1400' of 6" 40!  Ouch, my back...

Hello Sprinklerforum,

  I am looking for ways to put longitudinal bracing on a straight run of 6"
Schedule 40 pipe that can expand or contract About 5" with a temperature
swing from 40 degrees to 100 degrees. This is a 1400' durn near straight
run. I am looking at using a Metraflex Building Separation loop for an
expansion loop.

-- 
Best regards,
Charles Thurston

_______________________________________________
Sprinklerforum mailing list
[email protected]
http://fireball.firesprinkler.org/mailman/listinfo/sprinklerforum

For Technical Assistance, send an email to: [email protected]

To Unsubscribe, send an email to:[email protected]
(Put the word unsubscribe in the subject field)

Reply via email to