That is a totally different animal then. If the builder changes the parameters, then he pays. At least in a perfect world it would be, but we know that won't happen.

Travis Mack, SET
MFP Design, LLC
2508 E Lodgepole Drive
Gilbert, AZ 85298
480-505-9271
fax: 866-430-6107
email:[email protected]

http://www.mfpdesign.com
https://www.facebook.com/pages/MFP-Design-LLC/92218417692
Send large files to us via: https://www.hightail.com/u/MFPDesign
LinkedIn: https://www.linkedin.com/in/travismack

On 4/13/2016 10:50 AM, Brian Harris wrote:
building inspector said he wanted more insulation so the GC just piled it on so 
they could pass inspection, never thinking about the effects on the sprinkler 
system deflector distances.