I actually meant line cards. So if I understand correctly both boxes have at 
least 2x6904. How many of your cards have the low revision number? 1 in the box 
or 2 
? Does moving these cards change which box is software switching?
Sent from a mobile device

> On 21 Apr 2015, at 01:40, Jeroen van Ingen <[email protected]> wrote:
> 
>> On 04/20/2015 05:28 PM, Andrew Miehs wrote:
>> Have you tried swapping the two interfaces between the chassis?
> 
> Nope, because it happens on several interfaces in "router A", spread across 
> two line cards. Interfaces are in routed mode with several subinterfaces 
> configured; there's a clear pattern in the subinterfaces that are fully 
> hardware switched and subinterfaces that are partially software switched. 
> There's at least one subinterface where I can manipulate the config; when 
> adding PBR it goes to fully hardware switched, when removing PBR it goed to 
> partially in software. And exactly the same configs always work fully 
> hardware switched in router B.
> 
> My conclusion from that, is that swapping interfaces (which I interpret in 
> this case as swapping the transceivers) can't possibly make a difference.
> 
> Thanks for your thought though.
> 
> Regards,
> 
> Jeroen van Ingen
> ICT Service Centre
> University of Twente, P.O.Box 217, 7500 AE Enschede, The Netherlands
> 
_______________________________________________
cisco-nsp mailing list  [email protected]
https://puck.nether.net/mailman/listinfo/cisco-nsp
archive at http://puck.nether.net/pipermail/cisco-nsp/

Reply via email to