Hello Sprinklerforum, I am looking for ways to put longitudinal bracing on a straight run of 6" Schedule 40 pipe that can expand or contract About 5" with a temperature swing from 40 degrees to 100 degrees. This is a 1400' durn near straight run. I am looking at using a Metraflex Building Separation loop for an expansion loop.
-- Best regards, Charles Thurston Coastal Fire Protection mailto:[email protected] _______________________________________________ Sprinklerforum mailing list [email protected] http://fireball.firesprinkler.org/mailman/listinfo/sprinklerforum For Technical Assistance, send an email to: [email protected] To Unsubscribe, send an email to:[email protected] (Put the word unsubscribe in the subject field)
