priority WMF initiatives

2013-04-16 Thread Tilman Bayer
On Sun, Jan 20, 2013 at 2:34 PM, Steven Walling
steven.wall...@gmail.com wrote:
 On Wed, Dec 19, 2012 at 6:49 PM, Erik Moeller e...@wikimedia.org wrote:

 Hi folks,

 to increase accountability and create more opportunities for course
 corrections and resourcing adjustments as necessary, Sue's asked me
 and Howie Fung to set up a quarterly project evaluation process,
 starting with our highest priority initiatives. These are, according
 to Sue's narrowing focus recommendations which were approved by the
 Board [1]:

 - Visual Editor
 - Mobile (mobile contributions + Wikipedia Zero)
 - Editor Engagement (also known as the E2 and E3 teams)
 - Funds Dissemination Committe and expanded grant-making capacity

 I'm proposing the following initial schedule:

 January:
 - Editor Engagement Experiments

 February:
 - Visual Editor
 - Mobile (Contribs + Zero)

 March:
 - Editor Engagement Features (Echo, Flow projects)
 - Funds Dissemination Committee

 We’ll try doing this on the same day or adjacent to the monthly
 metrics meetings [2], since the team(s) will give a presentation on
 their recent progress, which will help set some context that would
 otherwise need to be covered in the quarterly review itself. This will
 also create open opportunities for feedback and questions.

 My goal is to do this in a manner where even though the quarterly
 review meetings themselves are internal, the outcomes are captured as
 meeting minutes and shared publicly, which is why I'm starting this
 discussion on a public list as well. I've created a wiki page here
 which we can use to discuss the concept further:


 https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews

 The internal review will, at minimum, include:

 Sue Gardner
 myself
 Howie Fung
 Team members and relevant director(s)
 Designated minute-taker

 So for example, for Visual Editor, the review team would be the Visual
 Editor / Parsoid teams, Sue, me, Howie, Terry, and a minute-taker.

 I imagine the structure of the review roughly as follows, with a
 duration of about 2 1/2 hours divided into 25-30 minute blocks:

 - Brief team intro and recap of team's activities through the quarter,
 compared with goals
 - Drill into goals and targets: Did we achieve what we said we would?
 - Review of challenges, blockers and successes
 - Discussion of proposed changes (e.g. resourcing, targets) and other
 action items
 - Buffer time, debriefing

 Once again, the primary purpose of these reviews is to create improved
 structures for internal accountability, escalation points in cases
 where serious changes are necessary, and transparency to the world.

 In addition to these priority initiatives, my recommendation would be
 to conduct quarterly reviews for any activity that requires more than
 a set amount of resources (people/dollars). These additional reviews
 may however be conducted in a more lightweight manner and internally
 to the departments. We’re slowly getting into that habit in
 engineering.

 As we pilot this process, the format of the high priority reviews can
 help inform and support reviews across the organization.

 Feedback and questions are appreciated.

 All best,
 Erik

 [1] https://wikimediafoundation.org/wiki/Vote:Narrowing_Focus
 [2] https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings
 --
 Erik Möller
 VP of Engineering and Product Development, Wikimedia Foundation

 Support Free Knowledge: https://wikimediafoundation.org/wiki/Donate

 ___
 Wikimedia-l mailing list
 Wikimedia-l@lists.wikimedia.org
 Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l


 Following up on this...

 The Editor Engagement Experiments team had the first one of these with Erik
 and Sue last Tuesday (the 15th). Tilman was there to take notes, and I
 published our slide deck, so there is a transcript and PDF to review for
 those interested at:
 https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews/Editor_engagement_experiments

 Erik will likely share some notes soon on how he and Sue want to rejigger
 the meeting structure based on this first try. Overall it was helpful for
 all parties, but obviously in a meeting this long and covering this kind of
 material, adjustments can and should be made.

 Steven

The minutes and slides from the E3 team's second quarterly review
meeting can now be found at
https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews/Editor_engagement_experiments/2013-04-12
.

-- 
Tilman Bayer
Senior Operations Analyst (Movement Communications)
Wikimedia Foundation
IRC (Freenode): HaeB

___
Wikimedia-l mailing list
Wikimedia-l@lists.wikimedia.org
Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l


Re: [Wikimedia-l] Quarterly reviews of high priority WMF initiatives

2013-04-01 Thread Tilman Bayer
Minutes and slides from the recent Quarterly Review meeting of the
VisualEditor and Parsoid team are now available at
https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews/VisualEditor-Parsoid,_2013-03-27
 .


On Wed, Dec 19, 2012 at 6:49 PM, Erik Moeller e...@wikimedia.org wrote:

 Hi folks,

 to increase accountability and create more opportunities for course
 corrections and resourcing adjustments as necessary, Sue's asked me
 and Howie Fung to set up a quarterly project evaluation process,
 starting with our highest priority initiatives. These are, according
 to Sue's narrowing focus recommendations which were approved by the
 Board [1]:

 - Visual Editor
 - Mobile (mobile contributions + Wikipedia Zero)
 - Editor Engagement (also known as the E2 and E3 teams)
 - Funds Dissemination Committe and expanded grant-making capacity

 I'm proposing the following initial schedule:

 January:
 - Editor Engagement Experiments

 February:
 - Visual Editor
 - Mobile (Contribs + Zero)

 March:
 - Editor Engagement Features (Echo, Flow projects)
 - Funds Dissemination Committee

 We’ll try doing this on the same day or adjacent to the monthly
 metrics meetings [2], since the team(s) will give a presentation on
 their recent progress, which will help set some context that would
 otherwise need to be covered in the quarterly review itself. This will
 also create open opportunities for feedback and questions.

 My goal is to do this in a manner where even though the quarterly
 review meetings themselves are internal, the outcomes are captured as
 meeting minutes and shared publicly, which is why I'm starting this
 discussion on a public list as well. I've created a wiki page here
 which we can use to discuss the concept further:


 https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews

 The internal review will, at minimum, include:

 Sue Gardner
 myself
 Howie Fung
 Team members and relevant director(s)
 Designated minute-taker

 So for example, for Visual Editor, the review team would be the Visual
 Editor / Parsoid teams, Sue, me, Howie, Terry, and a minute-taker.

 I imagine the structure of the review roughly as follows, with a
 duration of about 2 1/2 hours divided into 25-30 minute blocks:

 - Brief team intro and recap of team's activities through the quarter,
 compared with goals
 - Drill into goals and targets: Did we achieve what we said we would?
 - Review of challenges, blockers and successes
 - Discussion of proposed changes (e.g. resourcing, targets) and other
 action items
 - Buffer time, debriefing

 Once again, the primary purpose of these reviews is to create improved
 structures for internal accountability, escalation points in cases
 where serious changes are necessary, and transparency to the world.

 In addition to these priority initiatives, my recommendation would be
 to conduct quarterly reviews for any activity that requires more than
 a set amount of resources (people/dollars). These additional reviews
 may however be conducted in a more lightweight manner and internally
 to the departments. We’re slowly getting into that habit in
 engineering.

 As we pilot this process, the format of the high priority reviews can
 help inform and support reviews across the organization.

 Feedback and questions are appreciated.

 All best,
 Erik

 [1] https://wikimediafoundation.org/wiki/Vote:Narrowing_Focus
 [2] https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings
 --
 Erik Möller
 VP of Engineering and Product Development, Wikimedia Foundation

 Support Free Knowledge: https://wikimediafoundation.org/wiki/Donate

 ___
 Wikimedia-l mailing list
 Wikimedia-l@lists.wikimedia.org
 Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l




-- 
Tilman Bayer
Senior Operations Analyst (Movement Communications)
Wikimedia Foundation
IRC (Freenode): HaeB
___
Wikimedia-l mailing list
Wikimedia-l@lists.wikimedia.org
Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l


Re: [Wikimedia-l] Quarterly reviews of high priority WMF initiatives

2013-03-24 Thread ENWP Pine
Awesome. Thank you, Maryana and Steven!

Pine
  
___
Wikimedia-l mailing list
Wikimedia-l@lists.wikimedia.org
Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l


Re: [Wikimedia-l] Quarterly reviews of high priority WMF initiatives

2013-03-23 Thread ENWP Pine
Tilman,

Thanks, it's great to see the momentum here in Mobile Contributions.

Was there any discussion about how to convert the selfies uploaders and 
people who sign up for the watchlist
feature into more active contributors? This seems like an opportunity to make 
progress on what I think should
be the #1 WMF-wide priority right now, which making progress on the active 
contributor statistics.

Pine



--

Date: Fri, 22 Mar 2013 16:32:54 -0700
From: Tilman Bayer tba...@wikimedia.org
To: Wikimedia Mailing List wikimedia-l@lists.wikimedia.org
Subject: Re: [Wikimedia-l] Quarterly reviews of high priority WMF
initiatives
Message-ID:
CAPDdKA6M+PLM7OHfJNKQcNVp_cS0EUEeBMATjvS=jjydv01...@mail.gmail.com
Content-Type: text/plain; charset=windows-1252
 
Minutes and links to slides from this week's Quarterly Review meeting
of the mobile contributions team have been posted at
https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews/Mobile_contributions,_2013-03-18
 
 
On Wed, Dec 19, 2012 at 6:49 PM, Erik Moeller e...@wikimedia.org wrote:
 Hi folks,

 to increase accountability and create more opportunities for course
 corrections and resourcing adjustments as necessary, Sue's asked me
 and Howie Fung to set up a quarterly project evaluation process,
 starting with our highest priority initiatives. These are, according
 to Sue's narrowing focus recommendations which were approved by the
 Board [1]:

 - Visual Editor
 - Mobile (mobile contributions + Wikipedia Zero)
 - Editor Engagement (also known as the E2 and E3 teams)
 - Funds Dissemination Committe and expanded grant-making capacity

 I'm proposing the following initial schedule:

 January:
 - Editor Engagement Experiments

 February:
 - Visual Editor
 - Mobile (Contribs + Zero)

 March:
 - Editor Engagement Features (Echo, Flow projects)
 - Funds Dissemination Committee

 We’ll try doing this on the same day or adjacent to the monthly
 metrics meetings [2], since the team(s) will give a presentation on
 their recent progress, which will help set some context that would
 otherwise need to be covered in the quarterly review itself. This will
 also create open opportunities for feedback and questions.

 My goal is to do this in a manner where even though the quarterly
 review meetings themselves are internal, the outcomes are captured as
 meeting minutes and shared publicly, which is why I'm starting this
 discussion on a public list as well. I've created a wiki page here
 which we can use to discuss the concept further:

 https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews

 The internal review will, at minimum, include:

 Sue Gardner
 myself
 Howie Fung
 Team members and relevant director(s)
 Designated minute-taker

 So for example, for Visual Editor, the review team would be the Visual
 Editor / Parsoid teams, Sue, me, Howie, Terry, and a minute-taker.

 I imagine the structure of the review roughly as follows, with a
 duration of about 2 1/2 hours divided into 25-30 minute blocks:

 - Brief team intro and recap of team's activities through the quarter,
 compared with goals
 - Drill into goals and targets: Did we achieve what we said we would?
 - Review of challenges, blockers and successes
 - Discussion of proposed changes (e.g. resourcing, targets) and other
 action items
 - Buffer time, debriefing

 Once again, the primary purpose of these reviews is to create improved
 structures for internal accountability, escalation points in cases
 where serious changes are necessary, and transparency to the world.

 In addition to these priority initiatives, my recommendation would be
 to conduct quarterly reviews for any activity that requires more than
 a set amount of resources (people/dollars). These additional reviews
 may however be conducted in a more lightweight manner and internally
 to the departments. We’re slowly getting into that habit in
 engineering.

 As we pilot this process, the format of the high priority reviews can
 help inform and support reviews across the organization.

 Feedback and questions are appreciated.

 All best,
 Erik

 [1] https://wikimediafoundation.org/wiki/Vote:Narrowing_Focus
 [2] https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings
 --
 Erik Möller
 VP of Engineering and Product Development, Wikimedia Foundation

 Support Free Knowledge: https://wikimediafoundation.org/wiki/Donate

 ___
 Wikimedia-l mailing list
 Wikimedia-l@lists.wikimedia.org
 Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l
 
 
 
-- 
Tilman Bayer
Senior Operations Analyst (Movement Communications)
Wikimedia Foundation
IRC (Freenode): HaeB  
___
Wikimedia-l mailing list
Wikimedia-l@lists.wikimedia.org
Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l


Re: [Wikimedia-l] Quarterly reviews of high priority WMF initiatives

2013-03-23 Thread Steven Walling
On Saturday, March 23, 2013, ENWP Pine wrote:

 Tilman,

 Thanks, it's great to see the momentum here in Mobile Contributions.

 Was there any discussion about how to convert the selfies uploaders and
 people who sign up for the watchlist
 feature into more active contributors? This seems like an opportunity to
 make progress on what I think should
 be the #1 WMF-wide priority right now, which making progress on the active
 contributor statistics.

 Pine


This is very interesting to all of us on the Product team, because we think
a lot about how to convert high quality contributors on every feature,
mobile and desktop.

Converting users who signed up with one set of intentions to do something
even slightly different can be a very difficult thing. This is why, for
example, AFT5 users who accept a call to sign up edit at dismal rates
compared to natural converts to registered editing. In product
development we ideally prefer to think of ways to attract and support users
who are interested in a useful activity, rather than say, try to turn
readers who want a reading list into editors using a watchlist. Making that
conceptual shift is a big ask for people with no prior experience editing.

The selfies group is an interesting example to talk about because these
people clearly are open to contributing. I would venture that they just
have the wrong mental model for what a useful photo is. Maryana and the
design team have been working on a mobile intro to contributing photos
that I think is a really great example of how to not just build in the base
functionality of something like mobile photo uploads, but actually try to
target new users who have the right motivations and concepts about the
feature. I'm sure Maryana, Vibha, and Munaf could expand on this more. :-)



 --

 Date: Fri, 22 Mar 2013 16:32:54 -0700
 From: Tilman Bayer tba...@wikimedia.org javascript:;
 To: Wikimedia Mailing List wikimedia-l@lists.wikimedia.org javascript:;
 
 Subject: Re: [Wikimedia-l] Quarterly reviews of high priority WMF
 initiatives
 Message-ID:
 CAPDdKA6M+PLM7OHfJNKQcNVp_cS0EUEeBMATjvS=
 jjydv01...@mail.gmail.com javascript:;
 Content-Type: text/plain; charset=windows-1252

 Minutes and links to slides from this week's Quarterly Review meeting
 of the mobile contributions team have been posted at

 https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews/Mobile_contributions,_2013-03-18


 On Wed, Dec 19, 2012 at 6:49 PM, Erik Moeller e...@wikimedia.org wrote:
  Hi folks,
 
  to increase accountability and create more opportunities for course
  corrections and resourcing adjustments as necessary, Sue's asked me
  and Howie Fung to set up a quarterly project evaluation process,
  starting with our highest priority initiatives. These are, according
  to Sue's narrowing focus recommendations which were approved by the
  Board [1]:
 
  - Visual Editor
  - Mobile (mobile contributions + Wikipedia Zero)
  - Editor Engagement (also known as the E2 and E3 teams)
  - Funds Dissemination Committe and expanded grant-making capacity
 
  I'm proposing the following initial schedule:
 
  January:
  - Editor Engagement Experiments
 
  February:
  - Visual Editor
  - Mobile (Contribs + Zero)
 
  March:
  - Editor Engagement Features (Echo, Flow projects)
  - Funds Dissemination Committee
 
  We’ll try doing this on the same day or adjacent to the monthly
  metrics meetings [2], since the team(s) will give a presentation on
  their recent progress, which will help set some context that would
  otherwise need to be covered in the quarterly review itself. This will
  also create open opportunities for feedback and questions.
 
  My goal is to do this in a manner where even though the quarterly
  review meetings themselves are internal, the outcomes are captured as
  meeting minutes and shared publicly, which is why I'm starting this
  discussion on a public list as well. I've created a wiki page here
  which we can use to discuss the concept further:
 
 
 https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews
 
  The internal review will, at minimum, include:
 
  Sue Gardner
  myself
  Howie Fung
  Team members and relevant director(s)
  Designated minute-taker
 
  So for example, for Visual Editor, the review team would be the Visual
  Editor / Parsoid teams, Sue, me, Howie, Terry, and a minute-taker.
 
  I imagine the structure of the review roughly as follows, with a
  duration of about 2 1/2 hours divided into 25-30 minute blocks:
 
  - Brief team intro and recap of team's activities through the quarter,
  compared with goals
  - Drill into goals and targets: Did we achieve what we said we would?
  - Review of challenges, blockers and successes
  - Discussion of proposed changes (e.g. resourcing, targets) and other
  action items
  - Buffer time, debriefing
 
  Once again, the primary purpose of these reviews is to create improved
  structures for internal accountability

Re: [Wikimedia-l] Quarterly reviews of high priority WMF initiatives

2013-03-22 Thread Tilman Bayer
Minutes and links to slides from this week's Quarterly Review meeting
of the mobile contributions team have been posted at
https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews/Mobile_contributions,_2013-03-18


On Wed, Dec 19, 2012 at 6:49 PM, Erik Moeller e...@wikimedia.org wrote:
 Hi folks,

 to increase accountability and create more opportunities for course
 corrections and resourcing adjustments as necessary, Sue's asked me
 and Howie Fung to set up a quarterly project evaluation process,
 starting with our highest priority initiatives. These are, according
 to Sue's narrowing focus recommendations which were approved by the
 Board [1]:

 - Visual Editor
 - Mobile (mobile contributions + Wikipedia Zero)
 - Editor Engagement (also known as the E2 and E3 teams)
 - Funds Dissemination Committe and expanded grant-making capacity

 I'm proposing the following initial schedule:

 January:
 - Editor Engagement Experiments

 February:
 - Visual Editor
 - Mobile (Contribs + Zero)

 March:
 - Editor Engagement Features (Echo, Flow projects)
 - Funds Dissemination Committee

 We’ll try doing this on the same day or adjacent to the monthly
 metrics meetings [2], since the team(s) will give a presentation on
 their recent progress, which will help set some context that would
 otherwise need to be covered in the quarterly review itself. This will
 also create open opportunities for feedback and questions.

 My goal is to do this in a manner where even though the quarterly
 review meetings themselves are internal, the outcomes are captured as
 meeting minutes and shared publicly, which is why I'm starting this
 discussion on a public list as well. I've created a wiki page here
 which we can use to discuss the concept further:

 https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews

 The internal review will, at minimum, include:

 Sue Gardner
 myself
 Howie Fung
 Team members and relevant director(s)
 Designated minute-taker

 So for example, for Visual Editor, the review team would be the Visual
 Editor / Parsoid teams, Sue, me, Howie, Terry, and a minute-taker.

 I imagine the structure of the review roughly as follows, with a
 duration of about 2 1/2 hours divided into 25-30 minute blocks:

 - Brief team intro and recap of team's activities through the quarter,
 compared with goals
 - Drill into goals and targets: Did we achieve what we said we would?
 - Review of challenges, blockers and successes
 - Discussion of proposed changes (e.g. resourcing, targets) and other
 action items
 - Buffer time, debriefing

 Once again, the primary purpose of these reviews is to create improved
 structures for internal accountability, escalation points in cases
 where serious changes are necessary, and transparency to the world.

 In addition to these priority initiatives, my recommendation would be
 to conduct quarterly reviews for any activity that requires more than
 a set amount of resources (people/dollars). These additional reviews
 may however be conducted in a more lightweight manner and internally
 to the departments. We’re slowly getting into that habit in
 engineering.

 As we pilot this process, the format of the high priority reviews can
 help inform and support reviews across the organization.

 Feedback and questions are appreciated.

 All best,
 Erik

 [1] https://wikimediafoundation.org/wiki/Vote:Narrowing_Focus
 [2] https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings
 --
 Erik Möller
 VP of Engineering and Product Development, Wikimedia Foundation

 Support Free Knowledge: https://wikimediafoundation.org/wiki/Donate

 ___
 Wikimedia-l mailing list
 Wikimedia-l@lists.wikimedia.org
 Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l



-- 
Tilman Bayer
Senior Operations Analyst (Movement Communications)
Wikimedia Foundation
IRC (Freenode): HaeB

___
Wikimedia-l mailing list
Wikimedia-l@lists.wikimedia.org
Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l


Re: [Wikimedia-l] Quarterly reviews of high priority WMF initiatives

2013-02-25 Thread Tilman Bayer
Minutes and slides from the second Quarterly Review meeting, this time
with the Wikipedia Zero team, can now be found at:

https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews/Wikipedia_Zero,_2013-02-20

On Wed, Dec 19, 2012 at 6:49 PM, Erik Moeller e...@wikimedia.org wrote:
 Hi folks,

 to increase accountability and create more opportunities for course
 corrections and resourcing adjustments as necessary, Sue's asked me
 and Howie Fung to set up a quarterly project evaluation process,
 starting with our highest priority initiatives. These are, according
 to Sue's narrowing focus recommendations which were approved by the
 Board [1]:

 - Visual Editor
 - Mobile (mobile contributions + Wikipedia Zero)
 - Editor Engagement (also known as the E2 and E3 teams)
 - Funds Dissemination Committe and expanded grant-making capacity

 I'm proposing the following initial schedule:

 January:
 - Editor Engagement Experiments

 February:
 - Visual Editor
 - Mobile (Contribs + Zero)

 March:
 - Editor Engagement Features (Echo, Flow projects)
 - Funds Dissemination Committee

 We’ll try doing this on the same day or adjacent to the monthly
 metrics meetings [2], since the team(s) will give a presentation on
 their recent progress, which will help set some context that would
 otherwise need to be covered in the quarterly review itself. This will
 also create open opportunities for feedback and questions.

 My goal is to do this in a manner where even though the quarterly
 review meetings themselves are internal, the outcomes are captured as
 meeting minutes and shared publicly, which is why I'm starting this
 discussion on a public list as well. I've created a wiki page here
 which we can use to discuss the concept further:

 https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews

 The internal review will, at minimum, include:

 Sue Gardner
 myself
 Howie Fung
 Team members and relevant director(s)
 Designated minute-taker

 So for example, for Visual Editor, the review team would be the Visual
 Editor / Parsoid teams, Sue, me, Howie, Terry, and a minute-taker.

 I imagine the structure of the review roughly as follows, with a
 duration of about 2 1/2 hours divided into 25-30 minute blocks:

 - Brief team intro and recap of team's activities through the quarter,
 compared with goals
 - Drill into goals and targets: Did we achieve what we said we would?
 - Review of challenges, blockers and successes
 - Discussion of proposed changes (e.g. resourcing, targets) and other
 action items
 - Buffer time, debriefing

 Once again, the primary purpose of these reviews is to create improved
 structures for internal accountability, escalation points in cases
 where serious changes are necessary, and transparency to the world.

 In addition to these priority initiatives, my recommendation would be
 to conduct quarterly reviews for any activity that requires more than
 a set amount of resources (people/dollars). These additional reviews
 may however be conducted in a more lightweight manner and internally
 to the departments. We’re slowly getting into that habit in
 engineering.

 As we pilot this process, the format of the high priority reviews can
 help inform and support reviews across the organization.

 Feedback and questions are appreciated.

 All best,
 Erik

 [1] https://wikimediafoundation.org/wiki/Vote:Narrowing_Focus
 [2] https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings
 --
 Erik Möller
 VP of Engineering and Product Development, Wikimedia Foundation

 Support Free Knowledge: https://wikimediafoundation.org/wiki/Donate

 ___
 Wikimedia-l mailing list
 Wikimedia-l@lists.wikimedia.org
 Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l



-- 
Tilman Bayer
Senior Operations Analyst (Movement Communications)
Wikimedia Foundation
IRC (Freenode): HaeB

___
Wikimedia-l mailing list
Wikimedia-l@lists.wikimedia.org
Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l


Re: [Wikimedia-l] Quarterly reviews of high priority WMF initiatives

2013-01-21 Thread Federico Leva (Nemo)

Steven Walling, 20/01/2013 23:34:

Following up on this...

The Editor Engagement Experiments team had the first one of these with Erik
and Sue last Tuesday (the 15th). Tilman was there to take notes, and I
published our slide deck, so there is a transcript and PDF to review for
those interested at:
https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews/Editor_engagement_experiments

Erik will likely share some notes soon on how he and Sue want to rejigger
the meeting structure based on this first try. Overall it was helpful for
all parties, but obviously in a meeting this long and covering this kind of
material, adjustments can and should be made.


Thanks, I think it's useful as a summary of the past activities (among 
other things).
I asked a question on talk: maybe the answer is already in Erik's 
keyboard (Howie's summary partially answered me), or maybe not.


Nemo

___
Wikimedia-l mailing list
Wikimedia-l@lists.wikimedia.org
Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l


Re: [Wikimedia-l] Quarterly reviews of high priority WMF initiatives

2013-01-20 Thread Steven Walling
On Wed, Dec 19, 2012 at 6:49 PM, Erik Moeller e...@wikimedia.org wrote:

 Hi folks,

 to increase accountability and create more opportunities for course
 corrections and resourcing adjustments as necessary, Sue's asked me
 and Howie Fung to set up a quarterly project evaluation process,
 starting with our highest priority initiatives. These are, according
 to Sue's narrowing focus recommendations which were approved by the
 Board [1]:

 - Visual Editor
 - Mobile (mobile contributions + Wikipedia Zero)
 - Editor Engagement (also known as the E2 and E3 teams)
 - Funds Dissemination Committe and expanded grant-making capacity

 I'm proposing the following initial schedule:

 January:
 - Editor Engagement Experiments

 February:
 - Visual Editor
 - Mobile (Contribs + Zero)

 March:
 - Editor Engagement Features (Echo, Flow projects)
 - Funds Dissemination Committee

 We’ll try doing this on the same day or adjacent to the monthly
 metrics meetings [2], since the team(s) will give a presentation on
 their recent progress, which will help set some context that would
 otherwise need to be covered in the quarterly review itself. This will
 also create open opportunities for feedback and questions.

 My goal is to do this in a manner where even though the quarterly
 review meetings themselves are internal, the outcomes are captured as
 meeting minutes and shared publicly, which is why I'm starting this
 discussion on a public list as well. I've created a wiki page here
 which we can use to discuss the concept further:


 https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews

 The internal review will, at minimum, include:

 Sue Gardner
 myself
 Howie Fung
 Team members and relevant director(s)
 Designated minute-taker

 So for example, for Visual Editor, the review team would be the Visual
 Editor / Parsoid teams, Sue, me, Howie, Terry, and a minute-taker.

 I imagine the structure of the review roughly as follows, with a
 duration of about 2 1/2 hours divided into 25-30 minute blocks:

 - Brief team intro and recap of team's activities through the quarter,
 compared with goals
 - Drill into goals and targets: Did we achieve what we said we would?
 - Review of challenges, blockers and successes
 - Discussion of proposed changes (e.g. resourcing, targets) and other
 action items
 - Buffer time, debriefing

 Once again, the primary purpose of these reviews is to create improved
 structures for internal accountability, escalation points in cases
 where serious changes are necessary, and transparency to the world.

 In addition to these priority initiatives, my recommendation would be
 to conduct quarterly reviews for any activity that requires more than
 a set amount of resources (people/dollars). These additional reviews
 may however be conducted in a more lightweight manner and internally
 to the departments. We’re slowly getting into that habit in
 engineering.

 As we pilot this process, the format of the high priority reviews can
 help inform and support reviews across the organization.

 Feedback and questions are appreciated.

 All best,
 Erik

 [1] https://wikimediafoundation.org/wiki/Vote:Narrowing_Focus
 [2] https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings
 --
 Erik Möller
 VP of Engineering and Product Development, Wikimedia Foundation

 Support Free Knowledge: https://wikimediafoundation.org/wiki/Donate

 ___
 Wikimedia-l mailing list
 Wikimedia-l@lists.wikimedia.org
 Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l


Following up on this...

The Editor Engagement Experiments team had the first one of these with Erik
and Sue last Tuesday (the 15th). Tilman was there to take notes, and I
published our slide deck, so there is a transcript and PDF to review for
those interested at:
https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews/Editor_engagement_experiments

Erik will likely share some notes soon on how he and Sue want to rejigger
the meeting structure based on this first try. Overall it was helpful for
all parties, but obviously in a meeting this long and covering this kind of
material, adjustments can and should be made.

Steven
___
Wikimedia-l mailing list
Wikimedia-l@lists.wikimedia.org
Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l


Re: [Wikimedia-l] Quarterly reviews of high priority WMF initiatives

2012-12-21 Thread ENWP Pine
Eric,

This is great. I think this initiative may lead to benefits on multiple fronts. 
Thank you for this good news!

Cheers,

Pine
  
___
Wikimedia-l mailing list
Wikimedia-l@lists.wikimedia.org
Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l


Re: [Wikimedia-l] Quarterly reviews of high priority WMF initiatives

2012-12-19 Thread Steven Walling
On Wed, Dec 19, 2012 at 6:49 PM, Erik Moeller e...@wikimedia.org wrote:

 Hi folks,

 to increase accountability and create more opportunities for course
 corrections and resourcing adjustments as necessary, Sue's asked me
 and Howie Fung to set up a quarterly project evaluation process,
 starting with our highest priority initiatives. These are, according
 to Sue's narrowing focus recommendations which were approved by the
 Board [1]:

 - Visual Editor
 - Mobile (mobile contributions + Wikipedia Zero)
 - Editor Engagement (also known as the E2 and E3 teams)
 - Funds Dissemination Committe and expanded grant-making capacity

 I'm proposing the following initial schedule:

 January:
 - Editor Engagement Experiments

 February:
 - Visual Editor
 - Mobile (Contribs + Zero)

 March:
 - Editor Engagement Features (Echo, Flow projects)
 - Funds Dissemination Committee


We've been talking about this on the Editor Engagement Experiments team,
and within the wider product group in WMF engineering, for at least a
couple weeks now. I just wanted to say that this is a great step forward,
and that the E3 team is quite happy to be first in line. It's great to have
a chance to put our experimental data and analysis in front of both the
people doing the review, and anyone who might read the public notes. An
enormous amount of work goes in to data collection and the production of
reliable, understandable results, so it's good to have another venue to
discuss it.


 We’ll try doing this on the same day or adjacent to the monthly
 metrics meetings [2], since the team(s) will give a presentation on
 their recent progress, which will help set some context that would
 otherwise need to be covered in the quarterly review itself. This will
 also create open opportunities for feedback and questions.

 My goal is to do this in a manner where even though the quarterly
 review meetings themselves are internal, the outcomes are captured as
 meeting minutes and shared publicly, which is why I'm starting this
 discussion on a public list as well. I've created a wiki page here
 which we can use to discuss the concept further:


 https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings/Quarterly_reviews

 The internal review will, at minimum, include:

 Sue Gardner
 myself
 Howie Fung
 Team members and relevant director(s)
 Designated minute-taker

 So for example, for Visual Editor, the review team would be the Visual
 Editor / Parsoid teams, Sue, me, Howie, Terry, and a minute-taker.

 I imagine the structure of the review roughly as follows, with a
 duration of about 2 1/2 hours divided into 25-30 minute blocks:

 - Brief team intro and recap of team's activities through the quarter,
 compared with goals
 - Drill into goals and targets: Did we achieve what we said we would?
 - Review of challenges, blockers and successes
 - Discussion of proposed changes (e.g. resourcing, targets) and other
 action items
 - Buffer time, debriefing


One quick item of clarification here Erik: does Discussion of proposed
changes mean proposals by the team, or proposals by those on the review
panel?



 Once again, the primary purpose of these reviews is to create improved
 structures for internal accountability, escalation points in cases
 where serious changes are necessary, and transparency to the world.

 In addition to these priority initiatives, my recommendation would be
 to conduct quarterly reviews for any activity that requires more than
 a set amount of resources (people/dollars). These additional reviews
 may however be conducted in a more lightweight manner and internally
 to the departments. We’re slowly getting into that habit in
 engineering.

 As we pilot this process, the format of the high priority reviews can
 help inform and support reviews across the organization.

 Feedback and questions are appreciated.

 All best,
 Erik

 [1] https://wikimediafoundation.org/wiki/Vote:Narrowing_Focus
 [2] https://meta.wikimedia.org/wiki/Metrics_and_activities_meetings
 --
 Erik Möller
 VP of Engineering and Product Development, Wikimedia Foundation

 Support Free Knowledge: https://wikimediafoundation.org/wiki/Donate

 ___
 Wikimedia-l mailing list
 Wikimedia-l@lists.wikimedia.org
 Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l

___
Wikimedia-l mailing list
Wikimedia-l@lists.wikimedia.org
Unsubscribe: https://lists.wikimedia.org/mailman/listinfo/wikimedia-l