This may be a good application for cable bracing. Contact Loos Co. (www.earthquakebrace.com) and pose the question to them.
At 06:57 PM 7/1/2010, you wrote: >Hello Sprinklerforum, > > I am looking for ways to put longitudinal bracing on a straight > run of 6" Schedule 40 pipe that can expand or contract About 5" > with a temperature swing from 40 degrees to 100 degrees. This is a > 1400' durn near straight run. I am looking at using a Metraflex > Building Separation loop for an expansion loop. > >-- >Best regards, >Charles Thurston >Coastal Fire Protection mailto:[email protected] > >_______________________________________________ >Sprinklerforum mailing list >[email protected] >http://fireball.firesprinkler.org/mailman/listinfo/sprinklerforum > >For Technical Assistance, send an email to: [email protected] > >To Unsubscribe, send an email to:[email protected] >(Put the word unsubscribe in the subject field) Todd G. Williams, PE Fire Protection Design/Consulting Stonington, CT 860.535.2080 www.fpdc.com _______________________________________________ Sprinklerforum mailing list [email protected] http://fireball.firesprinkler.org/mailman/listinfo/sprinklerforum For Technical Assistance, send an email to: [email protected] To Unsubscribe, send an email to:[email protected] (Put the word unsubscribe in the subject field)
