We have done these in a range from light hazard to Ord
Gp 1, depending on the configuration and what the
insurance carrier had recommended. So, you could be
looking at minimum design densities of .10/1500 for
light hazard to .015/1500 for Ord Gp 1, again
depending on if an insurance carrier is involved.

Loren Johnson - CFPS, CET
Fire Systems Consultant
The Hitchcock Company
Peoria, IL
--- Richard Lindner <[EMAIL PROTECTED]> wrote:

> The ones I have designed for were light hazard and
> we did double interlock
> dry pipe based on input from the owner.
> 
> On Tue, Jun 3, 2008 at 10:28 AM, Joe Burtell
> <[EMAIL PROTECTED]> wrote:
> 
> > Can anyone point me in the right direction for
> design criteria for a data
> > center? All we know so far is I have data storage
> and battery racks about
> > 7'
> > tall. This room is roughly 15,000 sq. ft.
> >
> > Best regards,
> >
> > Joe Burtell, SET, CFPS
> > Burtell Fire Protection, Inc.
> > Phone: 406.652.7697
> > Fax: 406.652.7743
> > Cell: 406.861.4507
> > Email: [EMAIL PROTECTED]
> > Web Site: http://www.burtellfire.com
> >
> >
> > _______________________________________________
> > Sprinklerforum mailing list
> > [email protected]
> >
>
http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum
> >
> > To Unsubscribe, send an email
>
to:[EMAIL PROTECTED]<[EMAIL PROTECTED]>
> > (Put the word unsubscribe in the subject field)
> >
> _______________________________________________
> Sprinklerforum mailing list
> [email protected]
>
http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum
> 
> To Unsubscribe, send an email
> to:[EMAIL PROTECTED]
> (Put the word unsubscribe in the subject field)
> 



      
_______________________________________________
Sprinklerforum mailing list
[email protected]
http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum

To Unsubscribe, send an email to:[EMAIL PROTECTED]
(Put the word unsubscribe in the subject field)

Reply via email to