My slug is pretty big, about 50 MB, mostly due to gem dependencies. I
figure I could shave about 5 MB if I spent an entire day shaving off
unused bits. But I doubt this would make any perceivable difference.

I don't really mind the sluggish spin up time. What I do mind is
having slug compilation occasionally take 4+ hours instead of the
normal 3 minutes. That means I can't show my boss the current state of
the app, which is pretty embarrassing and shakes his confidence in
hosting the production app with Heroku. I pointed out the slow spinup
because there seemed to be a strong connection between that and the
slow slug compilation.

I recently upped my staging to 2 dynos (1 paid), to see if the problem
goes away.

-- 
You received this message because you are subscribed to the Google Groups 
"Heroku" group.
To post to this group, send email to [email protected].
To unsubscribe from this group, send email to 
[email protected].
For more options, visit this group at 
http://groups.google.com/group/heroku?hl=en.

Reply via email to