I would like to query greater minds than mine on is a space CC or Not ....

Basis of Code is NFPA 13 2016ed.

Spaces above Ceiling, Below Floor Above:

Situation is an Acoustical Grid Ceiling with 2x4 lay in tile (standard 
construction) 2' below metal open web joists (14" Depth) with attached 
FiberBoard.

Essentially creating 3 spaces of consideration: The floor space below the 
ceiling, the space above the ceiling between the ceiling and the fiberboard, 
and the space above the fiberboard to the deck/floor above.

The fiberboard being the combustible factor, would / should you extend coverage 
above and below it?

Thanks In Advance for your thoughts.

JD Gamble
307-763-3361
[LSS Inc Logo - Color]

_______________________________________________
Sprinklerforum mailing list
[email protected]
http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org

Reply via email to