Dear Colleagues,
We made a decision to renovate our laboratory with new lab benches. This has
led to a bit of a conundrum with our ESD benches. Our local Feng Shui expert
has proclaimed that it would not do to have all new lab benches except for our
old ESD wooden benches. The issue we keep
Hi Grace
For your point 2
Under the RE-D for EMC compliance, you are not required to use a notified body
if a particular standard is not listed in the OJEU.
See Articles 3(1)(b) and 17(2) of the RE-D
http://eur-lex.europa.eu/legal-content/EN/TXT/HTML/?uri=CELEX:32014L0053=EN
Kind regards
Perhaps trust may be an issue, but given that the current system of humans
making the decisions kills more than 3,000 people a day according to
https://asirt.org/initiatives/informing-road-users/road-safety-facts/road-crash-statistics
surely we could get over it
Kevin
From: Ken Javor
Hello All
Have I misunderstood the words in IEC62052-31?
In a hypothetical measurement of an applied voltage where the uncertainty of
the exact value is 1% and a test voltage of 100 is required, the manufacturer
would need to insist on a 101V test voltage and the test facility would have to
Dear Colleagues
In 2014 CENELEC published an amendment to the EMC standard for alarm systems EN
50130-4:2011/A1:2014. In all the time since the commission failed to post it in
the OJ for the old EMC directive to the considerable detriment of manufactures
of alarm equipment.
In May of this
Hello
In response to the question posed under Mr. Woodgate's signature "Is there a
homeopathic remedy for excessive gullibility?" and as it is a Friday, the
answer is yes.
See http://gulligo.com/
Kind Regards
Kevin
This e-mail contains privileged and
Hi David
There is no 2013 version of EN50130-4.
The last full version was in 2011, followed by a 2014 amendment (A1)
Although A1 was voted positively over a year ago, the European commission has
still not yet managed to actually post the document in the OJEU!
Technically speaking for the
Hello
The software running our conducted immunity setup is of a certain age and has
never been particularly user friendly so we are considering updating it. The
test platform needs to support both residential and commercial level set-up and
testing but not any MIL standards. In terms of
regards
Amund
Fra: Harris, Kevin J (DSC) [mailto:kevinharr...@tycoint.com]
Sendt: 5. februar 2014 19:01
Til: EMC-PSTC@LISTSERV.IEEE.ORGmailto:EMC-PSTC@LISTSERV.IEEE.ORG
Emne: Re: [PSES] Conflict - cited standard vs. OJ standard
All,
I have consulted with TC 72 (the authors of the EN 54 series
All,
I have consulted with TC 72 (the authors of the EN 54 series) and they are well
aware of the problem. The long term goal is to update those parts with the
dated references but in the meantime I have the following quote from the
committee
TC 72 works closely with the group of notified
Brian,
That guidance is not quite applicable here. Only EN 50130-4 is listed in the OJ
as an EMC standard and so can be the only standard used for presumption of
conformity. The EN 54 series is a product performance set of standards and the
requirements contained therein technically have no
Dear Colleagues,
I am looking for a portable instrument to measure emissions from a light source
into the mid IR range. It is fairly easy to find equipment to cover the visible
light portion of the spectrum but I'm having difficulty identifying equipment
for the IR range especially for the 3
LiokKKlklKMmmKrm$KmkJmM
Sent from my BlackBerry
From: Bill Owsley [mailto:wdows...@yahoo.com]
Sent: Saturday, May 11, 2013 02:21 PM
To: Boštjan Glavič bostjan.gla...@siq.si
Cc: EMC-PSTC@LISTSERV.IEEE.ORG EMC-PSTC@LISTSERV.IEEE.ORG
Subject: Re: [PSES] safety 60950 and surge
Hi David,
The changes in 2008 were to Annex E and F
Annex E had a correction to the calculation for the Immunity to message
substitution formula
Annex F had a correction to the 1st diagram replacing the value in
abscissa 10 s with 5 s.
The interpretation sheet IS1 was issued separately
Dear Colleagues,
I am trying to contact the convenor or a member the of IEC TC77 working group
that produced IEC 61000-6-2. My working group for EMC requirements in alarm
systems would like to consult with them. If anybody has some contact details
could you please forward them to me offline
Hi Daniel,
We have a PSTN 21 system also and when Genesys went belly up a new company
with limited resources to look after Genesys products was formed by the former
principal of Genesys. You can contact him at
Evans Test Engineering
Turnkey Test Measurement Solutions
Unit 15
Victoria House
Dear Colleagues,
In my standards working group we are reviewing the test level for radiated
immunity. Some members of the group have proposed that in GSM bands we raise
the test level to 30 V/m. The proposal is based on a GSM base station located
on the roof of the building housing the
17 matches
Mail list logo