We have rules here if the engine is changed or up graded. Hence you will get away with a L20B in your 1600 but not a SR20DET
Ohh it must be a SSS engine so that more Hp to start with. That twin side draft mani is factory . They are a old car must peolpe dont know ,as long as its tidy and looks right, Malcolm James Cox wrote: > That's bullshit (not you Errol, the rule) > So if my 96hp L20 puts out more than 105.6hp I need a certificate? > > so in effect.. amost every car that now gets fitted with a sports > system, will need an enginer's cert? cause that often results in power > gains of 10% or more > > fark > > James Cox > >> > > >> From: "E Smith" <[EMAIL PROTECTED]> >> Reply-To: [EMAIL PROTECTED] >> To: <[EMAIL PROTECTED]> >> Subject: RE: L20b >> Date: Wed, 29 May 2002 22:25:25 +1000 >> MIME-Version: 1.0 >> Received: from [209.61.188.254] by hotmail.com (3.2) with ESMTP id >> MHotMailBEBE151700A240043892D13DBCFEC84D0; Wed, 29 May 2002 05:31:22 >> -0700 >> Received: from mars (CPE-144-136-12-205.vic.bigpond.net.au >> [144.136.12.205])by jupiter.linuxengine.net (8.11.6/8.11.0) with ESMTP >> id g4TCU2q12536;Wed, 29 May 2002 07:30:03 -0500 >> From [EMAIL PROTECTED] Wed, 29 May 2002 05:32:45 -0700 >> Message-ID: <[EMAIL PROTECTED]> >> X-Priority: 3 (Normal) >> X-MSMail-Priority: Normal >> X-Mailer: Microsoft Outlook IMO, Build 9.0.2416 (9.0.2910.0) >> In-Reply-To: <f05100300b91a7063829b@[10.0.1.20]> >> X-MimeOLE: Produced By Microsoft MimeOLE V5.00.2615.200 >> Importance: Normal >> X-Envelope-To: membersozdat >> X-UIDL: pAg!!~)O!!CJX!!,4*"! >> Sender: [EMAIL PROTECTED] >> >> Its now a > 10% increase in power and a certificate is required. >> >> Cheers >> Feral Errol >> >> -----Original Message----- >> From: [EMAIL PROTECTED] >> [mailto:[EMAIL PROTECTED]]On Behalf Of Steve Lamb >> Sent: Wednesday, 29 May 2002 9:52 PM >> To: [EMAIL PROTECTED] >> Subject: Re: L20b >> >> >> Can someone tell me if you technically need an engineer`s >> report for >> an L20b for rego in Victoria please. >> >> My understanding is that, technically, yes. The rule-of-thumb used to be >> >10% increase over original capacity required 'engineering'. But its >> been >> awhile, so better check with Vicroads engineering dept as they'll have >> more >> up to date info. >> >> --membersozdat------------------------------------------------------- >> OZDAT Mailing List Please Note:- >> Send (un)subscribe requests to [EMAIL PROTECTED] >> Send submissions to [EMAIL PROTECTED] >> No unauthorised redistribution of this email >> http://www.ozdat.com/ozdatonline/index.htm >> http://www.ozdat.com/ozdatonline/listindex.html >> http://www.mail-archive.com/[email protected]/ >> --------------------------------------------------------------------- >> > > > _________________________________________________________________ > Send and receive Hotmail on your mobile device: http://mobile.msn.com > > > > --membersozdat------------------------------------------------------- OZDAT Mailing List Please Note:- Send (un)subscribe requests to [EMAIL PROTECTED] Send submissions to [EMAIL PROTECTED] No unauthorised redistribution of this email http://www.ozdat.com/ozdatonline/index.htm http://www.ozdat.com/ozdatonline/listindex.html http://www.mail-archive.com/[email protected]/ ---------------------------------------------------------------------
