All this talk of cancelling DFHSM sounds scary to very wrong. In my
experience, it almost always leaves the CDS's in a state of
incompleteness. Requiring AUDIT and more.

I've never had a hang due to CDS back-up starting in the middle of other
processing. I do Autobackup, then Secondary, then Primary. The CDS
back-up is the first part of Autobackup. You back up first as unbackuped
files won't migrate. Secondary next for maximum ML1 space, then
migration.

> -----Original Message-----
> From: IBM Mainframe Discussion List [mailto:[email protected]] On
> Behalf Of O'Brien, David W. (NIH/CIT) [C]
> Sent: Wednesday, March 04, 2009 8:31 AM
> To: [email protected]
> Subject: Re: DFHSM Issue - Critical
> 
> If it is a recycle impacting CDS Backups, the recycle can simply be
held.
> Recycle will then end pre-maturely and CDS Backup will proceed.
> 
> There should not be any need to cancel DFHSM in this instance.
> 
> Dave O'Brien
> NIH Contractor
> ________________________________________
> From: IBM Mainframe Discussion List [[email protected]] On Behalf
Of
> Staller, Allan [[email protected]]
> Sent: Wednesday, March 04, 2009 11:24 AM
> To: [email protected]
> Subject: Re: DFHSM Issue - Critical
> 
> I have modified my schedule to do the same. The CDS backups rarely
(with
> the exception of SSM) occur during concurrent migration and backup.
> 
> BTW, I have also had this situation occur when a recycle was
processing
> concurrent w/CDS backup.
> 
> In my most recent case, a multi-vol recycle was running when the CDS
> backup started. The CDS backup enqueued behind the recyle. When the
> recycle completed the current volume, he could not proceed because the
> CDS backup had an exclusive
> Enqueue on the CDS and the recycle could not read the CDS to obtain a
> shared enqueue on the next volume to be recycled.
> 
> The CDS backup could not proceed because the it could not get
exclusive
> control of the CDS in order to proceed.
> 
> A cancel will release both enqueues and allow things to proceed when
> DFHSM Is restarted.
> 
> <snip>
> Allan, I find that CDS Backups run before my Incremental Backups but
> then I've always scheduled Backups before Secondary Space Mgt. Is it
> possible that HSM automatically backs up the CDS datasets before the
> first major automated process after midnight whether it is Primary or
> Secondary Space Mgt. or Incremental Backups if the CDSVERSIONBACKUP
> parameter is coded in Parmlib? I haven't found a clear description in
> the FMs.
> </snip>
> 
> Not sure about the what actually triggers the CDS backup either. In my
> case. SSM is the first major process to run nightly.
> 
> ----------------------------------------------------------------------
> For IBM-MAIN subscribe / signoff / archive access instructions,
> send email to [email protected] with the message: GET IBM-MAIN INFO
> Search the archives at http://bama.ua.edu/archives/ibm-main.html
> 
> ----------------------------------------------------------------------
> For IBM-MAIN subscribe / signoff / archive access instructions,
> send email to [email protected] with the message: GET IBM-MAIN INFO
> Search the archives at http://bama.ua.edu/archives/ibm-main.html

----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions,
send email to [email protected] with the message: GET IBM-MAIN INFO
Search the archives at http://bama.ua.edu/archives/ibm-main.html

Reply via email to