SEZ9 commented on PR #10643:
URL: https://github.com/apache/seatunnel/pull/10643#issuecomment-6538848344

   Thanks for the follow-up. Status is unchanged on head 
`1d50ab8212032104e46d4f2f4b465981526802b6`:
   
   - `Signal pull request update` (job 122625443819 in run 40630483881) = 
`SUCCESS`.
   - `Build` (122625517828) = `TIMED_OUT`, with the two all-connectors-it-3 
jobs cancelled.
   
   A cancelled or timed-out execution is a CI gate, not a runtime failure, and 
does not by itself indicate a port-selection regression. Please rerun those 
cancelled jobs; if an actual failing step appears, share the relevant log 
snippet here and we can take a look. The current base does not provide a 
demonstrated source fix for the cancellation, so a sync alone is not being 
prescribed.
   
   My source conclusion remains clear on this head. This is a CI clarification 
only, not a new source review or an approval: I have READ repository 
permission, so any dismissal of historical requested changes and the final 
approval must be performed by a write-capable maintainer once the CI gate is 
satisfied.
   
   <!-- streview-comment:2166 -->


-- 
This is an automated message from the Apache Git Service.
To respond to the message, please log on to GitHub and use the
URL above to go to the specific comment.

To unsubscribe, e-mail: [email protected]

For queries about this service, please contact Infrastructure at:
[email protected]

Reply via email to