IBC 2009/2012 - 403.3.1 Buildings in excess of 420 feet in height. Jack Fairchild
-----Original Message----- From: Sprinklerforum [mailto:[email protected]] On Behalf Of Dale Wingard Sent: Friday, March 20, 2015 11:45 AM To: '[email protected]' Subject: RE: Floor Control Stations Jeremy, I believe that is just a Marriott requirement. Dale F. Wingard SET -----Original Message----- From: Sprinklerforum [mailto:[email protected]] On Behalf Of Jeremy Frazier Sent: Friday, March 20, 2015 10:38 AM To: [email protected] Subject: Floor Control Stations Where in NFPA/IBC does it say that if you have 2 standpipes, your sprinkler system should connect to both standpipes? I've looked through 14 (2010),13 (2010) and IBC (2009) and I have not found anything requiring it. Is this one of those things like electrical rooms with 2 penetrations or is there and actual code? Jeremy Frazier P:571-931-1004 F:571-931-1010 _______________________________________________ Sprinklerforum mailing list [email protected] http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org _______________________________________________ Sprinklerforum mailing list [email protected] http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org _______________________________________________ Sprinklerforum mailing list [email protected] http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org
