sir,
by changing the load when i run opf then the lmp at the 3rd bus will not
include the incentives.i want to include that term and i want to calculate
the lmp value.is it possible to calculate lmp value using matpower or any
other suggestion.

On Sat, Feb 20, 2016 at 1:56 AM, Ray Zimmerman <[email protected]> wrote:

> I’m not sure if your question is about how to get the prices from MATPOWER
> results, or about how to formulate your problem. If the former, the prices
> are in results.bus(:, LAM_P). If it’s the latter, I suggest you take your
> question to a more appropriate forum.
>
>     Ray
>
>
> On Feb 19, 2016, at 8:12 AM, Mounika Vanjarapu <[email protected]>
> wrote:
>
> sir
> my problem is
> i am taking an ieee standard bus system.
> based on the reference paper on contingency analysis i take 9-14 line as
> the most critical outage for 14 bus system.
> i remove that line and i apply the demand response at 3rd bus which have
> 94.2MW load.
>
> <image.png>
> taking demand before demand response 94.2MW,elasticity as given -0.1 as
> given in reference,penalty as zero,assume incentive as 100$/MWh,price taken
> the lmp value at 3rd bus.i get the load after dr as 84.6.
> now my question is ,when i include incentives then the price will change
> at that bus.how to show the price variation
>
>
>

Reply via email to