[
https://issues.apache.org/jira/browse/TEZ-2581?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14996514#comment-14996514
]
Jeff Zhang commented on TEZ-2581:
---------------------------------
This is the task level commit, not vertex/dag level commit. I check the
previous recovery code, the behavior is not changed. And I think if the task
level commit can not be recovered, it should be fine to reschedule a new task
attempt to rerun it.
> Umbrella for Tez Recovery Redesign
> ----------------------------------
>
> Key: TEZ-2581
> URL: https://issues.apache.org/jira/browse/TEZ-2581
> Project: Apache Tez
> Issue Type: Improvement
> Reporter: Jeff Zhang
> Assignee: Jeff Zhang
> Attachments: TEZ-2581-WIP-1.patch, TEZ-2581-WIP-10.patch,
> TEZ-2581-WIP-11.patch, TEZ-2581-WIP-2.patch, TEZ-2581-WIP-3.patch,
> TEZ-2581-WIP-4.patch, TEZ-2581-WIP-5.patch, TEZ-2581-WIP-6.patch,
> TEZ-2581-WIP-7.patch, TEZ-2581-WIP-8.patch, TEZ-2581-WIP-9.patch,
> TezRecoveryRedesignProposal.pdf, TezRecoveryRedesignV1.1.pdf
>
>
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)