Strange behavior of the list-server. Although I got some out-of-office
replies, neither I or my fellows in the office (members of the list) have
received the message posted 24 h ago. I'll try again...
Dear colleagues,
As part of a PCB design required to be compliant with EN60950, we want to
Is anyone aware of some possible new regulatory environmental requirements
that would apply to conductive shielding/coating. This conductive
coating/paint/vapor deposition is typically applied to the inside surface
of plastic enclosures to assist in meeting EMC regulatory requirements for
Dear Group,
Could any of you who have worked with a test house in Brazil that is
accredited to do Anatel testing (and that you are happy with) forward me the
contact details of that test house off line please
Thank you
Kevin Harris
This message is from the IEEE EMC Society Product Safety
Brain,
I like to repeat: For verification you do not need calibrated
equipment or full bandwidth. The verification is just a method to
increase trust in the calibration. If you use some homemade current
target and a 500 MHz scope, you will get a pretty good picture of the
waveform and detect
All,
If you will be in the area on May 28th, please consider joining us for
dinner and the opportunity to mingle with interesting people involved
with product safety. If you are not yet an NPSS member, this is a great
opportunity for you to become a member. Further information about the
NPSS
This is a multi-part message in MIME format.
The code defines
Continuous Load: A load where the maximum current is expected to continue
for 3 hours or more.
Plug use is not a condition of the definition. I think you will find this is
to limit the time and temperature of branch circuit cables and
At what duty cycle
From: Robert Johnson [mailto:john...@itesafety.com]
Sent: Monday, May 05, 2003 10:48 AM
To: 'JP Hare'; emc-p...@majordomo.ieee.org
Subject: RE: AC outlet max current
A noncontinuous load is permitted to use 100% of the circuit rating. Only
continuous loads need the
Dear David:
Thank you for concise and reasoned response to my questions. The IEC
Committee Draft on ESD (CDV) is a weighty document, and deserves many more
hours of study and thought that I have been able to give it at this point.
I agree that the trend toward faster processor speeds will
8 matches
Mail list logo