[Winona Online Democracy]



Thanks, Keith, for your willingness to wear that sign!! :)  I hope that you will continue giving us updates as this project moves forward.  It seems like something that will greatly benefit residents' safety. 
 
Will there also be some aesthetic considerations for the designs? I also wonder about lighting of pedestrian walkways at night. The thought of walking through a dark "tunnel" is a bit creepy to me.
 
Just an affirmative comment about how other communities have gone with similar grade changes to deal with the tracks. There are a few that come to mind to help me visualize this.  Wabasha has one coming into town from 61, but I remember that during the big flood in '01, the road had to be closed due to the high water.  I suspect that was an unusual occurance due to the record flood waters.
 
I also have a few memories of Park St. in Madison where I learned to drive with standard transmission--after I got stuck on the incline during rush hour, I avoided it for many months!  It was such a thrill once I'd mastered the clutch and could start up the hill without killing the engine or using the parking brake!! That intersection with the tracks was similar to Huff in that there were stoplight controlled intersections within a few blocks of the tracks. I know I've been stopped well behind the lights at Sarnia when there have been trains crossing Huff.  It sounds like these improvements will eliminate that issue for us!
 
Kathy Seifert
----- Original Message -----
Sent: Tuesday, August 02, 2005 8:32 AM
Subject: [Winona] Huff street

[Winona Online Democracy]


The design information for the Huff street underpass is very preliminary.  The next step will be to hire an engineering firm to do some preliminary design and sketches.  At that point we should start to see what issues will develop, and what the solutions to those issues may be.

 

I will provide what information I have in reference to the few questions and comments that I have received.  I particularly liked the idea of a fact finding trip to the “Chunnel” between England and France.  That could take two weeks to get all the information.  Are we building the “Huffel?”

 

Huff street has the highest “exposure factor” of all city intersections.  The exposure factor is a product of vehicle traffic and train traffic.  That train traffic includes switching engines.  Broadway and Mankato avenues followed next.  These numbers do not include the added benefit of the proposed pedestrian crossings on Johnson and Winona streets.

 

Yes, the water table is going to be a significant design issue.  The estimate includes a pumping station to remove the water when required.  It will also require additional storm sewer pipe installation.

 

My favorite question so far was from someone trying to picture what this may structure may look like.  We do not yet have a drawing but yes the road will go down starting near Sarnia and coming back up well beyond Mark.  At the same time the railroad tracks will be raised so that trains will indeed be above the vehicles. This person was not able to picture the trains overhead.  It really is quite common and I would kindly recommend a little more travel outside of Winona.  (not nasty sarcasm only friendly ribbing)  This was found to be the least disruptive to the area.  It looks like the roadway will need to be about 15’ below the railroad.  I do not know how high the tracks can be raised.  Eight foot wide bike pedestrian ways will be on each side of Huff street as part of the underpass.

 

Bob Sebo asked too many questions at one time for me to answer.  Along those lines, the City Council may be asking that the past transportation study that addressed many of Bob’s questions be brought up to date.  As far as the four lanes being completed between Winona and I 90, I would not hold my breath as long as highway 52 construction between Rochester and the Twin Cities is under construction.  That seems to be taking all the money for many years to come.  Also traffic volume on TH 43 road does not warrant the improvements at this time.

 

Not many questions from the lurkers, although I’ve received some friendly harassment from a fellow employee’s early morning golf partners and others who think I like the electronic “kick me” sign.

 

Keith Nelson

City of Winona Public Works

Winona, MN

507 457 8274

 


_______________________________________________
This message was posted to Winona Online Democracy
All messages must be signed by the senders actual name.
No commercial solicitations are allowed on this list.
To manage your subscription or view the message archives, please visit
http://mapnp.mnforum.org/mailman/listinfo/winona
Any problems or suggestions can be directed to
mailto:[EMAIL PROTECTED]
If you want help on how to contact elected officials, go to the Contact page at
 http://www.winonaonlinedemocracy.org
_______________________________________________
This message was posted to Winona Online Democracy
All messages must be signed by the senders actual name.
No commercial solicitations are allowed on this list.
To manage your subscription or view the message archives, please visit
http://mapnp.mnforum.org/mailman/listinfo/winona
Any problems or suggestions can be directed to 
mailto:[EMAIL PROTECTED] 
If you want help on how to contact elected officials, go to the Contact page at
 http://www.winonaonlinedemocracy.org

Reply via email to