I didn't snap a photo yesterday, but next week I will certainly take some
photos, and report back on what we figure out. Definitely sounds like tape
is not a permanent solution.
Cheers,
Dave

On Thu, Jun 2, 2022 at 11:39 AM Jerry Shafer <[email protected]>
wrote:

> Regarding the tape on the back sheet
> I have seen Novis installers keep the tape to secure the modules and I
> have also seen it with the tape stll attached to the wires laying on the
> roof so in my humble opinion the tape is for shipping only and is not to be
> used as a wire management system.
> Jerry
> NABCEP PV Inspector
>
> On Thu, Jun 2, 2022 at 6:37 AM Dave Tedeyan via RE-wrenches <
> [email protected]> wrote:
>
>> Hi All,
>>
>> I just got some of the Qcell 360w AC modules that have the Enphase
>> microinverter factory applied to the back. The module is the half cut cell
>> type with the DC leads coming from either side of the middle of the module.
>> The modules come with the wires taped to the back of the module. If you
>> remove that tape, there appears to be almost no way to properly manage
>> those wires. Is that tape meant to just keep the wire on the back of the
>> module forever? Would that even last more than a year? I am curious what
>> other people have done for these if they have used them or something
>> similar. Maybe if you get the rail in the right spot, the wires will just
>> sit on the rail...
>>
>> I realize that we have had a thread on wire management with half cut cell
>> modules before, but this is a little different, as I am specifically asking
>> about that tape and if anyone knows if it holds up over time.
>>
>> Cheers,
>> Dave
>>
>> --
>> [image: Logo] <https://www.sungineersolar.com/>
>> Dave Tedeyan, P.E.
>> Owner | Sungineer Solar
>> p: he | him | his
>> a: 1653 Slaterville Rd. | Ithaca, NY 14850
>> w: www.sungineersolar.com <http://www.sungineersolar.com/>
>> c: (607) 288-2898
>> _______________________________________________
>> List sponsored by Redwood Alliance
>>
>> Pay optional member dues here: http://re-wrenches.org
>>
>> List Address: [email protected]
>>
>> Change listserver email address & settings:
>> http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org
>>
>> There are two list archives for searching. When one doesn't work, try the
>> other:
>> https://www.mail-archive.com/[email protected]/
>> http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org
>>
>> List rules & etiquette:
>> http://www.re-wrenches.org/etiquette.htm
>>
>> Check out or update participant bios:
>> http://www.members.re-wrenches.org
>>
>>

-- 
[image: Logo] <https://www.sungineersolar.com/>
Dave Tedeyan, P.E.
Owner | Sungineer Solar
p: he | him | his
a: 1653 Slaterville Rd. | Ithaca, NY 14850
w: www.sungineersolar.com <http://www.sungineersolar.com/>
c: (607) 288-2898
_______________________________________________
List sponsored by Redwood Alliance

Pay optional member dues here: http://re-wrenches.org

List Address: [email protected]

Change listserver email address & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org

There are two list archives for searching. When one doesn't work, try the other:
https://www.mail-archive.com/[email protected]/
http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org

List rules & etiquette:
http://www.re-wrenches.org/etiquette.htm

Check out or update participant bios:
http://www.members.re-wrenches.org

Reply via email to