Gluck quoted Rossi:

"It is elementary engineering. it ws repeatedly published in many places
blogs and it is well known:
the flowmeter has been placed at a level lower than the source and the
destination of the water flow, therefore it was at the bottom of a 'U': in
such position, due to gravity, the flowmeter is always full."

Rossi did claim this, but he lied. He often lies.

- Jed

Reply via email to