The new draft looks good to me.

Jari

Alain Durand kirjoitti:
I'd like to start a one week wg last call on 
draft-ietf-softwire-ds-lite-tunnel-option-07.
http://www.ietf.org/internet-drafts/draft-ietf-softwire-ds-lite-tunnel-option-07.txt

History and rationale for a 1 week last call:
The softwire wg had a regular 2 week wg last call on the -05 version. That 
version was sent to IESG,
An issue was raised during IESG review: do we need to define 2 options for 
DS-Lite: one FQDN based and one IP based.
-05 was defining both. As a response to IESG comments, -06 was published to 
removed the FQDN option.
Further discussion followed, and the Softwire chairs declared a consensus to 
define only one option, but
to choose the FQDN one instead of the IP option.

The draft authors have reflected this change in the -07. In order to verify the 
above consensus, I am starting
this one week-long wg last call.

I'm also asking Ted Lemon, DHC workign group chair, Cc: here, to start a 
similar last call in the DHC wg.

The Softwire last call will end on 12/17/2010.

Alain Durand, Softwire co-chair.




_______________________________________________
Softwires mailing list
Softwires@ietf.org
https://www.ietf.org/mailman/listinfo/softwires

Reply via email to