Sequoyah response

 

From: [email protected] [mailto:[email protected]] On Behalf
Of Barber, Jerry
Sent: Monday, June 13, 2011 6:14 PM
To: '[email protected]'
Subject: Powernet: RP "Non-Core" Responsibilities

 

I have been asked to compare RP's "non-core" responsibility commitments
at our site to other sites.  To assist in this effort, I would
appreciate answers to the following questions:

 

Does RP calibrate radiation monitors? 

                If so, which type?

                                Area Monitors? Not installed monitors -
only temporary

                                Process Monitors? No

                                Accident Monitors? No

Does RP sample storm drains (per ANI, for tritium and gamma analysis)?
No

                If so, at what frequency are these samples collected?

Does RP obtain soil samples from locations inside the site boundary for
gamma analysis? No - Corp based group performs environs sampling

                If so, at what frequency are these samples collected?

Does RP perform sampling of volumetric materials (oil, soil, concrete,
etc.) for unconditional release? Yes

Is RP responsible for calibrating/maintaining/daily operability checks
for the following?

                                Gamma Spectroscopy Equipment No

                                Alpha and beta proportional counters Yes

Is RP responsible for the Confined Space Program? No 

                Does RP perform all atmospheric sampling for confined
spaces? No

Is RP responsible for sluicing secondary resin? No

Is RP responsible for sluicing primary resin? No - but is done with
heavy RP support/input

Is RP responsible for dewatering resin for shipment? Yes

Is RP responsible for packaging radioactive waste casks for shipment?
Yes

Do RP technicians manage all day to day dosimetry operations (issue
TLDs, perform Personnel Exposure Investigations for anomalous ED or TLD
readings, badge exchange, etc.)? Yes

 

And finally, How many units do you have, and how many RP technicians do
you have per unit?  Please include all RP technician/equivalents who
perform ALARA planning, RWPs, Outage Planning, Dosimetry, Instruments,
Respiratory Protection, Radioactive Waste, Confined Space
sampling/permitting no matter what organization they report to.

2 Unit PWR - staffing numbers are total site

 

19 Field Techs (16 Sr 3 Jr)

5 Dosimetry Techs (we run the processing lab for TVA)

2 IRP Techs

3 Lead Techs assigned to Technology and Online Work Management

 

 

Thanks for helping make Powernet work for all of us!!!!!

 

 

 

 

Jerry Barber
Lead RC Specialist
H.B. Robinson Nuclear Plant
843-857-1496
[email protected] 

 

 

Reply via email to