George re vive clamp what a great idea I have had some trouble with the
rubber jaws themselves pulling out of the clamp. who makes the prometal
vice clamp   is it some thing I can  get from home depot here in Canada?

jeremy ingle

GEORGE HUSON wrote:

> Pat,
> On bore-thru I add an additional clamp behind RK's
> puller, I use the Pro Metal Vice Clamp from GS #8288
> with a wide body screw clamp that I made. I found that
> by adding twice the clamp surface, you can pull almost
> any standard head with very little heat, and the
> bore-thru's with about the same heat that you need for
> a standard head with one clamp. I use a mini butane,
> heat the head, add a little tension, wait 1 minute,
> reheat and pull the head, Hope this helps.
>
> George Huson
> ByGeorge Custom Clubs
>
> --- [EMAIL PROTECTED] wrote:
> > $10 to pull and save the shaft? I just finished
> > pulling the head and I have to tell you that ranks
> > up there with the 975's as one of the most difficult
> > heads to pull. I am still having problems with the
> > shaft slipping through the rubber clamp on Kennedy's
> > puller. I guess I just don't have enough confidence
> > to apply the pressure needed without the fear of
> > smashing the shaft. $110 sounds reasonable enough.
> > Thanks for your quick responses.
> > Pat McGoldrick--On Target Golf
> > [EMAIL PROTECTED]
> >
> > --- Original Message -----
> >   From: [EMAIL PROTECTED]
> >   To: [EMAIL PROTECTED]
> >   Sent: Wednesday, September 24, 2003 8:55 PM
> >   Subject: Re: ShopTalk: FUJIKURA RESHAFT
> >
> >
> >   In a message dated 9/24/03 4:03:03 PM Pacific
> > Daylight Time, [EMAIL PROTECTED] writes:
> >
> >
> >
> >
> >     I have a customer that wants his GBB II
> > reshafted with a Vista Pro 60 shaft, could someone
> > give me some kind of indication of the going rate
> > for a reshaft with this shaft? This will be my first
> > reshaft of the GBB II and my first experience with
> > any Fujikura shaft. TIA
> >     Pat McGoldrick--On Target Golf
> >     [EMAIL PROTECTED]
> >
> >
> >
> >   Hi Pat,
> >   I charge $10.00 for the pull, $70.00 for the
> > shaft, $19.00 on the build including spineing and
> > flowing, and $10.00 on the bore thru, so that's
> > $109.00, if they just want it stuck with the logo up
> > or down without spineing and flowing the build is
> > $9.00 instead of $19.00.
> >   David
> >

Reply via email to