[
https://issues.apache.org/jira/browse/YARN-3079?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14293141#comment-14293141
]
Hadoop QA commented on YARN-3079:
---------------------------------
{color:green}+1 overall{color}. Here are the results of testing the latest
attachment
http://issues.apache.org/jira/secure/attachment/12694732/YARN-3079.003.patch
against trunk revision 6f9fe76.
{color:green}+1 @author{color}. The patch does not contain any @author
tags.
{color:green}+1 tests included{color}. The patch appears to include 1 new
or modified test files.
{color:green}+1 javac{color}. The applied patch does not increase the
total number of javac compiler warnings.
{color:green}+1 javadoc{color}. There were no new javadoc warning messages.
{color:green}+1 eclipse:eclipse{color}. The patch built with
eclipse:eclipse.
{color:green}+1 findbugs{color}. The patch does not introduce any new
Findbugs (version 2.0.3) warnings.
{color:green}+1 release audit{color}. The applied patch does not increase
the total number of release audit warnings.
{color:green}+1 core tests{color}. The patch passed unit tests in
hadoop-common-project/hadoop-kms.
Test results:
https://builds.apache.org/job/PreCommit-YARN-Build/6431//testReport/
Console output: https://builds.apache.org/job/PreCommit-YARN-Build/6431//console
This message is automatically generated.
> Scheduler should also update maximumAllocation when updateNodeResource.
> -----------------------------------------------------------------------
>
> Key: YARN-3079
> URL: https://issues.apache.org/jira/browse/YARN-3079
> Project: Hadoop YARN
> Issue Type: Bug
> Reporter: zhihai xu
> Assignee: zhihai xu
> Attachments: YARN-3079.000.patch, YARN-3079.001.patch,
> YARN-3079.002.patch, YARN-3079.003.patch
>
>
> Scheduler should also update maximumAllocation when updateNodeResource.
> Otherwise even the node resource is changed by
> AdminService#updateNodeResource, maximumAllocation won't be changed.
> Also RMNodeReconnectEvent called from
> ResourceTrackerService#registerNodeManager will also trigger
> AbstractYarnScheduler#updateNodeResource being called.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)