any way to shove existing sync product boards in there? On Mon, Jan 30, 2017 at 9:30 AM, Forrest Christian (List Account) < [email protected]> wrote:
> Yes. Currently there is only one board type for the slots... You will be > able to order it with any number of slots filled - the rest will have > blanks put in place. It is designed so end users can add, remove or swap > each board. > > The current board is essentially our current powerinjector+sync in that > form factor - 4 ports, each jumperable for any gigabit-compatible power > scheme, and each jumperable to select one of the three voltage input > sources. > > There are two additional board types on the drawing board. The one most > interesting to my existing customers will add support for cambium sync > which is compatible with the 450i and 450m. > > > > On Mon, Jan 30, 2017 at 8:12 AM, That One Guy /sarcasm < > [email protected]> wrote: > >> is this mix and match for the 4 slots? >> >> On Mon, Jan 30, 2017 at 8:35 AM, Forrest Christian (List Account) < >> [email protected]> wrote: >> >>> For those eagerly waiting for the RackMount Injector.... >>> >>> The engineering validations I mentioned before have been completed. I >>> discovered one minor board error, which has been corrected. I also took >>> advantage of the additional board revision to make another minor circuit >>> revision which will improve performance. At this point, what we hope are >>> the final verification boards are on order. Because of how minor the >>> revision was to the boards, we have decided to go ahead and release this to >>> part purchasing - which basically means we're buying everything we need to >>> actually build these. We should be able to validate the final board >>> revision and have actual production boards here before all of the other >>> parts arrive. This will also give us a chance to modify the circuit board >>> if we discover a parts availability issue during the purchasing process. >>> >>> We've issued almost all of the purchase orders for parts for the first >>> production run - we're now waiting for final confirmation of delivery >>> dates. I expect these this week, with the caveat that in a couple of >>> cases we're dealing with the non-joys of trying to get things done during >>> China's spring festival holiday. At least one vendor is shut down >>> completely until the 3rd, and I'm sure there will be a bit of backlog when >>> everyone returns to work. >>> >>> Once I have confirmed orders with estimated ship dates and validated >>> pricing for almost everything, I'll get the unit up on the website to do >>> pre-orders with a semi-definite ship date. At this point, I'm guessing >>> either just before or just after WISPAMERICA. We're hoping for just >>> before since I would much rather tell people that the product is shipping >>> than explain why it isn't. But the reality is that there isn't much time >>> before WISPAMERICA so I'm guessing I'll be explaining. >>> >>> One more teaser image is attached. >>> >>> -- >>> *Forrest Christian* *CEO**, PacketFlux Technologies, Inc.* >>> Tel: 406-449-3345 | Address: 3577 Countryside Road, Helena, MT 59602 >>> [email protected] | http://www.packetflux.com >>> <http://www.linkedin.com/in/fwchristian> >>> <http://facebook.com/packetflux> <http://twitter.com/@packetflux> >>> >>> >> >> >> -- >> If you only see yourself as part of the team but you don't see your team >> as part of yourself you have already failed as part of the team. >> > > > > -- > *Forrest Christian* *CEO**, PacketFlux Technologies, Inc.* > Tel: 406-449-3345 | Address: 3577 Countryside Road, Helena, MT 59602 > [email protected] | http://www.packetflux.com > <http://www.linkedin.com/in/fwchristian> <http://facebook.com/packetflux> > <http://twitter.com/@packetflux> > > -- If you only see yourself as part of the team but you don't see your team as part of yourself you have already failed as part of the team.
