As a potential customer it is not my concern as it has no effect on the ROI or LCOE of any plant and / or equipment he may supply to us.

AG

On 11/30/2011 3:17 PM, Giovanni Santostasi wrote:
Talking about money, didn't Rossi say that a big chunk of the money he is going to make will go to children with cancer?
What happened to that?
G

On Tue, Nov 29, 2011 at 9:56 PM, Aussie Guy E-Cat <aussieguy.e...@gmail.com <mailto:aussieguy.e...@gmail.com>> wrote:

    I'm working from currently published figures. $2 million for a 1
    MW thermal plant and $500 k for the hot fluid to steam generator
    to steam turbine to Ac generator plus control systems, valves,
    pumps, waste heat radiators, etc.

    My projection is based on what I believe may be achievable in the
    next 12 months and showing why a min COP of 20 is needed for a
    thermal MW class LENR plant with a capex of $1.50 / thermal watt
    to achieve a LCOE of around $0.02 / Ac kWh. As you should well
    know, in the end it is all about ROI. A LENR plant will need to
    show a superior ROI and significantly lower LCOE than any other Ac
    kWh generation technology or no one will take a change on it and
    it will be business as usual.

    AG