We recently had a local AHJ require a visual inspection of a CPVC system prior to doing a hydrostatic test. All places where a sprinkler head was installed they made us remove the heads for the inspection. Has anyone ever had this happen to them or am I missing something here? Thanks, Mike
_______________________________________________ Sprinklerforum mailing list [email protected] http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org
