All,
A while back someone posted an answer to this question. I recall the
process was to use "Move to Back" sequentially through the sheet
symbols.
jmc

Jörg Guttmann wrote:
> 
> Hello Mr. Good
> 
> Some years ago, I have done this with Protel 2.8 (I believe).
> 
> It seems that protel arrange the sheets and subsheets in the
> same order (with respect to time) as they has been created
> as sheet symbols.
> 
> There are two ways to change these order:
> 
>   1) You can place the subsheet symbols from the beginning in
>       your preffered order. But most of the time, you don't now
>       how many subsheets you will need in the beginning and you
>       will not now the names of these sheets.
> 
>   2) You can save the sheet that will contain the subsheets
>       in the ASCII file format. With an editor you can open
>       these file and you will see the definitions of the
>       subsheets somewhere in the file. There you
>       can swap the definitions to your desired order,
>       save the file and import it in protel. Now
>       the subsheets will appear in the desired order in
>       the schematic panel window.
>       The sheet number can no be changed with the annotate
>       function of schematic.
> 
> Its is (or was with 2.8) possible, but it is very complicated.
> If don#t use it anymore.
> 
> Dipl. Ing. J rg Guttmann
> eMail: [EMAIL PROTECTED]
> ===================================================
> Visit our Web Site:   http://www.imar-navigation.de
> ===================================================
> iMAR GmbH
> Gesellschaft f r inertiale Mess-, Automatisierungs- und Regelsysteme
> Systems for Inertial Measuring, Automation and Control
> Schlackenbergstrasse 41
> D-66386  St. Ingbert / Germany
> 
> Tel.: +49-(0)6894-9657-34
> Fax : +49-(0)6894-9657-22
> 
> ----- Original Message -----
> From: <[EMAIL PROTECTED]>
> To: Protel EDA Forum <[EMAIL PROTECTED]>
> Sent: Thursday, March 22, 2001 10:53 PM
> Subject: Re: [PEDA] Printing schematics
> 
> > Hello all,
> >
> > One thing I have never figured out is how to arrange the order of the
> sheets
> > in a project so that they are in the order that I want, and that they
> print
> > in that order. Has anyone ever bothered to figure it out and could you
> > please enlighten me?!
> >
> > Regards,
> >
> > Lloyd Good
> > GE Harris Energy Control Systems Canada Inc.
> > 2728 Hopewell Place NE
> > Calgary, AB, Canada T1Y 7J7
> > (403) 214-4777
> >
> >

-- 
>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>
>John M. Cardone       Electro-Mechanical Dsgn. Engr. Grp.
>M/S 278-100           Mechanical Engineering Section, 352
>4800 Oak Grove Dr.    NASA / Jet Propulsion Laboratory
>Pasadena, Ca 91109 
>Tel: 818.354.5407     MailTo:[EMAIL PROTECTED]
>Fax: 818.393.4860
>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>

* * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
* To post a message: mailto:[EMAIL PROTECTED]
*
* To join or leave this list visit:
* http://www.techservinc.com/protelusers/subscrib.html
*                      - or email -
* mailto:[EMAIL PROTECTED]?body=leave%20proteledaforum
*
* Contact the list manager:
* mailto:[EMAIL PROTECTED]
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

Reply via email to