If it is a recycle impacting CDS Backups, the recycle can simply be held. 
Recycle will then end pre-maturely and CDS Backup will proceed.

There should not be any need to cancel DFHSM in this instance.

Dave O'Brien
NIH Contractor
________________________________________
From: IBM Mainframe Discussion List [[email protected]] On Behalf Of 
Staller, Allan [[email protected]]
Sent: Wednesday, March 04, 2009 11:24 AM
To: [email protected]
Subject: Re: DFHSM Issue - Critical

I have modified my schedule to do the same. The CDS backups rarely (with
the exception of SSM) occur during concurrent migration and backup.

BTW, I have also had this situation occur when a recycle was processing
concurrent w/CDS backup.

In my most recent case, a multi-vol recycle was running when the CDS
backup started. The CDS backup enqueued behind the recyle. When the
recycle completed the current volume, he could not proceed because the
CDS backup had an exclusive
Enqueue on the CDS and the recycle could not read the CDS to obtain a
shared enqueue on the next volume to be recycled.

The CDS backup could not proceed because the it could not get exclusive
control of the CDS in order to proceed.

A cancel will release both enqueues and allow things to proceed when
DFHSM Is restarted.

<snip>
Allan, I find that CDS Backups run before my Incremental Backups but
then I've always scheduled Backups before Secondary Space Mgt. Is it
possible that HSM automatically backs up the CDS datasets before the
first major automated process after midnight whether it is Primary or
Secondary Space Mgt. or Incremental Backups if the CDSVERSIONBACKUP
parameter is coded in Parmlib? I haven't found a clear description in
the FMs.
</snip>

Not sure about the what actually triggers the CDS backup either. In my
case. SSM is the first major process to run nightly.

----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions,
send email to [email protected] with the message: GET IBM-MAIN INFO
Search the archives at http://bama.ua.edu/archives/ibm-main.html

----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions,
send email to [email protected] with the message: GET IBM-MAIN INFO
Search the archives at http://bama.ua.edu/archives/ibm-main.html

Reply via email to