Andrew <[email protected]> wrote:

**
> I said
>  *The measurement task has been made unnecessarily difficult by
> specifying 3-phase input to the control box.  Normal single-phase input
> would suffice here, given the power levels.*
>

There is nothing "difficult" about measuring 3-phase power. Power meters
have been doing this for 130 years.

Buildings in industrial parks are often served with 3-phase power. I assume
Rossi is developing his control circuitry to work with 3-phase power for
this reason. There is nothing nefarious about that.

- Jed

Reply via email to