Hello Sprinklerforum,

  I am looking for ways to put longitudinal bracing on a straight run of 6" 
Schedule 40 pipe that can expand or contract About 5" with a temperature swing 
from 40 degrees to 100 degrees. This is a 1400' durn near straight run. I am 
looking at using a Metraflex Building Separation loop for an expansion loop.

-- 
Best regards,
Charles Thurston
Coastal Fire Protection                          mailto:[email protected]

_______________________________________________
Sprinklerforum mailing list
[email protected]
http://fireball.firesprinkler.org/mailman/listinfo/sprinklerforum

For Technical Assistance, send an email to: [email protected]

To Unsubscribe, send an email to:[email protected]
(Put the word unsubscribe in the subject field)

Reply via email to