SEZ9 commented on PR #10643: URL: https://github.com/apache/seatunnel/pull/10643#issuecomment-6538848344
Thanks for the follow-up. Status is unchanged on head `1d50ab8212032104e46d4f2f4b465981526802b6`: - `Signal pull request update` (job 122625443819 in run 40630483881) = `SUCCESS`. - `Build` (122625517828) = `TIMED_OUT`, with the two all-connectors-it-3 jobs cancelled. A cancelled or timed-out execution is a CI gate, not a runtime failure, and does not by itself indicate a port-selection regression. Please rerun those cancelled jobs; if an actual failing step appears, share the relevant log snippet here and we can take a look. The current base does not provide a demonstrated source fix for the cancellation, so a sync alone is not being prescribed. My source conclusion remains clear on this head. This is a CI clarification only, not a new source review or an approval: I have READ repository permission, so any dismissal of historical requested changes and the final approval must be performed by a write-capable maintainer once the CI gate is satisfied. <!-- streview-comment:2166 --> -- This is an automated message from the Apache Git Service. To respond to the message, please log on to GitHub and use the URL above to go to the specific comment. To unsubscribe, e-mail: [email protected] For queries about this service, please contact Infrastructure at: [email protected]
