According to IEC/EN 61000-4-5, the surge pulse shall be injected onto a screened cable 20 meters from the DUT.
We have a fire alarm system with 20 detectors connected on the same screened cable, 1.5 meters between each detector. We have been told from the local test lab that we have to add a 20m cable between each detector in order to surge test each detector. I'm sure our local cable distributor like that idea ... , but do we really have to do this ? Why is this 20 meters cable needed ? Is it to induce the surge pulse from the screen into the cable lines? The 20 detectors make a total cable distance of 30 meters and the screen is continuous. Is it possible to insert a pulse in the beginning of the cable and test all detectors simultaneous ? Regards Amund ------------------------------------------- This message is from the IEEE EMC Society Product Safety Technical Committee emc-pstc discussion list. Visit our web site at: http://www.ewh.ieee.org/soc/emcs/pstc/ To cancel your subscription, send mail to: [email protected] with the single line: unsubscribe emc-pstc For help, send mail to the list administrators: Ron Pickard: [email protected] Dave Heald: [email protected] For policy questions, send mail to: Richard Nute: [email protected] Jim Bacher: [email protected] All emc-pstc postings are archived and searchable on the web at: http://ieeepstc.mindcruiser.com/ Click on "browse" and then "emc-pstc mailing list"