I'm pulling my hair out here - there must be a way of doing this, but I can't find it: I've inherited a board from someone else, with most of the tracks routed (I've had to modify it slightly), but all the tracks are missing netlist information. Is there a way to update all tracks on the board so they are the same net as their immediate connections, or flag an error if a conflict occurs? Cheers, Matt van de Werken. * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * To post a message: mailto:[EMAIL PROTECTED] * * To join or leave this list visit: * http://www.techservinc.com/protelusers/subscrib.html * - or email - * mailto:[EMAIL PROTECTED]?body=leave%20proteledaforum * * Contact the list manager: * mailto:[EMAIL PROTECTED] * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
[PEDA] Mapping connected copper to the same net
van de Werken, Matthew (DEM, PH) Mon, 07 May 2001 10:02:04 -0700
- Re: [PEDA] Mapping connected copper to th... van de Werken, Matthew (DEM, PH)
- Re: [PEDA] Mapping connected copper ... Michael Beavis
- Re: [PEDA] Mapping connected copper ... Jon Elson
- Re: [PEDA] Mapping connected copper ... van de Werken, Matthew (DEM, PH)
- Re: [PEDA] Mapping connected copper ... Abd ul-Rahman Lomax
