The problem with this is that in Thread Group, it is scheduled to run for 2 hours and 
loop forever.  I am assuming that after 2 hours, the looping will stop. 
 
So, according to your suggestion, Simple Controller for login and logout will repeat 
and that is not what I want.  I can use Once Only Controller for login and the Loop 
Controller you suggested.  However, the logout is the problem.  I cannot use Once Only 
Controller for logout because the user should not logout until 2 hours has ended.
 
thanks.

"BAZLEY, Sebastian" <[EMAIL PROTECTED]> wrote:
Thread group
Simple Controller
Login
Loop controller
Random Controller
Simple Controller
Logout

Or something similar.
-----Original Message-----
From: Remedy QA [mailto:[EMAIL PROTECTED]
Sent: 25 May 2004 20:14
To: JMeter User List
Subject: how to run a logout transaction once


I would like to have users run these in this order in a scheduled simulation
duration: 
1. a first set of transactions once, 
2. then run a second set randomly and repeatedly, 
3. then finally when simulation time is near the end, run a thrid set of
transactions once. 

For the first 2 sets, I realize I can use the Once Only Controller and
Random Controller respectively. However, I don't know how to get the last
set to run only once at the time I want.

The last set of transactions is essentially logout. I would like the user
to only login/logout once through the entire simulation. For the other
transactions, I would like the users to repeat until the simulation time has
ended. The final action should be logout before the simulation ends.

Can anyone think of a way to achieve this?

Thanks,
Mabel


                
---------------------------------
Do you Yahoo!?
Friends.  Fun. Try the all-new Yahoo! Messenger

Reply via email to