sir, by changing the load when i run opf then the lmp at the 3rd bus will not include the incentives.i want to include that term and i want to calculate the lmp value.is it possible to calculate lmp value using matpower or any other suggestion.
On Sat, Feb 20, 2016 at 1:56 AM, Ray Zimmerman <[email protected]> wrote: > I’m not sure if your question is about how to get the prices from MATPOWER > results, or about how to formulate your problem. If the former, the prices > are in results.bus(:, LAM_P). If it’s the latter, I suggest you take your > question to a more appropriate forum. > > Ray > > > On Feb 19, 2016, at 8:12 AM, Mounika Vanjarapu <[email protected]> > wrote: > > sir > my problem is > i am taking an ieee standard bus system. > based on the reference paper on contingency analysis i take 9-14 line as > the most critical outage for 14 bus system. > i remove that line and i apply the demand response at 3rd bus which have > 94.2MW load. > > <image.png> > taking demand before demand response 94.2MW,elasticity as given -0.1 as > given in reference,penalty as zero,assume incentive as 100$/MWh,price taken > the lmp value at 3rd bus.i get the load after dr as 84.6. > now my question is ,when i include incentives then the price will change > at that bus.how to show the price variation > > >
